0% found this document useful (0 votes)
39 views4 pages

Prime HSA Parts: Visual N.G (No Good)

This document outlines the production process for HSA parts including visual inspection, measurement checks, cutting, lapping, molding, and a final report. It notes that after cutting at the engineering laboratory, all remaining prime samples were in good condition. It also provides production numbers showing that 3 models are made each month, with 25 parts per model, resulting in 75 HSA parts per month and a total of 900 parts produced monthly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views4 pages

Prime HSA Parts: Visual N.G (No Good)

This document outlines the production process for HSA parts including visual inspection, measurement checks, cutting, lapping, molding, and a final report. It notes that after cutting at the engineering laboratory, all remaining prime samples were in good condition. It also provides production numbers showing that 3 models are made each month, with 25 parts per model, resulting in 75 HSA parts per month and a total of 900 parts produced monthly.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

START:

Visual
Inspection
Prime .HSA Parts
Visual N.G
(no good)
DISPOSED
OK in Visual
inspection
OK
NH3 Base plate
measurement.
(Surface)
Picture of parts
END:
FIINAL REPORT
NEXIV
measurement.
(Dimension)

Cutting
process
Lapping
process
DISPOSED
OK
OK OK
Mixing of Molding of .HSA
Model of Aquarius .HSA A, B, C
Qty of model per month 3
Qty per Model 25
Qty of .HSA per month 75
Total Qty per Month 900
Model of Aquarius .HSA A, B, C
Qty of model per month 3
Qty per Model 25
Qty of .HSA per month 75
Total Qty per Month 900
OLD LAYOUT
AFTER RE-LAYOUT
After cutting process at engineering laboratory,
After cutting process at engineering laboratory,
all remaining prime samples are still in good condition ,