202 - (LINE) CVT (1) .Xls1

1. The document summarizes the pre-commissioning tests performed on a 400/220kV capacitor voltage transformer (CVT) at a substation in Bhutan. 2. Various electrical tests were conducted to check the insulation resistance, winding resistance, voltage ratios, and phasing of the CVT. Visual inspections were also performed to check for defects, cleanliness, tightness of connections, and documentation. 3. The tests confirmed that the CVT met factory and site test readings within acceptable tolerances and was ready for commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views

202 - (LINE) CVT (1) .Xls1

1. The document summarizes the pre-commissioning tests performed on a 400/220kV capacitor voltage transformer (CVT) at a substation in Bhutan. 2. Various electrical tests were conducted to check the insulation resistance, winding resistance, voltage ratios, and phasing of the CVT. Visual inspections were also performed to check for defects, cleanliness, tightness of connections, and documentation. 3. The tests confirmed that the CVT met factory and site test readings within acceptable tolerances and was ready for commissioning.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS

I II

REGION : DATE OF ERECTION : DETAILS OF EQUIPMENT : R-PHASE LOA NO : MAKE : TYPE : SL NO. : YEAR OF : MANUFACTURE CGL CVE: 245/1050/50 19544 2003 Y-PHASE NA NA NA NA B-PHASE CGL CVE: 245/1050/50 19545 2003 III DATE OF ENERGIZATION :

IV

V VI VII

FEEDER NAME : PRIMARY VOLTAGE :

CHUKHA LINE 220 Kv

SECONDARY DETAILS : W INDING 1 110 200 W INDING 2 110 200 W INDING 3 110 100

VOLTAGE : VA BURDEN : VIII SL. NO 1

DETAILS OF CHECKLIST : DESCRIPTION EQUPIMENT IS CLEANED AND FREE FROM DUST / DIRT FOREIGN MATERIALS ETC. EQUIPMENT IS FREE FROM ALL VISIBLE DEFECTS ON PHYSICAL INSPECTION CHECK CVT TANK HAS BEEN PROVIDED W ITH DOUBLE EARTHING CHECK THAT CVT MARSELLING BOX IS EARTHED ALL NUTS AND BOLTS ARE TIGHTENED CORRECTLY AS PER SPECIFIED TORQUE CHECK TIGHTNESS OF TERMINAL CONNECTOR ALL FITTINGS AS PER OUT LINE GENERAL ARRANGEMENT DRAW ING. LAVELLING AND IDENTIFICATION MARKING IS CARRIED OUT STATUS YES NO REMARK RECORD DEFICIENCIES, IF ANY

6 7

VOLTS VA

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS

SL. NO 9

DESCRIPTION

LEVELLING AND ALIGNMENT OF STRUCTURE AND BASE FRAME IS CHECKED ERECTION COMPLETION CERTIFICATE ALONG W ITH LIST OF OUTSTANDING ACTIVITIES REVIEW ED ANY PAINT REMOVED / SCRATCHED IN TRANSIT HAS BEEN TOUCHED UP SL. NO OF HV CAPACITOR IDENTICAL TO THE SL.NO MENTIONED ON RATING & DIG. PLATE ENSURE BRASS VENT PLUG BETW EEN STACKS OF CVT'S IS REMOVED CHECK THE OIL LEVEL AND LEAKAGE THROUGH ANY JOINTS / SEC. TERMINALS CHECK OIL DRAIN VALVE IS PROPERLY CLOSED AND LOCKED. OIL LEVEL ON TANK GAUGE GLASS BDV OF OIL SAMPLE TAKEN FROM TANK BOTTOM DRAIN VALVE CHECK SECONDARY CABLE END BOX IS PROPERLY FIXED AND ENSURE CABLE ENTRY AT THE BOTTOM. ENSURE H.F TERMINAL OF UNUSED PHASES HAS BEEN EARTHED AND NO LOAD ON H.F TERMINAL BUSHING CHECK RATING / HEALTHINESS OF FUSES AT CVT M.B AND CVT TERMINAL BOX. CHECK THAT THE NEUTRAL POINT IS EARTHED ENSURE INTERPOLE CABLING IS COMPLETED AND CHECK THE CONTINUTY. CHECK THE IR VALUE OF SECONDARY CABLE ( > 1 M OHMS FOR OUTDOOR CABLES AND ( > 10 MOHMS FOR INDOOR CABLES )

10

11

12

13

14

15

16 17

18

19

20

21 22

23

STATUS YES NO

REMARK RECORD DEFICIENCIES, IF ANY

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS

SL. NO 24

DESCRIPTION

CHECK EXTERNAL CABLING FROM M.B TO RELAY / CONTROL PANEL COMPLETED ALL THE CABLE IDENTIFICATION TAGS PROVIDED AND ALL CORES ARE PROVIDED W ITH IDENTIFICATION FERRULES AT M.B. CONTINUITY OF W INDING : (After removing Earth Link 1,2 & 3) A BETW EEN TERMINAL 1 & LINE END OF SPARK GAP ASSEMBLY B BETW EEN TERMINALS 1a - 1n C BETW EEN TERMINALS 2a - 1n D BETW EEN TERMINALS 3a - 1n

25

IX

INSULATION RESISTANCE MEASUREMENT : USING A MEGGER OF 5000 VOLT MIN : BETWEEN PRIMARY PRIMARY PRIMARY PRIMARY SECONDARY CORE 1 SECONDARY CORE 2 SECONDARY CORE 3 EARTH

XI

SECONDARY W INDING RESISTANCE IN OHMS PHASE R Y B CORE 1 FACTORY __ __ __ CORE 2 FACTORY __ __ __ CORE 3 FACTORY __ __ __ REMARK SITE 2.25 NA 2.2 __ __ __

SITE 2.76 NA 2.44

FACTORY TEST REPORT REF. NO :

STATUS YES NO

REMARK RECORD DEFICIENCIES, IF ANY

OK OK OK OK

400 M OHMS

MEASURED VALUE R-PHASE Y-PHASE B-PHASE 50 NA 42 100 NA 40 60 NA 40 50 NA 40

KMOHM KMOHM KMOHM KMOHM

SITE 2.42 NA 2.41

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS

XII

INSULATION RESISTANCE MEASUREMENT : USING A MEGGER OF 500 VOLT BETWEEN SECONDARY CORE 1 - EARTH SECONDARY CORE 2 - EARTH SECONDARY CORE 3 - EARTH CORE 1 - CORE 2 CORE 1 - CORE 3 CORE 2 - CORE 3 MEASURED VALUE R-PHASE Y-PHASE 20 NA 25 NA 25 NA 35 NA 45 NA 25 NA

XIII

VOLTAGE RATIO TEST PHASE RN RN RN YN YN YN BN BN BN PRIMARY VOLTAGE 1000 1000 1000 NA NA NA 1000 1000 1000 SECONDARY VOLTAGE THEORATI- ACTUAL BETWEEN VALUE CAL RATIO FACTORY 1a - 1 n 0.5 0.5 __ 2a - 2 n 0.5 0.5 __ 3a - 3 n 0.5 0.5 __ 1a - 1 n NA __ 2a - 2 n NA __ 3a - 3 n NA __ 1a - 1 n 0.498 0.5 __ 2a - 2 n 0.5 0.5 __ 3a - 3 n 0.499 0.5 __ RATIO SITE 0.5 0.5 0.5 NA NA NA 0.498 0.5 0.499 % ERROR 0.00 0.00 0.00 NA NA NA 0.40 0.00 0.20

XIV

ALL TERMINAL BLOCKS CLOSED IN THE SECONDARY AFTER ALL TESTING

XV

PHASING ( PHASE RELATIONSHIP ) OF CVT BY MEASURING VOLTAGE BETW EEN R-PHASE, Y-PHASE AND B-PHASE AT INCOMING TERMINAL IN CONTROL CUBICLE,FOR ONE CIRCUIT OF THE CHECKED CVT AND OUTPUT TERNINALS R-PHASE, Y-PHASE AND B-PH OF A REFERENCE CIRCUIT (EXISTING CVT) W ITH KNOW N PHASING REFERENCE CIRCUIT R-PHASE Y-PHASE B-PHASE MEASURED VALUE R-PHASE Y-PHASE NA NA NA NA NA NA

B-PHASE 175 200 200 100 100 125

MOHM MOHM MOHM MOHM MOHM MOHM

YES

B-PHASE NA NA NA

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS XVI CHECK FOR ANNUNCIATION IN CONTROL ROOM AS PER THE FOLLOW ING FORMATS AND RECORD THE READING : SL DESCRIPTION SOURCE OF NO OF TEST INITIATION A REMOVE ALL THE APPLY 110 V AC FUSE IN R, Y, B THROUGH 3-PHASE PHASE IN CVT VARIAC INTHE CVT SECONDARY JUNCTION SECONDATY CIRCUIT BOX TOW ARDS CR PANEL (i) REMOVE R-PHASE FUSE IN THE CONTROL PANEL

CR PANEL CVT FUSE

(ii) REMOVE Y-PHASE FUSE IN THE CONTROL PANEL (iii) REMOVE B-PHASE FUSE IN THE CONTROL PANEL

CR PANEL CVT FUSE

CR PANEL CVT FUSE

XVII FINAL DOCUMENTATION REVIEW : A FINAL DOCUMENT OF PRE-COMMISSIONING CHECKS REVIEW ED AND APPROVED B DOCUMENTS REGARDING SPARES,EQUIPMENT, O & M MANNUALS ETC AVAILABLE AT SITE FOR O & M PURPOSE C AFTER MODIFICATION, IF ANY, "AS BUILT DRAW INGS" ARE AVAILABLE AT SITE

SIGNATURE : NAME : DESIGNATION : ORGANISATION : CROMPTON GREAVES LTD ( SUPPLIER REPRESENTATIVE )

SIGNATURE : NAME :S.KANNADHASAN DESIGNATION :COMMISIONING ENGNIEER ORGANISATION :FOR CROMPTON GREAVES LTD ( TESTING AGENCY )

WINDOW DESCRIPTION

RESULT OK/NOTOK OK

REMARK

CVT FUSE FAILURE

OK

CVT FUSE FAILURE

OK

CVT FUSE FAILURE

OK

YES

NO

YES

NO

YES

NO

SIGNATURE : NAME : DESIGNATION : ORGANISATION :TALA HYDROELECTRIC PROJECT AUTHORITY ( CUSTOMER REPRESENTATIVE )

O LTE

CHG

ROU

VOLTECH ENGINEERS PVT LTD.

DOC NO. : SUB STATION :400/220KV S/S,BHUTAN BAY NO : 202 EQUIPMENT IDENTIFICATION NO : 202 CVT DATE OF TESTING : 08/04/06

PRE-COMMISSIONING OF CAPACITOR VOLTAGE TRANSFORMER COMMISSIONING FORMATS