Boq Ref Div Activity ID Activity Name: Substructure

The document is a bill of quantities (BOQ) for construction works divided into substructure earth works, superstructure works for multiple floors, rough and final finishes, electrical, mechanical and firefighting works, and conveying systems. It includes activities, quantities, units, rates and amounts for items like excavation, backfilling, blinding concrete, waterproofing, and works on the ground, first, second, third and roof floors.

Uploaded by

Zitheeq Umar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Boq Ref Div Activity ID Activity Name: Substructure

The document is a bill of quantities (BOQ) for construction works divided into substructure earth works, superstructure works for multiple floors, rough and final finishes, electrical, mechanical and firefighting works, and conveying systems. It includes activities, quantities, units, rates and amounts for items like excavation, backfilling, blinding concrete, waterproofing, and works on the ground, first, second, third and roof floors.

Uploaded by

Zitheeq Umar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

BOQ Ref

Substructure Earth Works

Div Activity ID

Activity Name

Excavation Works 2 2 2 Backfilling Works 2 Concrete Works Blinding Concrete

Slab on Grade

Wateproofing Superstructure Ground Floor First Floor Second Floor Third Floor Roof Floor Rough Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Final Finishes Ground Floor First Floor Second Floor Third Floor Roof Floor Electrical Works Ground Floor First Floor Second Floor Third Floor Roof Floor Mechanical Works Ground Floor First Floor

Second Floor Third Floor Roof Floor Firefighting works Ground Floor First Floor Second Floor Third Floor Roof Floor Conveying System All Floor Close out Rough Finishes Final Finishes Electrical Works Mechanical Works Firefighting works Conveying System

BOQ Description

Qty Unit

Rate

Mat Foundations Isolated Footings Grade Beams Mat Foundations

715 470 83 1321

m3 m3 m3 m3

24.50 30.60 36.70 24.50

100.00% 100.00% 100.00% 100.00%

Under mat foundations, 75 mm thick Under isolated footings, 75 mm thick Under grade beams, 50 mm thick Slab on grade including channels, pits for buildings without transformer unit

30 35 7

m3 m3 m3

336.60 336.60 367.20

100.00% 100.00% 100.00%

1084

m3

85.70

100.00%

Amount

34,945.60 17,517.50 14,382.00 3,046.10 32,364.50 32,364.50 24,449.40 10,098.00 11,781.00 2,570.40

92,898.80