Project Tendering Schedule Schedule Stage Description: No. of Days

The document outlines a project tendering schedule that spans 66 calendar days from June 27 to August 19. It details 10 stages of the tendering process including advertisement, issuance of bidding documents, pre-bid conference, bid submission and evaluation, post-qualification, approval, contract preparation and issuance of notice to proceed. The stage requiring the most time is issuance and availability of bidding documents, estimated at 28 days or 42.42% of the total duration.

Uploaded by

Winard Wantog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views3 pages

Project Tendering Schedule Schedule Stage Description: No. of Days

The document outlines a project tendering schedule that spans 66 calendar days from June 27 to August 19. It details 10 stages of the tendering process including advertisement, issuance of bidding documents, pre-bid conference, bid submission and evaluation, post-qualification, approval, contract preparation and issuance of notice to proceed. The stage requiring the most time is issuance and availability of bidding documents, estimated at 28 days or 42.42% of the total duration.

Uploaded by

Winard Wantog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

NO.

OF % WEIGHT
DAYS ON DAYS
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1
Adverstisement/Posting of Invitation to Bid
- Newspaper
- Phil-GEPS
1.00 0.46
*Newspaper
*Phil-GEPS
7.00
2 Issuance and availability of Bidding Documents 28.00 42.42
3 Pre-bid Conference 1.00 0.46
Request for clarification 1.00 0.46
Supplemental/ Bid Bulletin 1.00 0.46
4
Submission and receipt of Bids (includes opening of bids and
eligibility check)
1.00 0.46
Submission of additional requirements 3.00 1.38
5 Bid Evaluation 5.00 2.29
6 Post-qualification 7.00 3.21
7 Approval of resolution/ Issuance of Notice of Award 4.00 1.83
8 Contract preparation and signing 5.00 2.29
9 Approval of contract by higher authority 5.00 2.29
10 Issuance of Notice to Proceed 2.00 0.92
TOTAL 218.00 100.00
DURATION: 66.00 CALENDAR DAYS
PROJECT TENDERING SCHEDULE
SCHEDULE
JUNE
STAGE DESCRIPTION
27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6