Boq Ref Div Activity ID Activity Name: Substructure
Boq Ref Div Activity ID Activity Name: Substructure
Div Activity ID
Activity Name
Slab on Grade
Wateproofing Superstructure Ground Floor First Floor Second Floor Third Floor Roof Floor Rough Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Final Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Electrical Works Ground Floor First Floor Second Floor Third Floor Roof Floor Mechanical Works Ground Floor First Floor
Second Floor Third Floor Roof Floor Firefighting works Ground Floor First Floor Second Floor Third Floor Roof Floor Conveying System All Floor Close out Rough Finishes Final Finishes Electrical Works Mechanical Works Firefighting works Conveying System
BOQ Description
Qty Unit
Rate
m3 m3 m3 m3
Under mat foundations, 75 mm thick Under isolated footings, 75 mm thick Under grade beams, 50 mm thick Slab on grade including channels, pits for buildings without transformer unit
30 35 7
m3 m3 m3
1084
m3
85.70
100.00%
Amount
34,945.60 17,517.50 14,382.00 3,046.10 32,364.50 32,364.50 24,449.40 10,098.00 11,781.00 2,570.40
92,898.80