Request For Variation Authorization
Request For Variation Authorization
: :
VP/001 VC /001
Construction drawings & revised construction drawings i) Roadworks & drainage ii) Structure-sump size revised & structual details af sump produced No. 002 Letter ref. no. (2)dlm.JPS.Sel.010/1/50/1 & (7)dlm.JPS.Sel.010/1/50/1 1) Roadworks - to synchronize with drawings approved by MHA 2) Drainage - as per JPS requirement made 3) Structure - sump size revised & structural details of sumps produced RM 261,773.00 (nett addition / omission)
Site Instruction No. Letter / Document of Authority Reason for the Variation
: : :
Engineer's Estimate
Date
2. Comments :
Date
3. Comments :
Date
= RM0.00 4 Previous cumulative amount from VP/ Amount expended under this SI No: 002 = RM261,773.00 Cumulative amount expended under this Provisional Sum Item
RM 261,773.00
The above variation is in order Date : employer's representative 5. Authorized for Issue Date : Employer
Form VAR 1
MRR
REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : SITE INSTRUCTION NO . : 002 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM) FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003 PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM) LUMP SUM/PROV.ADJUSTMENT OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)
3.0 3.2
Eathwork and Ground Treatment Excavate, Load, Haul and Deposit Excavate suitable material in cuttings or in bulk in the open (provisional) Fill, Spread, Grade and Compact Suitable material from common excavation as fill in embankment, benches, below culvert Drainage
cu.m
6.00
25,547.76
153,286.57
3.5
cu.m
1.00
100,562.08
100,562.08
4.0
15,856.75
4.0
7,932.40
* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement
PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS CUMULATIVE ESTIMATE OF PREVIOUS ESTIMATED VARIATIONS ISSUED CEILING PRICE CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE PREVAILING ESTIMATED CEILING PRICE
REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : 005 SITE INSTRUCTION NO . : 006 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM) FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/Q1H0/S2/UUD/INTCNG/2009-0003 PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM) 269,705.40 7,932.40 LUMP SUM/PROV.ADJUSTMENT OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)
Sub-Total Brought Forward (RM) 2.0 2.1 Geotechnical Treatment of Soft Ground Areas Using Stone Wall Column With Stone Column treatment (original Bill of Quantities) 2.1.1 Supply, deliver and install stone wall columns of 1.0m dia (provisional) With Stone Column treatment (Construction Drawing Rev. A) 2.2.1 Supply, deliver and install stone wall columns of 1.0m dia (provisional)
76.00
209,842.00
15,947,992.00
2.2
76.00
149,454.00
11,358,504.00
TOTAL
* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement
PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS CUMULATIVE ESTIMATE OF PREVIOUS ESTIMATED VARIATIONS ISSUED CEILING PRICE CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE PREVAILING ESTIMATED CEILING PRICE
REQUEST FOR VARIATION AUTHORIZATION DETAILS OF VARATION PROPOSAL NO. : SITE INSTRUCTION NO . : 002 ITEM NO. ITEM DESCRIPTION UNIT RATE (RM)
JOB NO. : PLS/SPD/C3/UU PROVISIONAL VALUE ADJUSTMENTS OMISSION ADDITION QTY AMOUNT QTY AMOUNT (RM) (RM)
3.0 3.2
Eathwork and Ground Treatment Excavate, Load, Haul and Deposit Excavate suitable material in cuttings or in bulk in the open (provisional) W / SBI / HR70 / EX / AL / 3.0 Longitudinal Profile for MCAO CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 15,592.944 cu.m (cut) 16,684.718 cu.m (cut) W / SBI / HR70 / EX / AL / 3.1 Longitudinal Profile for MCAO CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 33,084.36 cu.m (cut) 22,158.204 cu.m (cut) W / SBI / HR70 / EX / AL / 3.7 Longitudinal Profile for MCR3 CH.-706.438 TO CH.0.000 - Rev. 0 Rev. A 62,618.293 cu.m (cut) 20,371.500 cu.m (cut) W / SBI / HR70 / EX / AL / 3.8 Longitudinal Profile for MCR3 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 3,650.862 cu.m (cut) 12,471.899 cu.m (cut) W / SBI / HR70 / EX / AL / 3.9.1 Longitudinal Profile for MCR3 CH.1400.000 TO CH.1699.272 - Rev. 0 Rev. A 7,485.024 cu.m (cut) W / SBI / HR70 / EX / AL / 3.11 Longitudinal Profile for MCR4 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 56.672 cu.m (cut) 25,450.435 cu.m (cut) W / SBI / HR70 / EX / AL / 3.12 Longitudinal Profile for MCR4 CH.1400.000 TO CH.2100.000 - Rev. 0 Rev. A 38,163.801 cu.m (cut) 22,997.39 cu.m (cut)
cu.m
6.00
1,091.774
6,550.64
cu.m
6.00
-10,926.156
-65,556.94
cu.m
6.00
-42,246.793
-253,480.76
cu.m
6.00
8,821.037
52,926.22
cu.m
6.00
7,485.024
44,910.14
cu.m
6.00
25,393.763
152,362.58
cu.m
6.00
-15,166.410
-90,998.46
3.5
Fill, Spread, Grade and Compact Suitable material from common excavation as fill in embankment, benches, below culvert
cu.m
1.00
W / SBI / HR70 / EX / AL / 3.0 Longitudinal Profile for MCAO CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 96,224.256 cu.m(fill) 79,414.246 cu.m (fill) W / SBI / HR70 / EX / AL / 3.1 Longitudinal Profile for MCAO CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 50,473.92 cu.m (fill) 29,700.756 cu.m (fill) W / SBI / HR70 / EX / AL / 3.2 Longitudinal Profile for MCAO CH.1400.000 TO CH.1815.927 - Rev. 0 Rev. A 173,443.00 cu.m (fill) 146,098.390 cu.m (fill) W / SBI / HR70 / EX / AL / 3.7 Longitudinal Profile for MCR3 CH.-706.438 TO CH.0.000 - Rev. 0 Rev. A 31,090.278 cu.m (fill) 39,070.247 cu.m (fill) W / SBI / HR70 / EX / AL / 3.8 Longitudinal Profile for MCR3 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 15,238.882 cu.m (fill) 7,993.123 cu.m (fill) W / SBI / HR70 / EX / AL / 3.9 Longitudinal Profile for MCR3 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 602.893 cu.m (fill) 5,183.106 cu.m (fill) W / SBI / HR70 / EX / AL / 3.10 Longitudinal Profile for MCR4 CH.0.000 TO CH.700.000 - Rev. 0 Rev. A 4,687.707 cu.m (fill) 4,687.707 cu.m (fill) W / SBI / HR70 / EX / AL / 3.11 Longitudinal Profile for MCR4 CH.700.000 TO CH.1400.000 - Rev. 0 Rev. A 296,175.590 cu.m (fill) 257,707.960 cu.m (fill) W / SBI / HR70 / EX / AL / 3.12 Longitudinal Profile for MCR4 CH.1400.000 TO CH.2100.000 - Rev. 0 Rev. A 16,357.840 cu.m (fill) 13,876.750 cu.m (fill)
16,810.010
20,773.164
27,344.610
7,979.969
7,245.76
4,580.213
38,467.630
2,481.090
4.0
Drainage W/SBI/HR70/IN/DR/2.3 - Drainage layout plan (sheet 1 of 7) a) Detention Pond no. 1 W/SBI/HR70/IN/DR/2.2 - Drainage layout plan (sheet 2 of 7) - Rev. 0 a) RCP1a 900mm -20m b) RCP2 1800mm, class -167m c) TD9a (600 x 600)mm-70m d) RC sump no.6 (1500 x 900)mm x 2m depth no. 8,661.75
- Rev. A a) RCP2a 1200mm - 20m b) RCP2 1800mm, class - 170m c) TD 9a (600 x 600)mm - 70m (omitted) d) RC Sump no.6 (1500 x 900)mm x 2m depth (omitted) e) Sump 7a (1800 x 1800)mm x 2m depth W/SBI/HR70/IN/DR/2.3 - Drainage layout plan (sheet 3 of 7) - Rev. 0 a) CRCSD 6 (450 x 300)mm - 15m b) 300mm VD9b- 60m c) 300mm VD9c- 96m d) (500 x 500)mm sub-soil- 47m - Rev. A a) CRCSD 6 (450 x 300)mm x 20m b) 300mm VD9e- 62m c) 300mm VD9b- 60m (omitted) d) (500x 500)mm sub-soil- 47m (omitted) e) TD25a (600 x 600)mm x 190m f) 300mm VD9f -59m
20m 170m
16,000.00 255,000.00
W/SBI/HR70/IN/DR/2.5 - Drainage layout plan (sheet 5 of 7) - Rev. 0 a) Rock toe -110.5m b) RC sump no.15 (2400 x 900)mm x 4m depth c) CRCUD 6 (2100W x 1800D) - 45m d) RC sump (2400 x 2400)x 3m depth - Rev. A a) Rock toe- 110.5m (omitted) b) RC sump no.15 (2400 x 900)mm x 4m depth (omitted) c) CRCSD 6 (2100 x 800)mm -55m d) RC sump (1800 x 3000)mm x 5m depth e) Detention pond no.2 (added) W/SBI/HR70/IN/DR/2.6 - Drainage layout plan (sheet 6 of 7) - Rev. 0 a) RCP6 1500mm, class -60m b) RCP7 1500mm -86m c) RC sump no.3 (2100 x 2100)mm - 2m d) CRCSD6 (450 x 30)0mm - 16m e) Rock toe - 320m f) (500 x 500)mm sub-soil - 220m - Rev. A a) RCP6 1800mm62m b) RCP7 1800mm- 88m c) RC sump no. 3 (2400 x 2100)mm x 3m depth
d) CRCSD 6 (450 x 300)mm - 21m e) Rock toe - 320m (omitted) f) (500 x 500)mm sub-soil- 220m (omitted)
4.0
7,932.40
* Delete as appropriate ** Engineer 's Estimate All works will be subjected to remeasurement
PMT (CONTRACTS UNIT) USE ONLY ESTIMATE NET EFFECT TO TENDER SUM
PREVIOUS CUMULATIVE ESTIMATE OF VARIATIONS ISSUED ENGINEER / ENGINEER'S REPRESENTATIVE Date: CUMULATIVE ESTIMATE OF VARIATION PROPOSED TO DATE
OR VARIATION AUTHORIZATION FORM VAR 1 - PAGE 1 OF 2 JOB NO. : PLS/SPD/C3/UUD/INTCNG/2010-0003 LUMP SUM/PROV.ADJUSTMENT ADDITION AMOUNT QTY AMOUNT (RM) (RM)
* NET OMISSION/ ADDITION (RM) PMT (CONTRACTS UNIT) USE ONLY ESTIMATED CURRENT REDUCTION TO CEILING PRICE PREVIOUS ESTIMATED CEILING PRICE PREVAILING ESTIMATED CEILING PRICE