0% found this document useful (0 votes)
177 views

Fir 01

An inspection report details that 2 units were offered and accepted with no rejections. Clearance is required from Sati.

Uploaded by

Anil Kulkarni
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
177 views

Fir 01

An inspection report details that 2 units were offered and accepted with no rejections. Clearance is required from Sati.

Uploaded by

Anil Kulkarni
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Quantity offered: 02 Details of Inspection Carried out : Dear Materail Gjgjuov

Quantity accepted: 02

Quantity rejected: NIL

Sati Reqiures clearnce from

****END OF REPORT****

You might also like