0% found this document useful (0 votes)
41 views4 pages

Operation Core Cycle Time (Sec) : Summarry-Eicher 6 Bore Block

This document contains production data for two different manufacturing processes: 1) Eicher 6 Bore Block production including core making, washing, assembly, and output of 13.2 units per shift for 100 assemblies. 2) Farmcent-Escort FLAT Body production including core making, washing, assembly, and output of 6.8 units per shift for 100 assemblies. It provides cycle times and production efficiency data for each operation in order to calculate worker output per shift for the two processes.

Uploaded by

shashi_spm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views4 pages

Operation Core Cycle Time (Sec) : Summarry-Eicher 6 Bore Block

This document contains production data for two different manufacturing processes: 1) Eicher 6 Bore Block production including core making, washing, assembly, and output of 13.2 units per shift for 100 assemblies. 2) Farmcent-Escort FLAT Body production including core making, washing, assembly, and output of 6.8 units per shift for 100 assemblies. It provides cycle times and production efficiency data for each operation in order to calculate worker output per shift for the two processes.

Uploaded by

shashi_spm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Barrel 1,2,3

149
Barrel 4,5,6
149
FW, Slab and FE Core
158
Tappet
346.4
Water Jacket
444
Water Header
237
Barrel 1,2,3
60
Barrel 4,5,6
60
FW, Slab and FE Core
60
Tappet
251
Water Jacket
182
Water Header
105
Barrel 1,2,3
31
Barrel 4,5,6
31
FW, Slab and FE Core
32
Tappet
11
Water Jacket
18
Water Header
11
Total
Saving = 4.84
Upper and lower axle core making 172
Upper and Lower body core making 180
Axle core 20
Waiting for Oven Rack 40
Summarry-Eicher 6 Bore Block
Operation Core
cycle
time
(sec)
Core Making
Core Washing
Core Making
CoreTrimming
Core Washing
Summary (Farmcent-Escort FLAT Body )
Operation Core
cycle
time
(sec)
Body core 22
Waiting for Oven Rack 40
Body core assembly 103
Axle core assembly on fixture 194
Total
Saving = 2.41
Core Washing
Core Assembly
P.E.D (7 Hrs) PPC/Shift P.E.D PPC
1 169 160 0.66 1.43
1 169 160 0.66 1.43
2 159 160 1.39 1.4
1 73 60 1.53 1.95
1 57 50 1.96 2.34
1 106 75 1.04 1.56
4 420 360 1.06
4 420 360 1.06
4 420 120 1.06
2 100 120 2.21
4 138 120 3.21
2 240 120 0.93
3 813 70 0.41
3 813 70 0.41
3 788 180 0.42
3 2291 60 0.15
3 1400 60 0.24
2 2291 80 0.10
44 18.47 23.31
P.E.D (7 Hrs) PPC/Shift P.E.D PPC
2 147 140 1.43 1.57
2 140 140 1.50 1.58
4 420 320 1.00 2.6
Summarry-Eicher 6 Bore Block
Man
output/shift
For 100nos assemblies(
MP)
For 100nos assemblies(
MP)
13.2
Summary (Farmcent-Escort FLAT Body )
Man
output/shift
3 406 320 0.78 2.6
3 245 180 1.29 0.43
1 130 50 0.81 0.43