0% found this document useful (0 votes)
68 views

Bored Pile Record: Project

The document contains records from a bored pile construction project including: 1) Reinforcement cage inspection checklists detailing measurements and checks of the rebar cages. 2) Bored pile concreting records tracking concrete volumes, temperatures, and test samples for each pile poured. 3) Bentonite test records showing measured density, viscosity, pH, and sand content for bentonite used in the piles and comparing to allowable limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views

Bored Pile Record: Project

The document contains records from a bored pile construction project including: 1) Reinforcement cage inspection checklists detailing measurements and checks of the rebar cages. 2) Bored pile concreting records tracking concrete volumes, temperatures, and test samples for each pile poured. 3) Bentonite test records showing measured density, viscosity, pH, and sand content for bentonite used in the piles and comparing to allowable limits.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

PROJECT : Date :

a) PILE REF. NO. : h) WORKING LOAD (T) :


b) TOP OF CASING LEVEL (m) : I) DEPTH FROM EGL (m) : POLYMER TEST
c) EXISTING GRD LEVEL (m) : j) CON'C LENGTH (m) : Initial Before concreting
d) CUT-OFF LEVEL (m) : k) PAY LENGTH (m) : DENSITY : /
e) BLIND BORING (m) : l) CASING LENGTH (m) : VISCOSITY : /
f) PILE TOE LEVEL (m) : m) BORING RIG ID : pH VALUE : /
g) PILE DIAMETER (mm) :
COMMENCEMEN : COMPLETION :
TIME DEPTH Reinforcement Cages : (m) T.O.C.
Length : F.C.L.
C.O.L.
BORED PILE RECORD
BORING RECORD
REMARKS
GENERAL INFORMATION
Rebar :
DESCRIPTION
TOE LEVEL
Pile Base Level
Time : Time :
SUBCONTRACTOR HMAIN CONTRACTOR QPS / PE (TERS)
REPRESENTATIVE REPRESENTATIVE REPRESENTATIVE
Verticality
Overcast :
% Overbreak :
Theoretical Volume :
Actual Volume :
Links :
Method: Tremie / Dry
Grade:
Min. Lap :
NAME : NAME : NAME :
PROJECT : Date :
a) PILE REF. NO. : e) TIME COMPLETE :
b) DIAMETER (mm) : f) CONCRETE SUPPLIER :
c) DATE CAST : g) CONCRETE GRADE :
d) TIME CAST :
START FINISH CUT
TOTAL
LENGTH
1
2
3
4
5
6
7
8
9
BORED PILE CONCRETING RECORD
ACCUM.
VOLUME
(m3)
TEMPER-
ATURE
()
REMARKS
TREMIE PIPE ________
LENGTH (m)
ACTUAL
DEPTH OF
CONCRETE
(m)
THEORETICAL
DEPTH OF
CONCRETE
(m)
TRUCK
No.
SLUMP
(mm)
TEST
CUBE
TAKEN
(nos)
VOLUME
(m3)
CASTING TIME
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
REMARKS :
SUBCONTRACTOR MAIN CONTRACTOR SQPS / PE (TERS)
REPRESENTATIVE REPRESENTATIVE REPRESENTATIVE
NAME : NAME : NAME :
P
R
O
J
E
C
T

:

C
9
0
7
P
i
l
e

R
e
f
e
r
e
n
c
e

N
o
:
D
a
t
e
:
S
/
n
o
P
r
o
c
e
s
s

D
e
s
c
r
i
p
t
i
o
n
R
e
m
a
r
k
1
C
a
g
e
s

I
d
e
n
t
i
f
i
c
a
t
i
o
n
C
a
g
e

1

(
T
o
p
)
C
a
g
e

2

C
a
g
e

3
C
a
g
e

4
C
a
g
e

5
C
a
g
e

6

(
B
o
t
t
o
m
)
2
C
a
g
e

L
e
n
g
t
h

&

S
i
z
e
3
N
o
s

a
n
d

S
i
z
e

o
f

R
e
b
a
r
s
4
L
a
p

L
e
n
g
t
h

S
u
f
f
i
c
i
e
n
t
5
E
q
u
a
l

S
p
a
c
i
n
g

o
f

M
a
i
n

B
a
r
s

6
E
q
u
a
l

S
p
a
c
i
n
g

o
f

S
h
e
a
r

L
i
n
k
s

7
N
o
s
.

o
f

U
-
B
o
l
t
s
8
P
r
o
p
e
r

T
i
g
h
t
e
n
i
n
g

o
f

U
-
B
o
l
t
s

9
P
r
o
p
e
r

f
i
x
i
n
g

o
f

w
i
r
e

t
o

r
e
b
a
r
s
1
0
C
a
g
e
C
l
e
a
n
l
i
n
e
s
s
I
n
s
p
e
c
t
i
o
n

C
h
e
c
k
l
i
s
t

f
o
r

R
e
i
n
f
o
r
c
e
m
e
n
t

C
a
g
e
1
0
C
a
g
e
C
l
e
a
n
l
i
n
e
s
s
1
1

1
5
0
m
m

I
n
c
l
i
n
o
m
e
t
e
r

R
e
s
e
r
v
a
t
i
o
n

T
u
b
e
s
1
2

5
0
m
m

S
o
n
i
c

L
o
g
g
i
n
g

P
i
p
e
s
1
3
P
l
u
n
g
e
-
I
n

C
o
l
u
m
n

T
y
p
e
1
4
O
t
h
e
r
s
P
l
e
a
s
e

i
n
d
i
c
a
t
e
:

E
n
o
u
g
h

/

O
.
K
.

=

N
o
t

E
n
o
u
g
h

=

X

(
T
o

a
d
d

/

a
d
j
u
s
t
)
N
o
t

A
p
p
l
i
c
a
b
l
e

=

N
i
l
C
h
e
c
k
e
d

B
y
:
C
h
e
c
k
e
d

B
y
:
C
h
e
c
k
e
d

B
y
:
S
u
b
-
C
o
n
R
e
p
r
e
s
e
n
t
a
t
i
v
e
M
a
i
n
-
C
o
n
R
e
p
r
e
s
e
n
t
a
t
i
v
e
Q
P
S
/
P
E
(
T
E
R
S
)
R
e
p
r
e
s
e
n
t
a
t
i
v
e


CONCRETING CHART
Project:
Tremie Pipe
Panel No: Date: T1 T2 T3
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Concrete volume (cubic metres)
Comments
Signed as a correct record
Tuksu E&C Signature Date
Signature Date
Signature Date
Samsung E&C
OPS Represntative
D
e
p
t
h

(
m
e
t
e
r
s
)
0 10 20 30 40 50 60 110 120 130 140 70 80 90 100 190 200 210 260 150 270 220 230 240 250 280 160 170 180
BENTONITE TEST RECORD
DATE:
PILE No:
Section: Sheet Number
TYPE OF TEST UNITS
FRESH RE-USED FRESH RE-USED
Density g/cm
3
1.02 1.02 - 1.10
Marsh Viscocity seconds 30 - 36 30 -90
pH - 8 - 10 9.5 - 12
Sand Content % 0.5 3
NOTE: Figures shown (.) are to be used unless otherwise specified
Comments:
Prepared by Tuksu Engineering & Construction's Site Representative
Name: _____________________ Signed _________________ Date ________________
Checked and Verified by Client's Representative (Samsung E&C)
Name: _____________________ Signed _________________ Date ________________
Checked and Verified by QPS
Name: _____________________ Signed _________________ Date ________________
ALLOWABLE LIMITS ACTUAL RESULTS
PROJECT: CONTRACT 156 - NORTH SOUTH LINE
EXTENSION
BENTONITE IN BORED PILE PRIOR TO PLACING CONCRETE