Hydraulic Calculation of Pipe Culvert: WLD Wlo Wli Wlu

This document summarizes the hydraulic calculation of a pipe culvert. It provides dimensions and conditions for the upstream canal, culvert pipe, and downstream canal. It then calculates head losses through each section, including inlet and outlet transitions, pipe friction, and divergence/convergence. Total head loss is calculated to be 0.02652 meters. Key parameters like flow rate, water levels, and velocities are provided at each point of interest along the culvert.

Uploaded by

zulkifli1220
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Hydraulic Calculation of Pipe Culvert: WLD Wlo Wli Wlu

This document summarizes the hydraulic calculation of a pipe culvert. It provides dimensions and conditions for the upstream canal, culvert pipe, and downstream canal. It then calculates head losses through each section, including inlet and outlet transitions, pipe friction, and divergence/convergence. Total head loss is calculated to be 0.02652 meters. Key parameters like flow rate, water levels, and velocities are provided at each point of interest along the culvert.

Uploaded by

zulkifli1220
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Hydraulic Calculation of Pipe Culvert

Canal Name:
Structure No.

Chainage
Type
Pipe Single

WLu

WLi

WLo
H

Hu

Hc

Hd

BLi

BLo
BLd

BLu

Upstream
Canal

WLd

Inlet Transition
Li

Outlet Transition Downstream


Lo
Canal

Conduit
Lc

1 Demension and Hydraulic Conditions

2 Calculation of Head Loss


Pipe diameter D =
Nos. of Pipe N =

0.70 m
1 nos

Upstream Canal

Bottom Width
Side Slope 1:m
Water Depth
Water Surface Width
Flow Area
Velocity
Velocity Head
Energy Head
Inlet loss in the transition (hi)
dE = Eus - (Eds + hds)
Wetted Perimeter P = B + 2H(m^2+1)^0.5
Hydraulic Radius R = A/P
Roughness Coefficient
Roughness Coefficient K
Hydraulic Gradient I =[n V/R ^(2/3)]^2
Transition Length= 1.92098 (Wu-Wc)

note:

Energy Level (m)


Water Level (m)
Floor Level (m)

Design Discharge Q=
Pipe length Lc =

U/s Transition End

Bu =
m=
Hu =
Wu =
Au =
Vu =
hvu =
Eu =

0.50
1.0
0.5
1.5
0.5
0.48
0.011755
0.511755

Be =
m=
He =
We =
Ae =
Ve =
hve =
Ee=
ht =

Pu =
Ru =
n=
K=
Iu =

1.914214
0.261204
0.014286
70
0.000282

Pe =
Re =
n=
K=
Ie =

0.802777
say Li =
1.00 m
designed
1.00 m
Vc shall be in between "Vu" and 3.0 m/sec.

0.50
1.0
0.499293
1.498586
0.49894
0.48102
0.011805
0.511098
0.000292
ok 0.000365
1.912214
0.260923
0.014286
70
0.000283

0.24 m3/sec
5.00 m

Conduit
Qi=Q/N =
0.24
D=
q (rad)=
Hc =
Wc =
Ac =
Vc =
hvc =
Ec =
hi =
ok
Pc =
Rc =
n=
K=
Ic =

0.70
3.78399
0.460496
0.6642
0.268465
0.89397
0.040775
0.501271
0.01063
-0.00015
1.324396
0.202708
0.014286
70
0.00137

D/s Transition BP

Bb =
m=
Hb =
Wb =
Ab =
Vb =
hvb =
Eb=
ho =
Pb =
Rb =
n=
K=
Ib =

Lo = 2.41421 (Wc-Wd)/2
say Lo =

0.50
1.0
0.480496
1.460993
0.471125
0.509419
0.01324
0.493737
0.007545
ok
-1E-05
1.859049
0.253423
0.014286
70
0.00033

Downstream Canal

Bd =
m=
Hd=
Wd =
Ad=
Vd=
hvd=
Ed =

0.50
1.0
0.5
1.5
0.5
0.48
0.011755
0.511755

Pd =
dd =
n=
K=
Id =

1.914214
0.261204
0.014286
70
0.000282

1.008894
2.00 m
2.00 m

1) Inlet Transition
Friction htf=Li(Iu+Ic)/2 =
0.00028 m
Convergence htc = x in (hvc-hvu) = 1E-05 m
x in.=
0.2
2) Inlet (Sudden contraction)
Ac/Au
0.53807
fsc
0.2607
hi = fsc hvc
0.01063 m
3) Culvert conduit
Friction hf = LcIc =

0.00685 m

4) Outlet transition (Sudden enlargement)


fse = (1-Ac/Ad)^2
0.18504 m
ho = fse hvc
0.00754 m
5) Friction hof=Lo(Ic+Id)/2 =
0.00061 m
Divergence hod = x out(hvc-hvd) =0.00059 m
x out.=
0.4
6) Total Headloss
Transition Angle
U/stream
27o30'
D/stream
22o30'

0.02652 m

At B.P of Culvert
At B.P.of Conduit
At E.P.of Conduit
At E.P.of Culvert
ELu = WLu + hvu =
100.012 ELi = ELu -(ht+ hi) =
100.001 ELo = ELi - hf =
99.994 ELd =EL-(hof+ho) =
99.985
WLu = ELu - hvu =
100.000 WLi = ELi - hvc =
99.960 WLo = ELo - hvc =
99.953 WLd = ELd-hvd=
99.973
BLu = WLu - Hu=
99.500 BLi = WLi - Hc =
99.500 BLo = WLo - Hc =
99.493 BLd = WLd - Hd =
99.473