Briman Strategic Reservoirs - Baseline Programme 11 Tanks Weekly Progress S-Curve (Res-3)

The document shows weekly progress data for the construction of Tank 3 over several months. It includes the planned and actual weekly progress percentages and cumulative progress curves. The commentary indicates that construction of Tank 3 was completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Briman Strategic Reservoirs - Baseline Programme 11 Tanks Weekly Progress S-Curve (Res-3)

The document shows weekly progress data for the construction of Tank 3 over several months. It includes the planned and actual weekly progress percentages and cumulative progress curves. The commentary indicates that construction of Tank 3 was completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

6-Feb-14

94.58 1.65 1.54 13-Feb-14

96.54 0.00 1.95 20-Feb-14

97.39 0.13 0.86 27-Feb-14

6-Mar-14

93.05 2.43 1.54

98.56 0.53 1.17

98.88 0.85 0.31 13-Mar-14

99.19 0.40 0.31 20-Mar-14

93.94

95.59

95.59

95.72

96.25

97.10

97.50

17-Apr-14

10-Apr-14

3-Apr-14

27-Mar-14

20-Mar-14

13-Mar-14

6-Mar-14

27-Feb-14

20-Feb-14

13-Feb-14

6-Feb-14

70

3
60

Commentary :
1. Tank 3 completed.

Cummulative Progress

100.00 100.00 1.50 0.00 17-Apr-14

98.50 100.00 0.45 0.00 10-Apr-14

Cumm. Planned

3-Apr-14

Weekly Actual

98.05 100.00 0.30 0.00

Weekly Plan

97.75 100.00 0.25 0.81 27-Mar-14

91.51 3.81 3.81 30-Jan-14

Actual - Cumm.
91.51

Cumm. Planned
87.70 2.35 2.35 23-Jan-14

Weekly Actual

87.71

Weekly Plan
30-Jan-14

23-Jan-14

Weekly Progress

BRIMAN STRATEGIC RESERVOIRS - BASELINE PROGRAMME 11 TANKS


WEEKLY PROGRESS S-CURVE (Res-3)

100

90

80

50

40

30

20

10

Actual - Cumm.