80% found this document useful (10 votes)
100K views

Template - Handover Documentation

This document provides a handover summary for an IT Administrator position. It includes details about infrastructure audits of the backbone, switches, network points, and routers. It also summarizes backend systems like servers, UPS systems, server racks, and technical support contacts. Workstation details around PCs, printers, operating systems, and technical support are outlined. Routines for IT work, data backups, printer maintenance, and morning checklists are described. Staffing information, areas of support, and contact details are provided. Finally, additional items around filings, keys, disposal of old items, tools, and stationary are inventoried along with pending jobs to be handled.

Uploaded by

letchlch
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
80% found this document useful (10 votes)
100K views

Template - Handover Documentation

This document provides a handover summary for an IT Administrator position. It includes details about infrastructure audits of the backbone, switches, network points, and routers. It also summarizes backend systems like servers, UPS systems, server racks, and technical support contacts. Workstation details around PCs, printers, operating systems, and technical support are outlined. Routines for IT work, data backups, printer maintenance, and morning checklists are described. Staffing information, areas of support, and contact details are provided. Finally, additional items around filings, keys, disposal of old items, tools, and stationary are inventoried along with pending jobs to be handled.

Uploaded by

letchlch
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Handover Documentation

Company : Name, Ipoh


Name : Full Name
Position : IT Administrator
Departure Date : 14 Nov 2009

Legend

#Handle by –Ling Chin Hing – IT Administrator


Join date: 09/2005
Rest Day –
Morning –
Full -
Noon –
H/P : .

a. Infrastructure Audits (Floor Plan, Schematic, Breakdown, Peripheral)

 Back Bone

o Location, Labeling and Cables.

 Switch Hub (x units)

o Location, Labeling, UPS and Maintenance

 Network Points (xx points)

o Location, Labeling and maintenance

 Cisco Router, ISDN Line, NTU unit, Streamyx Modem

o Location, Labeling, Cables, UPS, Faulty reporting procedure.

b. Back End System Audits (Hardware and Peripheral)

 Server

o Location, Server Key, Password, UPS, Shutdown & Restart procedures & Faulty reporting procedure.

 UPS Server

o Location, cables, Shutdown procedures & Faulty reporting procedure.

 Server Rack

o Location, Keys & maintenance

 Technical Support

o Vendor contact numbers & address on System, Maintenance Agreement, Repairs, and Warranty Claim.

o Preventive maintenance Procedures & Corrective maintenance Procedures.

o Remote Support Software (If Any). Location and audits (Password).

Page 1 of 4
o Error Log documentation, audits & procedures.

 Audit

o OS Licensing, Installation CDs, Guideline and Manual on all Modules.

c. Workstation

 Personal Computers

o Locations, Labeling, Hardware Audit, Networks point labeling, Quantity, Operating System & Application

Installed, software & application License quantity

 PC Printers & Barcode printers

o Locations, Labeling, Audit, Cables, Quantity, & maintenance history.

 Barcode labels

o Location, Audits & stock.

o Person-In-Charge.

 Audit

o OS Licensing, Installation CDs and Manual.

 Technical Support

o Local Vendor contact numbers & address on Repairs or Warranty claim.

o Preventive maintenance Procedures & Corrective maintenance Procedures.

o Remote Support Software (If Any). Location and audits (Password).

o Error Log documentation, audits & procedures.

e. Routines

i. IT

 BE System (Maintenance, Usage & Support)


o Training, Guideline and Manual on all Modules.

o ID Creation and New Modules adding/assignment for end-user.

o Price Change.

o Branch Management, Vendor instructions & Memo

o Filings. Memo, House-Keeping & troubleshooting methods, error reporting procedure to Vendor.

o Software & Hardware faulty report procedure

o Morning Job checklist, Preventive method procedure and Corrective method procedure

Page 2 of 4
o Upgrade & down grade procedure, error reporting procedure. Handling end user complaints and Criticism.

 Work Audit. Journal on the workload perform.

 Data Backup – Burn into CDR/CDRW//DVDRW on Daily/Weekly/Monthly basis.

 Barcode Printer Head Replacement and Mileage audit.

 Morning Checklist.

 Reports(COE~Chronology of Events)..

ii. Logistic and Sales


 Work Flow.

 Task list.

f. Staffing
o Immediate Superior.

o Manpower. Supervisor = x; Asst. Supervisor = x; Clerk = x

o Duties. Duty Roster, Leave Application, Shift Exchange, OT verification and confirmation, Attendance List,

IT MIS room tidiness (filings & cleanup), Staff disciplinary, turnover and employment, Appraisal, claims etc.

g. Support
o Names on all personnel that could assist in with IT support. E.g., General affair, HR Asst Exec, etc…

o Areas to support. BE system, Network. Back Office application software & IT operations.

o PABX System (If applicable).

o Local technician & vendor contact number.

o WAN faulty reporting procedure(Eg, Streamyx). Person in charge contact Number.

o All support or problem encountered.

Page 3 of 4
h. Others compilation

o Filings. All related forms.

o Keys. IT Room, Server Rack, Servers, Cabinet, Hub & Drawer.

o Disposal items. Old documents, Hardware – faulty and beyond repair (UPS, Mouse & Keyboard).

o Job Sheets. End user responses. E.g., End user ignoring job sheet policy except for Accounts & Treasury.

o Computer accessories. Tools Network faceplate & RJ45 Head.

o Stationary. Location, types and quantity. Label Roll, Tag Roll, Printer Cartridges and Ribbons (Barcode and

Epson). To coordinate with whom to ensure sufficient stationary.

o Tools. Grimping Tools, Skru driver, Pliers, Cabling wire and etc.

i. Pending Job- #Handle by

o Housekeeping. Workstation, POS Machine and TSRMS IDs.

o Users Training. Buyer, Accounts, Warehouse, Inventory and MIS staff.

o Back End Lodge. Module usage problem reports to ……..

o Front End Lodge. Module usage problem reports to ……...

o Server Lodge. Server problem reports to ……...

o Sales Variance Lodge.

o Policy enforcement memo and guideline.

o Hardware Disposal reports. E.g., POS, PC printer or peripheral.

o Job Sheet Summary. Job Sheet usage statistic.

o Audits. Hardware and Software Licensing Audit.

o Repair Followup.

Prepared By Reviewed By, Acknowledged By,

-------------------------- ---------------------------- --------------------------


Fullname Ling Chin Hing, Mr.

Date : Date : Date :

Page 4 of 4

You might also like