Check List
Check List
Power System Check List 1 PSU Redundancy 2 PSU Redundancy On 3 PSU Connected to dual diferent source (ACPDB) 4 Power cable has label 5 Power cable management tray 6 Rectifier/UPS load 7 Grounding Transmission Connection 8 Checking LAN/WAN cable type (Cooper Cat5-6/Fibreoptic) 9 Checking uplink LAN Connection (dual homing/homing) 10 LAN/WAN Cable has label 11 Cable color coding 12 LAN/WAN Cable has cable management 13 Is there any cable obstruct fan inlet/outlet 14 Cable LAN/WAN arrangement/neatness 15 Uplink cable connected to multiple module (Checking from remote) 16 Checking is there any binding FO cable 17 Patch pannel neatness is there any unused cable still in cable management 18 Is WAN cable connect to multiple MUX or MOD 19 Rack inlet temprature is optimum or not Maximum temperature reading Average temperature reading Rack temperature indicator 20 Airflow to rack is optimum or not air flow blowing from bottom or from top Top rack temperature 21 Rack Size 19" or 21"
Yes/Ok
No/NOK
Picture if any
Comment/Value