100% found this document useful (1 vote)
806 views

Trip Sheet For Rig

This trip sheet documents information for a well operated by ONGC. It provides details of the casing sizes and depths, drill pipe and drill collar volumes including displacement capacity, length and initial/final volumes. Shift details like date, time, present depth and reason for trip are also included, along with signatures from the shift in-charge, chemist, tool pusher and remarks.

Uploaded by

ankurume1984
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
806 views

Trip Sheet For Rig

This trip sheet documents information for a well operated by ONGC. It provides details of the casing sizes and depths, drill pipe and drill collar volumes including displacement capacity, length and initial/final volumes. Shift details like date, time, present depth and reason for trip are also included, along with signatures from the shift in-charge, chemist, tool pusher and remarks.

Uploaded by

ankurume1984
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

TRIP SHEET

Company Name: ONGC


Well Name: __________________________________________
Date & Time: _________________________________________
Casing Size & Depth: ___________________________________
All these volumes
are in bbl/m.
Displacement Vol
Capacity Vol
Length (m)
No. of stds.
P/O

Shift In-Charge

Drill Pipe
3" 13.3 ppf
0.0165
0.0243

5" 19.5 ppf


0.0246
0.0583

Length
(m)

3" 15.5 ppf


0.01926
0.02159

Rig: SAGAR KIRAN


Hole Size: ____________________________________________
Present Depth: ________________________________________
Reason: ______________________________________________

HW Drill Pipe
5" 49.3 ppf
3" 25.3 ppf
0.0589
0.0302
0.029
0.0138

8" 150.5 ppf


0.1801
0.02395

Drill Collar
6" 92.5 ppf
0.1109
0.02395

Initial Vol.

Final Vol.

Actually Filled

Theoretical

Difference

Actual Filled

Theoretical

Cumulative

A (bbl)

B (bbl)

Vol.,C = (A-B)

Vol., D

(bbl) (C-D)

Cumulative

Cumulative

Difference

Chemist

4" 46.7 ppf


0.0558
0.0161

Remarks

Tool Pusher

You might also like