Civil Basics 123
Civil Basics 123
Plaster thinkness at celling should be 6 mm 4.Dry volume of a cc work is 3 times greater than wet volume of a cc work. 5.1 cum water weight =1000kg 6.At DPC work how much Cem-seal or Impemo require for one bag cement?=1kg 7.At DPC work how much Padlo require for one bag cement?=2.5kg 8.At brick work the joint thickness between two bricks should be= 12 mm 9.The lapping measurement at Compreesion zone should be=24D(without hook) 10.The lapping measurement at Tensile zone should be=40D(Excluding Hook) 11.One hook length shoulb be=9D 12.For crank extra length measurement should be=0.50d 13.Stirrup length measurement Equation=2(A+B)+30 cm 14.Weight of step of a staircase=11.5r (r=rise in cm) 15.MS angle weight determine equation=0.00785A 16.MS plate weight determine equation=7.85t 17.Before use a brick for brick work how many time the brick should take rest underneath the water?=2 hours 18.How much brick require for 1 sqm brick flat soling?=32 nos 19.How much brick require for 1 sqft brick flat soling?=3 nos 20.How much sand require for 1 sqm brick flat soling?=0.02 cum 21.How much brick require for 1 sqm herring bonebond?=54 nos 22.How much brick require for 1 sqft herring bonebond?=5 nos 23.How much sand require for 1sqm herring bone bond?=0.03 cum 24.How much brick require for 1 sqm edging?=8 nos 25.Cement require for 1 sqm neat cement finishing?=3kg
1.Ms Flat bar weight determine equation=0.00785A 2.Brick require for 1 square meter one brick flat soling=32nos. 3.Brick require for 1 squre meter one layer herring bone bond soling=52nos. 4.Cement require for 9.3 squre meter neat cement finishing=1/2bag or 25kg 5.A head mason can work 25-30 cum brick work in a day. 1.Lintel thickness should be 15cm. 2.Parapet wall height should be 1 meter. 3.Window height should be 120cm. 4.D.P.C thickness should be 2.5cm 5.Plinth height should be 45cm. 6.Measuremnt of riser should be 15cm. 7.Building height should be 315 cm 8.plaster thickness at ceiling should be 6mm.