This document contains several checklists for inspecting and testing instrumentation and control systems as part of a glycol reboiler installation project. The checklists include items for verifying instrument installation and calibration, loop checks, controller tuning, discrete I/O validation for a PLC, and signed off inspection results.

Uploaded by

Edha Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
393 views9 pages

6 - APPENDIX 19 - 24 Instrument Installation Procedure Checklist

This document contains several checklists for inspecting and testing instrumentation and control systems as part of a glycol reboiler installation project. The checklists include items for verifying instrument installation and calibration, loop checks, controller tuning, discrete I/O validation for a PLC, and signed off inspection results.

Uploaded by

Edha Ali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

No.

Pass
(P/F)
1.
2.
3.
4.
5.
6.
7.
8.
9.
State PLCInput
Pass
(P/F)
LocalHMI
Page1of1
INSRTUMENTATIONSWITCHCHECKLIST
Blockanddrainvalves
Pneumatic/hydraulictubingleaktested
Alarm
StateChecklist
DCS
Wiringcorrect
Drawingsmarkedupasbuilt
HMIGraphicsymbolandtagcorrect
StateDescription
Project
Facility:
Area:
ProjectName:
Contract/PONO:P12A/CO/GO35
Instrument
InspectionChecklist
Description:
Model: SerialNumber:
Tag:
Manufacturer:
Heattracing/insulation/instrumenthousing
Comments ItemtobeInspected
InstrumenttypeandclassperP&IDandspecification
Instrumenttag(s)installedandcorrect
Installationofsensorcompleteandcorrect

Comments:
Company

On Off
On Off
Date(yyyy/mm/dd)
PetronasCarigali
Sdn.Bhd
Witnessedby
Testedby
TurcompEngineering
ServicesSdn.Bhd
TimeDelay

Name Signature
N/A
0
1
Actual
TimeDelay
Pass
(P/F) (incl.units)
ActualTripPoint Setpoint
Calibration
01
10
SetpointTripPoint
Transition
(incl.units)
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
13of21
420mAModbusOther.
010V EthemetIP
No.
Pass
(P/F)
1.
2.
3.
4. Blockanddrainvalves
P ti / h d li t bi l k t t d
Area: Contract/PONO:P12A/CO/GO35
Instrument
Tag: Description:
Installationofsensorcompleteandcorrect
Range:
Output
INSRTUMENTATIONSWITCHCHECKLIST
Page1of2
Project
Facility: ProjectName:
InstrumenttypeandclassperP&IDandspecification
Instrumenttag(s)installedandcorrect
Manufacturer: Model: SerialNumber:
InspectionChecklist
ItemtobeInspected Comments
Instrument
Tag: Description:
Manufacturer: Model: SerialNumber:
Units:
Design
5.
6.
7.
8.
9.
10.
Drawingsmarkedupasbuilt
HMIGraphicsymbolandtagcorrect
Pneumatic/hydraulictubingleaktested
Heattracing/insulation/instrumenthousing
Wiringcorrect
Impulselinespressuretested
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
14of21
Pass
(P/F)
Notes:
1. Attachfactorycalbrationformsforallinstrumentswhereprovidedand/orspecified.
2. Provideinstrumentparametersforeachparameterchangedfromthefactorydefault.
Comments:
TransmitterDisplay
TransmitterOutput
ProcessDisplay
PLC
HMI
TransmitterDisplay
TransmitterOutput
ProcessDisplay
PLC
HMI
TransmitterDisplay
TransmitterOutput
ProcessDisplay
PLC
HMI
Page2of2
SignalValidation
Input
Signal
Location DesignValue ActualValue Error(%)
INSRTUMENTATIONTRANSMITTERLOOPCHECKLIST
Company
Witnessedby
PetronasCarigali
Sdn.Bhd
Name Signature Date(yyyy/mm/dd)
Testedby
TurcompEngineering
ServicesSdn.Bhd
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
15of21
No.
Pass
(P/F)
1.
2.
3.
4.
5.
6.
Pass
(P/F)
ActuatortypeandclassperP&IDandspecification
Instrumenttag(s)installedandcorrect
Installationofactuatorcompleteandcorrect
wiringcorrect
Instrument
Tag: Description:
Manufacturer: Model: SerialNumber:
InspectionChecklist
ItemtobeInspected Comments
Area: Contract/PONO:P12A/CO/GO35
MODULATINGCONTROLDEVICECHECKLIST Page1of1
Project
Facility: ProjectName:
0%
50%
PLCOutput
FieldDevice
PLCOutput
Drawingsmarkedupasbuilt
HMIgraphicsymbol,tagandunitscorrect
ControlValidation
Location DesignValue ActualValue Error(%) ControlOutput
Notes:
1. Attachfactorycalbrationformsforallinstrumentswhereprovidedand/orspecified.
2. Provideinstrumentparametersforeachparameterchangedfromthefactorydefault.
Comments:
Company
Witnessedby
PetronasCarigali
Sdn.Bhd
Name Signature Date(yyyy/mm/dd)
Testedby
TurcompEngineering
ServicesSdn.Bhd
50%
100%
FieldDevice
PLCOutput
FieldDevice
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
16of21
No.
Pass
(P/F)
1.
2.
3.
4.
5.
6.
7.
8.
Notes:
1. Attachprintoutsoftrendsofvaroustests,withfinalPIDtuningvalues.
Project
Facility: ProjectName:
Area: Contract/PONO:P12A/CO/GO35
ControllerLoop
Tag: Description:
TestChecklist
PIDCONTROLLERCHECKLIST Page1of1
ItemtobeInspected
StartupTest
Inputsignalpositivebumptest
Inputsignalnegativebumptest
Bumplessautomanualcontroltransition
Manualoutputcapability
Bumplessmanualautocontroltransition
Comments
HMIgraphicsymbols,tagandunitscorrect
HMIequipmentfaceplatecorrect
FinalPIDTuningValues
P: I: D:
Comments:
Company Name Signature Date(yyyy/mm/dd)
Testedby
TurcompEngineering
ServicesSdn.Bhd
Witnessedby
PetronasCarigali
Sdn.Bhd
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
17of21
Pt State StateDesc.
PLC
Input
DCS
Pass
(P/F)
0
1
0
1
0
1
0
1
0
1
0

OnOff
N/A
OnOff

PLCDISCRETEINPUTCHECKLIST Page1of2
Project
Alarm Tag Description
Facility: ProjectName:
Area: Contract/PONO:P12A/CO/GO35
PLC
PLCID:
Rack:
Description:
Slot:
Local
HMI
OnOff
N/A
OnOff
On Off
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff

0

1

0

1

0

1

0

1

0

1

0

1

0

1

On Off
N/A
OnOff
OnOff
N/A
OnOff

OnOff
OnOff
OnOff
N/A
OnOff
OnOff
OnOff
N/A
OnOff
OnOff
N/A
N/A
OnOff

OnOff
N/A

PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
18of21
0

1

0

1

0

1

0

1

Comments:
PLCDISCRETEINPUTCHECKLIST Page2of2
OnOff
OnOff
OnOff
OnOff
N/A
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
Company
Witnessedby
PetronasCarigali
Sdn.Bhd
Name Signature Date(yyyy/mm/dd)
Testedby
TurcompEngineering
ServicesSdn.Bhd
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
19of21
Pt State StateDesc.
PLC
Input
DCS
Pass
(P/F)
0
1
0
1
0
1
0
1
0
1
0

Tag Description
Local
HMI
Alarm
OnOff
N/A
Facility: ProjectName:
Area: Contract/PONO:P12A/CO/GO35
PLC
PLCID: Description:
Rack: Slot:
PLCDISCRETEOUTPUTCHECKLIST Page1of2
Project
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
OnOff
N/A
OnOff
On Off
0

1

0

1

0

1

0

1

0

1

0

1

0

1

OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
On Off
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure

Rev0
20of21
0

1

0

1

0

1

0

1

Comments:
PLCDISCRETEOUTPUTCHECKLIST Page2of2
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
OnOff
N/A
OnOff
Company
Witnessedby
PetronasCarigali
Sdn.Bhd
Name Signature Date(yyyy/mm/dd)
Testedby
TurcompEngineering
ServicesSdn.Bhd
PONo:P12A/CO/G035
GlycolReboilerInstrumentInstallationWorkProcedure Rev0