The document is a request for variation authorization for contract JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003. It details proposed changes to items like earthworks, drainage works, and structures. The proposed changes would result in a net addition of RM261,773.00 to the original contract value. Engineer and construction manager comments are provided agreeing to the proposed variation. The employer's representative and employer authorize the variation.

Uploaded by

sspshuhaimi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views

Request For Variation Authorization

The document is a request for variation authorization for contract JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003. It details proposed changes to items like earthworks, drainage works, and structures. The proposed changes would result in a net addition of RM261,773.00 to the original contract value. Engineer and construction manager comments are provided agreeing to the proposed variation. The employer's representative and employer authorize the variation.

Uploaded by

sspshuhaimi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

(570244-T)

REQUEST FOR VARIATION AUTHORIZATION


CONTRACT TITLE JOB NO. : PROPOSED SUNGAI BUAYA INTERCHANGE AND TOLL PLAZA : PLS/SPD/C3/UUD/INTCNG/2010-0003
VARIATION PROPOSAL NO. ALLOCATED VARIATION ORDER NO.

: :

VP/001 VC /001

1. Description of Proposed Varied Works

Construction drawings & revised construction drawings i) Roadworks & drainage ii) Structure-sump size revised & structual details af sump produced No. 002 Letter ref. no. (2)dlm.JPS.Sel.010/1/50/1 & (7)dlm.JPS.Sel.010/1/50/1 1) Roadworks - to synchronize with drawings approved by MHA 2) Drainage - as per JPS requirement made 3) Structure - sump size revised & structural details of sumps produced RM 261,773.00 (nett addition / omission)

Site Instruction No. Letter / Document of Authority Reason for the Variation

: : :

Engineer's Estimate

Date

: ____________________________ ENGINEER / ENGINEER'S REPRESENTATIVE

2. Comments :

SEPAKAT SETIA PERUNDING SDN BHD

Date

: _____________________________ CONSTRUCTION MANAGER


OPUS MANAGEMENT SDN BHD

3. Comments :

Date

: _____________________________ SURIANA BTE ABDUL HAMID


SENIOR GENERAL MANAGER PROCUREMENT AND CONTRACT OPUS MANAGEMENT SDN BHD

= RM0.00 4 Previous cumulative amount from VP/ Amount expended under this SI No: 002 = RM261,773.00 Cumulative amount expended under this Provisional Sum Item

RM 261,773.00

The above variation is in order Date : employer's representative 5. Authorized for Issue Date : Employer

Form VAR 1

MRR

REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : SITE INSTRUCTION NO . : 002 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM) FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003 PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM) LUMP SUM/PROV.ADJUSTMENT OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)

3.0 3.2

Eathwork and Ground Treatment Excavate, Load, Haul and Deposit Excavate suitable material in cuttings or in bulk in the open (provisional) Fill, Spread, Grade and Compact Suitable material from common excavation as fill in embankment, benches, below culvert Drainage

cu.m

6.00

25,547.76

153,286.57

3.5

cu.m

1.00

100,562.08

100,562.08

4.0

15,856.75

4.0

Structure- sump size revised

7,932.40

SUB TOTAL CARRIED FORWARD (RM) TOTAL

269,705.40 269,705.40 * NET OMISSION/ ADDITION (RM)

7,932.40 7,932.40 261,773.00 * NET OMISSION/ ADDITION (RM)

* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement

PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS CUMULATIVE ESTIMATE OF PREVIOUS ESTIMATED VARIATIONS ISSUED CEILING PRICE CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE PREVAILING ESTIMATED CEILING PRICE

ENGINEER / ENGINEER'S REPRESENTATIVE Date:

REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : 005 SITE INSTRUCTION NO . : 006 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM) FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/Q1H0/S2/UUD/INTCNG/2009-0003 PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM) 269,705.40 7,932.40 LUMP SUM/PROV.ADJUSTMENT OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)

Sub-Total Brought Forward (RM) 2.0 2.1 Geotechnical Treatment of Soft Ground Areas Using Stone Wall Column With Stone Column treatment (original Bill of Quantities) 2.1.1 Supply, deliver and install stone wall columns of 1.0m dia (provisional) With Stone Column treatment (Construction Drawing Rev. A) 2.2.1 Supply, deliver and install stone wall columns of 1.0m dia (provisional)

76.00

209,842.00

15,947,992.00

2.2

76.00

149,454.00

11,358,504.00

TOTAL

16,217,697.40 * NET OMISSION/ ADDITION (RM)

11,366,436.40 -4,851,261.00 * NET OMISSION/ ADDITION (RM)

* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement

PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS CUMULATIVE ESTIMATE OF PREVIOUS ESTIMATED VARIATIONS ISSUED CEILING PRICE CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE PREVAILING ESTIMATED CEILING PRICE

ENGINEER / ENGINEER'S REPRESENTATIVE Date:

REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : SITE INSTRUCTION NO . : 002 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM)

FORM VAR 1 - PAGE 1 OF

JOB NO. : PLS/SPD/C3/UU PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)

LUMP SUM/PRO OMISSION QTY

3.0 3.2

Eathwork and Ground Treatment Excavate, Load, Haul and Deposit Excavate suitable material in cuttings or in bulk in the open (provisional) W / SBI / HR70 / EX / AL / 3.0 Longitudinal Profile for MCAO CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 15,592.944 cu.m (cut) 16,684.718 cu.m (cut) W / SBI / HR70 / EX / AL / 3.1 Longitudinal Profile for MCAO CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 33,084.36 cu.m (cut) 22,158.204 cu.m (cut) W / SBI / HR70 / EX / AL / 3.7 Longitudinal Profile for MCR3 CH.-706.438 TO CH.0.000 - Rev. 0 Rev. A 62,618.293 cu.m (cut) 20,371.500 cu.m (cut) W / SBI / HR70 / EX / AL / 3.8 Longitudinal Profile for MCR3 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 3,650.862 cu.m (cut) 12,471.899 cu.m (cut) W / SBI / HR70 / EX / AL / 3.9.1 Longitudinal Profile for MCR3 CH.1400.000 TO CH.1699.272 - Rev. 0 Rev. A 7,485.024 cu.m (cut) W / SBI / HR70 / EX / AL / 3.11 Longitudinal Profile for MCR4 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 56.672 cu.m (cut) 25,450.435 cu.m (cut) W / SBI / HR70 / EX / AL / 3.12 Longitudinal Profile for MCR4 CH.1400.000 TO CH.2100.000 - Rev. 0 Rev. A 38,163.801 cu.m (cut) 22,997.39 cu.m (cut)

cu.m

6.00

1,091.774

6,550.64

cu.m

6.00

-10,926.156

-65,556.94

cu.m

6.00

-42,246.793

-253,480.76

cu.m

6.00

8,821.037

52,926.22

cu.m

6.00

7,485.024

44,910.14

cu.m

6.00

25,393.763

152,362.58

cu.m

6.00

-15,166.410

-90,998.46

3.5

Fill, Spread, Grade and Compact Suitable material from common excavation as fill in embankment, benches, below culvert

cu.m

1.00

W / SBI / HR70 / EX / AL / 3.0 Longitudinal Profile for MCAO CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 96,224.256 cu.m(fill) 79,414.246 cu.m (fill) W / SBI / HR70 / EX / AL / 3.1 Longitudinal Profile for MCAO CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 50,473.92 cu.m (fill) 29,700.756 cu.m (fill) W / SBI / HR70 / EX / AL / 3.2 Longitudinal Profile for MCAO CH.1400.000 TO CH.1815.927 - Rev. 0 Rev. A 173,443.00 cu.m (fill) 146,098.390 cu.m (fill) W / SBI / HR70 / EX / AL / 3.7 Longitudinal Profile for MCR3 CH.-706.438 TO CH.0.000 - Rev. 0 Rev. A 31,090.278 cu.m (fill) 39,070.247 cu.m (fill) W / SBI / HR70 / EX / AL / 3.8 Longitudinal Profile for MCR3 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 15,238.882 cu.m (fill) 7,993.123 cu.m (fill) W / SBI / HR70 / EX / AL / 3.9 Longitudinal Profile for MCR3 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 602.893 cu.m (fill) 5,183.106 cu.m (fill) W / SBI / HR70 / EX / AL / 3.10 Longitudinal Profile for MCR4 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 4,687.707 cu.m (fill) 4,687.707 cu.m (fill) W / SBI / HR70 / EX / AL / 3.11 Longitudinal Profile for MCR4 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 296,175.590 cu.m (fill) 257,707.960 cu.m (fill) W / SBI / HR70 / EX / AL / 3.12 Longitudinal Profile for MCR4 CH.1400.000 TO CH.2100.000 - Rev. 0 Rev. A 16,357.840 cu.m (fill) 13,876.750 cu.m (fill)

16,810.010

20,773.164

27,344.610

7,979.969

7,245.76

4,580.213

38,467.630

2,481.090

4.0

Drainage W/SBI/HR70/IN/DR/2.3 - Drainage layout plan (sheet 1 of 7) a) Detention Pond no. 1 W/SBI/HR70/IN/DR/2.2 - Drainage layout plan (sheet 2 of 7) - Rev. 0 a) RCP1a 900mm -20m b) RCP2 1800mm, class -167m c) TD9a (600 x 600)mm-70m d) RC sump no.6 (1500 x 900)mm x 2m depth no. 8,661.75

15,856.75 1.0 8661.75

lin.m lin.m lin.m no.

350.00 2,000.00 80.00 3,500.00

20m 167m 70m 1.0

7,000.00 334,000.00 5,600.00 3,500.00

- Rev. A a) RCP2a 1200mm - 20m b) RCP2 1800mm, class - 170m c) TD 9a (600 x 600)mm - 70m (omitted) d) RC Sump no.6 (1500 x 900)mm x 2m depth (omitted) e) Sump 7a (1800 x 1800)mm x 2m depth W/SBI/HR70/IN/DR/2.3 - Drainage layout plan (sheet 3 of 7) - Rev. 0 a) CRCSD 6 (450 x 300)mm - 15m b) 300mm VD9b- 60m c) 300mm VD9c- 96m d) (500 x 500)mm sub-soil- 47m - Rev. A a) CRCSD 6 (450 x 300)mm x 20m b) 300mm VD9e- 62m c) 300mm VD9b- 60m (omitted) d) (500x 500)mm sub-soil- 47m (omitted) e) TD25a (600 x 600)mm x 190m f) 300mm VD9f -59m

lin.m lin.m lin.m no. lin.m

800.00 1,500.00 80.00 5,000.00 80.00

20m 170m 70m 1.0 1.0

20m 170m

16,000.00 255,000.00

lin.m lin.m lin.m lin.m

100.00 75.00 75.00 80.00

15m 60m 96m 47m

lin.m lin.m lin.m lin.m lin.m lin.m

100.00 75.00 75.00 80.00 80.00 75.00

20m 62m 60m 47m 190m 59m

W/SBI/HR70/IN/DR/2.5 - Drainage layout plan (sheet 5 of 7) - Rev. 0 a) Rock toe -110.5m b) RC sump no.15 (2400 x 900)mm x 4m depth c) CRCUD 6 (2100W x 1800D) - 45m d) RC sump (2400 x 2400)x 3m depth - Rev. A a) Rock toe- 110.5m (omitted) b) RC sump no.15 (2400 x 900)mm x 4m depth (omitted) c) CRCSD 6 (2100 x 800)mm -55m d) RC sump (1800 x 3000)mm x 5m depth e) Detention pond no.2 (added) W/SBI/HR70/IN/DR/2.6 - Drainage layout plan (sheet 6 of 7) - Rev. 0 a) RCP6 1500mm, class -60m b) RCP7 1500mm -86m c) RC sump no.3 (2100 x 2100)mm - 2m d) CRCSD6 (450 x 30)0mm - 16m e) Rock toe - 320m f) (500 x 500)mm sub-soil - 220m - Rev. A a) RCP6 1800mm62m b) RCP7 1800mm- 88m c) RC sump no. 3 (2400 x 2100)mm x 3m depth

cu.m no. lin.m no.

60.00 3,500.00 80.00 3,500.00

110.5m 1.0 45m 1.0

cu.m no. lin.m no. no.

60.00 3,500.00 140.00 3,500.00 8,361.75

110.5m 1.0 55m 1.0 1.0

lin.m lin.m no. lin.m cu.m lin.m

1,200.00 1,200.00 3,500.00 100.00 60.00 80.00

60m 86m 1.0 16m 320m 220m

lin.m lin.m no.

1,500.00 1,500.00 3,500.00

62m 88m 1.00

d) CRCSD 6 (450 x 300)mm - 21m e) Rock toe - 320m (omitted) f) (500 x 500)mm sub-soil- 220m (omitted)

lin.m cu.m lin.m

100.00 60.00 80.00

21m 320m 220m

4.0

Structure- sump size revised

7,932.40

SUB TOTAL CARRIED FORWARD (RM) TOTAL

15,856.75 15,856.75 * NET OMISSION/ ADDITION (RM)

7,932.40 7,932.40 7,924.35

* NET OMISSION/ ADD

* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement

PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM

PREVIOUS CUMULATIVE ESTIMATE OF VARIATIONS ISSUED ENGINEER / ENGINEER'S REPRESENTATIVE Date: CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE

OR VARIATION AUTHORIZATION FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003 LUMP SUM/PROV.ADJUSTMENT ADDITION AMOUNT QTY AMOUNT (RM) (RM)

* NET OMISSION/ ADDITION (RM) PMT (CONTRACTS UNIT) USE ONLY ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS ESTIMATED CEILING PRICE PREVAILING ESTIMATED CEILING PRICE