The document is a letter from an assistant engineer submitting two civil drawings for review and approval related to a power substation extension project. The letter provides details of the two drawings being submitted - the foundation drawing of a 132kV Capacitor Voltage Transformer (CVT) supported on a steel structure and the foundation drawing of a 132-11kV auxiliary transformer. The assistant engineer requests review and approval of the submitted drawings.
The document is a letter from an assistant engineer submitting two civil drawings for review and approval related to a power substation extension project. The letter provides details of the two drawings being submitted - the foundation drawing of a 132kV Capacitor Voltage Transformer (CVT) supported on a steel structure and the foundation drawing of a 132-11kV auxiliary transformer. The assistant engineer requests review and approval of the submitted drawings.