0% found this document useful (0 votes)
42 views

Structure

This document provides details about asset mapping and maintenance processes for Railtel in the Eastern Region of India. It lists the specific section and equipment being mapped, including the Kharagpur-Jokpur subsection and KGP FSP 3000.1 2OSCM V1630 card. It also outlines the standard processes for creating work orders, allocating resources, executing maintenance work, and closing work orders in Oracle eAM. Finally, it lists several types of reports covered in the enterprise asset management system.

Uploaded by

priyasingh1682
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Structure

This document provides details about asset mapping and maintenance processes for Railtel in the Eastern Region of India. It lists the specific section and equipment being mapped, including the Kharagpur-Jokpur subsection and KGP FSP 3000.1 2OSCM V1630 card. It also outlines the standard processes for creating work orders, allocating resources, executing maintenance work, and closing work orders in Oracle eAM. Finally, it lists several types of reports covered in the enterprise asset management system.

Uploaded by

priyasingh1682
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Railtel Details Railtel Mapping Details

RCIL Company
ER Eastern Region
KOL Territory
Division1 Division
KGP-PKU Section
Jokpur-Madpur Subsection
Kharagpur-Jokpur Subsection
KHARAGPUR POP
KGP FSP 3000.1 Equipment-DWDM
2OSCM V1630 Card
Oracle eAM Mapping Naming Convention in RCIL
Area Division1
Asset Group KHARAGPUR - PANSKURA
Parent Child Association-Asset Hirarchy
Asset Number
Inventory Organization Mapped as Maintenance Org RCIL-ER-KOL
Jokpur-Madpur,Kharagpur-Jokpur
KHARAGPUR->KGP FSP 3000.1->2OSCM V1630
RCIL Details
Fault Rectification
Scheduled/Planned
Third Party/AMC
Process Flow
Service Request
Create Work Order against Service Request
Work Order in Draft Stage
Update Work Order with Required To do List, Material Requirement,Resourse with estimation
Release the work order for actual work execution
Material issue required for Maintenance Activities
Assign employee for Actual work Execution
Actual Work Execution time required for Resource
Completion of Check list
Completion of Work Order
Close the Work Order
Processes Covered in EAM
Oracle Details
Breakdown/Routine/Emergency
Preventive
Outside Processing
Processes Covered in EAM
Sr.No Report Name
1 Patrolling report
2 Inspection of Equipment
3 Inspection of Battery Charger
4 Inspection of DG Set
5 Earthing Inspection
6 Inspection report for Maintenacne Team
7 Inspection Report Annx.9
8 Fault Rectification Report
9 MTTR Report

You might also like