0% found this document useful (0 votes)
72 views

Rate December 2008

The document lists the finalized rates for various construction materials and labor effective December 1, 2008. It provides the rates in rupees per unit for 11 items, including coarse sand, grit, jeera, fine sand from two sources, bricks, cement, steel, and labor. The rates are noted to include all applicable taxes and there is an extra rate of 1% for Vidhan Bhawan and 10% for Sachivalay/Raj Bhawan projects.

Uploaded by

lkovijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Rate December 2008

The document lists the finalized rates for various construction materials and labor effective December 1, 2008. It provides the rates in rupees per unit for 11 items, including coarse sand, grit, jeera, fine sand from two sources, bricks, cement, steel, and labor. The rates are noted to include all applicable taxes and there is an extra rate of 1% for Vidhan Bhawan and 10% for Sachivalay/Raj Bhawan projects.

Uploaded by

lkovijay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Finalised Rate w.e.f. 01.12.

08 RATE
(As per Market Survey) Sl.No. 1 2 3 4 5 6 7 8 9 10 11 Note :Material Coarse Sand Grit - 1/2" Grit - 3/4" Jeera Fine Sand (Ganga) Fine Sand (Ghaghra) Brick (Trucks) Cement Steel Material Labour Amount (in Rs.) Rs. 950.00 Rs. 1580.00 Rs. 1580.00 Rs. 1410.00 Rs. 565.00 Rs. 565.00 Rs. 2800.00 Rs. 210.00 Rs. 42/-Kg. Rs. 1% Extra for Vidhan Bhawan/ Rs. 10% Sachivalay/Raj Bhawan

The Rate's are inclusive of all taxes.

You might also like