Fire Hose Station Check List: Company Forms and Check Lists
Fire Hose Station Check List: Company Forms and Check Lists
LOCATION 1 2 3 4 5 6 7 8 9 10 11 12 Forward W Mast House Fwd W Midship Fwd Manifold W Midship Fwd Manifold F Midship Aft Manifold W Midship Aft Manifold F Fwd Pump Room W Poop Deck Fwd W Poop Deck Aft W Acc. Stbd Entrance W Acc. Port Entrance W I.G. Room
HOSE DIAMETER 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm
NOZZLES DIA/TYPE MAIN DECK Jet Fog 16mm Jet Fog 16mm Jet Fog 16mm Foam 16mm Jet Fog 16mm Foam 16mm Jet Fog 16mm Jet Fog 16mm Jet Fog 16mm Jet Fog 16mm Jet Fog 16mm Jet Fog 16mm 2nd DECK
COUPLING HOSE DIAMETER SPAN 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 65mm 18m 18m 18m 18m 18m 18m 18m 18m 18m 18m 18m 18m
13 14
65mm
65mm
18m
Jet Fog 65mm 4th DECK Jet Fog 65mm Jet Fog 65mm ENGINE ROOM
15 16
Acc Port Entrance Wing Stbd 2nd Deck Fwd 2nd Deck Aft 3rd Deck 3rd Deck Aft Bottom Fwd Bottom Aft Steering Flat
17 18 19 20 21 22 23
Jet Fog 65mm Jet Fog 65mm Jet Fog 65mm Jet Fog 65mm Jet Fog 65mm Jet Fog 65mm Jet Fog 65mm PUMP ROOM
24
Middle Flat
65mm
65mm
18m
INSTRUCTIONS :
To complete on a monthly basis in conjuction with "Monthly Safety Checklist". When entries are made in the Safety Inspection Log without comments, checklist can be discarded.Last completed checklist must be attached to the Monthly Safety Checklist.
C:\FORMS\04_0005.PDF
M/T LADON