This document is a checklist for inspections of concrete work for a construction project. It lists items to check during three inspections, including dimensions, reinforcement, embedded items, and concrete quality. The inspector indicates whether each item is acceptable or needs improvement/rectification. Details recorded include concrete mix grade, pour dates and times, number of test cubes taken, and scheduled dates for formwork and finishing work. The checklist is signed off once all rectifications are complete.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
67 views
Checklist Concrete Works
This document is a checklist for inspections of concrete work for a construction project. It lists items to check during three inspections, including dimensions, reinforcement, embedded items, and concrete quality. The inspector indicates whether each item is acceptable or needs improvement/rectification. Details recorded include concrete mix grade, pour dates and times, number of test cubes taken, and scheduled dates for formwork and finishing work. The checklist is signed off once all rectifications are complete.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6
GLOBAL ENTROPOLIS
VIZAG PVT LTD
Name of Work: Employer: Contract No.: Contractor: S.S.PROJECTS, VIZAG Item Dscrptn: Inspection Requested by: 1ST INSPECTION2ND INSPECTION Req. on: Location Section Level By.: Date: Time: Points to Check O P 1. Dimensions, level & Plumb 2. Tightness & Rigidity 3. Stop / Drop Formwork 4. Cleanliness 5. Shutter Release Agent 1. Bar Size & Nos., spacing & Laps 2. Bar Spacing & Laps 3. Cleanliness 4. Covers, Hooks & Binding Rigidity 5. Starter & Bonding Bars 1. Anti Termite Treatment 2. Box Outs 3. Pipe Sleeves 4. Embedded Items 5. Quality of Bulk Materials / RMC 6. Plastisizers / Additives 7. Expansion Joint Provisions if any 8. Existing Concrete Hacking & Cleaning 9. Special treatments in existing surface Agency Name Main Contractor Electrical ACMV Fire Protection Plumbing Others[Specify]] Approved for Concreting Details of Additional Steel Provided if any: [ Ot her t h an s p e c if ie d i n D r g. ] Method of Pouring & Vibration Acceptable Stability of Formwork after Pour Acceptable Line, Level & finishing Acceptable Sch. date for formwork removal with supports Sch. date for form work removal entirely Line, Level & finishing of Concrete surface Removal of Battens, Maskin tape etc. Action Required:- Remarks: Dry finish Wet finish Grouting Epoxy Treatment Note : Record typical dimensional check on reverse of this format Civil (SSP) Elec (GEVPL) CHECKLIST CONCRETE WORKS Checklist No. Pr. Start Date Pr. End Date Checklist Date BOQ No. 1ST INSPECTION2ND INSPECTION 3RD INSPECTION M i x Gr a d e: Req. on: Req. on: By.: By.: Date: Date: Time: Time: Action Req.O P Action Req. O Action Req. Task Start Date: Pour Start Date & Time: Concreting End Date & Time: No. of Cubes Taken: Average Slump: To Improve A rr a n g em en t for Cur in g / P o n d in g To Improve Ot h e r s [Specify] To Improve Actual Date of Removal Actual Date of Removal Acceptable To Rectify Acceptable To Rectify Mech (GEVPL) GEVPL( CIVIL ) Quantity REMARKS Sign with Date Acceptable To Improve Acceptable To Improve Acceptable To Improve Acceptable To Rectify Acceptable To Rectify Rectifications done as specified: Task End Date: