Checklist Concrete Works

This document is a checklist for inspections of concrete work for a construction project. It lists items to check during three inspections, including dimensions, reinforcement, embedded items, and concrete quality. The inspector indicates whether each item is acceptable or needs improvement/rectification. Details recorded include concrete mix grade, pour dates and times, number of test cubes taken, and scheduled dates for formwork and finishing work. The checklist is signed off once all rectifications are complete.

Uploaded by

khajaimad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views

Checklist Concrete Works

This document is a checklist for inspections of concrete work for a construction project. It lists items to check during three inspections, including dimensions, reinforcement, embedded items, and concrete quality. The inspector indicates whether each item is acceptable or needs improvement/rectification. Details recorded include concrete mix grade, pour dates and times, number of test cubes taken, and scheduled dates for formwork and finishing work. The checklist is signed off once all rectifications are complete.

Uploaded by

khajaimad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

GLOBAL ENTROPOLIS

VIZAG PVT LTD


Name of Work:
Employer:
Contract No.:
Contractor: S.S.PROJECTS, VIZAG
Item Dscrptn: Inspection Requested by:
1ST INSPECTION2ND INSPECTION
Req. on:
Location Section Level By.:
Date:
Time:
Points to Check O P
1. Dimensions, level & Plumb
2. Tightness & Rigidity
3. Stop / Drop Formwork
4. Cleanliness
5. Shutter Release Agent
1. Bar Size & Nos., spacing & Laps
2. Bar Spacing & Laps
3. Cleanliness
4. Covers, Hooks & Binding Rigidity
5. Starter & Bonding Bars
1. Anti Termite Treatment
2. Box Outs
3. Pipe Sleeves
4. Embedded Items
5. Quality of Bulk Materials / RMC
6. Plastisizers / Additives
7. Expansion Joint Provisions if any
8. Existing Concrete Hacking & Cleaning
9. Special treatments in existing surface
Agency Name
Main Contractor
Electrical
ACMV
Fire Protection
Plumbing
Others[Specify]]
Approved for Concreting
Details of Additional Steel Provided if any: [ Ot her t h an s p e c if ie d i n D r g. ]
Method of Pouring & Vibration Acceptable
Stability of Formwork after Pour Acceptable
Line, Level & finishing Acceptable
Sch. date for formwork removal with supports
Sch. date for form work removal entirely
Line, Level & finishing of Concrete surface
Removal of Battens, Maskin tape etc.
Action Required:- Remarks:
Dry finish
Wet finish
Grouting
Epoxy Treatment
Note : Record typical dimensional check on reverse of this format
Civil (SSP) Elec (GEVPL)
CHECKLIST
CONCRETE WORKS
Checklist No.
Pr. Start Date
Pr. End Date
Checklist
Date
BOQ No.
1ST INSPECTION2ND INSPECTION 3RD INSPECTION M i x Gr a d e:
Req. on: Req. on:
By.: By.:
Date: Date:
Time: Time:
Action Req.O P Action Req. O Action Req.
Task Start Date:
Pour Start Date & Time:
Concreting End Date & Time:
No. of Cubes Taken:
Average Slump:
To Improve A rr a n g em en t for Cur in g / P o n d in g
To Improve Ot h e r s [Specify]
To Improve
Actual Date of Removal
Actual Date of Removal
Acceptable To Rectify
Acceptable To Rectify
Mech (GEVPL) GEVPL( CIVIL )
Quantity
REMARKS
Sign with Date
Acceptable To Improve
Acceptable To Improve
Acceptable To Improve
Acceptable To Rectify
Acceptable To Rectify
Rectifications done as specified:
Task End Date: