QUESTION: A Manufacturing Firm Has Designed A Training Program That Is Supposed To Increase The

The personal manager analyzed data from 20 employees who underwent a new training program to examine the claim that the program increased productivity. The data showed the productivity level and percent raise in productivity for each employee. A scatter plot of this data revealed a positive relationship where productivity levels tended to increase with higher percentages of raised productivity. This positive relationship supported the inference that the training program was successful in increasing employee productivity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views2 pages

QUESTION: A Manufacturing Firm Has Designed A Training Program That Is Supposed To Increase The

The personal manager analyzed data from 20 employees who underwent a new training program to examine the claim that the program increased productivity. The data showed the productivity level and percent raise in productivity for each employee. A scatter plot of this data revealed a positive relationship where productivity levels tended to increase with higher percentages of raised productivity. This positive relationship supported the inference that the training program was successful in increasing employee productivity.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

QUESTION: A manufacturing firm has designed a training program that is supposed to increase the

productivity of employees. The personal manager decides to examine this claim by analyzing the data
results from 1
st
group of 20 employees. The following table shows the result.


%Raise in productivity vs. productivity

employee no. Productivity,X %Raise in prod,Y
1 47 4.2
2 71 8.1
3 64 6.8
4 35 4.3
5 43 5
6 60 7.5
7 38 4.7
8 59 5.9
9 67 6.9
10 56 5.7
11 67 5.7
12 57 5.4
13 69 7.5
14 38 3.8
15 54 5.9
16 76 6.3
17 53 5.7
18 40 4
19 47 5.5
20 23 2.2








Scatter plot showing the relation between percent Raise in productivity Vs productivity








INFERENCE
1. As productivity increases then there is a tendency for percent raise in productivity to increase.
2. This indicates positive relationship between both parameters.
3. Hence, the training program is a success.


0
1
2
3
4
5
6
7
8
9
0 10 20 30 40 50 60 70 80
%
R
a
i
s
e

i
n

p
r
o
d
,
Y

productivity,X
%Raise in productivity Vs Productivity

You might also like