This document is a material inspection request form used by a contractor and consultant to request and approve inspections of materials for a construction project. It lists the project disciplines and spaces for signatures to indicate approval or disapproval of materials. Upon completion, the original goes to the consultant, a copy with stamp to the contractor, and a copy to the consultant site office.

Uploaded by

freann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
2K views2 pages

8 - Material Inspection Request

This document is a material inspection request form used by a contractor and consultant to request and approve inspections of materials for a construction project. It lists the project disciplines and spaces for signatures to indicate approval or disapproval of materials. Upon completion, the original goes to the consultant, a copy with stamp to the contractor, and a copy to the consultant site office.

Uploaded by

freann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

MIR NO.

: CIVIL
REQUEST DATES & TIME : ARCH.
INSPECTION DATE & TIME : MECH.
APPROVED MATERIAL SUBMITTAL NO. : ELECT.
DELIVERY RECIEPT NO. :
Approval Disapproval
Surveyor Survey Engineer
Civil Engineer Civil Engineer
Architect Architect
Electrical Engineer Electrical Engineer
Mechanical Engineer Mechanical Engineer
QA/QC Engineer
Consultant Representitive: Signature:________________ Date:______________
Consultant: Original Contractor: Copy with Stamp Consultant Site Office: Copy
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)
C:/RTCC/FM:CO:22
Final Comments
Consultant
HAK Architecture &
Engineering
Consultant
Owner
REVISION 0
Consultant Representitive Comments:
Survey Engineer Civil Engineer Architect Engineer Electrical Engineer Mechanical Engineer
FM:CO:053
MATERIAL INSPECTION REQUEST
DESCRIPTION :
Signature Consultant Signature Contractor
Contractor
Al-Rashid Trading &
Contracting Company
Ltd.
Page 1 of 2
MIR NO. :

CIVIL
REQUEST DATES & TIME :

ARCH.
INSPECTION DATE & TIME :

MECH.
APPROVED MATERIAL SUBMITTAL NO. :

ELECT.
DELIVERY RECIEPT NO. :
Appr DisApp






Consultant Representitive: Signature: Date:
(Authority to proceed with work does not relieve the contractor from contractual responsibilities)
Final Comments
Consultant: Original Contractor: Copy with Stamp Consultant Site Office: Copy
Survey Engineer
Civil Engineer
Civil Engineer Architect Engineer Electrical Engineer Mechanical Engineer
Consultant Representitive Comments:
Civil Engineer
Signature
Mechanical Engineer
Architect
Electrical Engineer
Architect
Electrical Engineer
Mechanical Engineer
QA/QC Engineer
Survey Engineer
FM:CO:053
Contractor Owner
MATERIAL INSPECTION REQUEST
DESCRIPTION :
Contractor Signature
Surveyor
Consultant
Al-Rashid Trading &
Contracting Company Ltd.
Consultant
Al-Rashid Trading &
Contracting Company Ltd.
Page 2 of 2

You might also like