Project Name Customer Drawing Reff. / Rev P&ID No. / Rev Location / Area
: WORTEL FIELD DEVELOPMENT PROJECT : SANTOS (Sampang) Pty. Ltd. : : : System / Sub No. System Desc. Sub System Desc. : : : Tag No. I01MC
No.
1 2 3 4 5 6 7 8 9 10 11 12
Check support support material have correct specifiction and size Check support design accordance with design drawing Check support have correct dimension accordance to design drawing Check that support have completed fabrication work Check that instrument support location refer to lay out Check support installation are level, correct elevation and adequate for ladder and tray installation Check welding visualy inspected where apllicable Check that support have completed finishing work Check that Support are tight installed
Notes :
Description Company
Performed by
Witnessed / Approved by
Witnessed / Approved by