Tejgaon
Report: 04
A. No. of runs 1nos. 0nos.
B. Running hours 659hrs 0hrs
C. Average Start up time 2.0hrs 0.0hrs
D. Start up time (a x c) 2.0hrs 0.0hrs
E. Production Hours 657hrs 0hrs
F. Natural Gas Hours 659hrs 0hrs
G. Breakdown/ Maintenance time 61 hrs - hrs
H. Idle time 0hrs 0hrs
I. Titas gas consumption 191,677m3 0m3
J. CO
2
Storage Tank (Opening Stock) 70,577Kg. 0Kg.
K. Total Production (Total Received) 308,479Kg. 0Kg.
L. Production in cyl. (CO, PCO, PMCO) 14,179Kg. 0Kg.
M. Dry Ice production (DRYICE) 8,900Kg. 0Kg.
N. Tanker Delivery of LCO (LCO) 313,925Kg. 0Kg.
O. Total Loss 25,916Kg. 0Kg.
P. Total Issue 362,920 0Kg.
Q. CO
2
Storage Tank (Closing Stock) 16,135Kg. 0Kg.
R. Production by Natural Gas 303,139Kg. 0Kg.
S. Production rate by NG 461Kg/ Hr. #DIV/ 0! Kg/ Hr.
T. Gas Yield 1.58Kg./ M3 #DIV/ 0! Kg./ M3
U. Power Consumption 136,377Kwh. 0Kwh.
V. Specific Power 0.450Kwh/ kg #DIV/ 0! Kwh/ kg
W. Dry Ice Recovery 5,340Kg
X. % Loss 7.14%
Y. Maintenance:
i.
For the month of April-14
Budget Actual Variance Budget Actual Variance
Carbon di-oxide, Kg 362,000 303,139 -16% 1,364,000 952,309 -30%
Copy to
Head of Supply, CO
Area Manager, Tejgaon
Finance Manager, CO 1-May-14
Product Volume
Wittemann Union
April-14
Cumulative
LCO2 Pump Maintenance
CO2 Gas Cooler Maintenance,Heat Exchanger,CO2 Compressor,Cooling Tower Pump Filter