Equipment Cost Estimation

The document discusses cost estimations for three plant components: a reactor, condenser, and recovery column reboiler. It lists design parameters like area, design pressure, and material factors. It also provides cost estimates in dollars calculated using cost estimation charts and formulas for stainless steel and carbon steel materials.

Uploaded by

marcelkosasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
299 views2 pages

Equipment Cost Estimation

The document discusses cost estimations for three plant components: a reactor, condenser, and recovery column reboiler. It lists design parameters like area, design pressure, and material factors. It also provides cost estimates in dollars calculated using cost estimation charts and formulas for stainless steel and carbon steel materials.

Uploaded by

marcelkosasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

3 factor: area: design pressure size exponent module factor Shell tube material factor

reactors fixed tube sheet

1.79 50 5 1 3.2 shell

m2 bar

equals equals

tube

estimmation in chart cost

a b 2.7 0.07 15544 96731.99 dollars

stainless stell formula : a +(a/100)b 3.476596562

4 factor: area: design pressure size exponent module factor Shell tube material factor

condenser fixed tube sheet

1.79 25 2 1 3.2 shell

m2 bar

equals equals

tube

estimmation in chart cost

a b 2.7 0.07 10000 62231.08 dollars

stainless steel formula : a +(a/100)b 3.476596562

8 factor: area: design pressure size exponent module factor Shell tube material factor

recovery column reboiler fixed tube sheet

1.79 4 2 1 3.2 shell

m2 bar

equals equals

tube

estimmation in chart cost

a b 1.75 0.13 4500 18856.84 dollars

carbon steel formula : a +(a/100)b 2.341010159

538.1955 73.5

ft2 psi

269.09 29

ft2 psi

43 29

ft2 psi