Briman Strategic Reservoirs - Baseline Programme 11 Tanks Weekly Progress S-Curve (Res-4)

This document contains weekly progress data for 11 tanks over a period of several months. It includes planned and actual cumulative and weekly progress percentages. Tank 4 was completed on April 17th, as the weekly actual progress reached 100% that week. The cumulative progress curve graph shows that Tank 4, represented by the blue line, closely tracked the planned progress curve.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Briman Strategic Reservoirs - Baseline Programme 11 Tanks Weekly Progress S-Curve (Res-4)

This document contains weekly progress data for 11 tanks over a period of several months. It includes planned and actual cumulative and weekly progress percentages. Tank 4 was completed on April 17th, as the weekly actual progress reached 100% that week. The cumulative progress curve graph shows that Tank 4, represented by the blue line, closely tracked the planned progress curve.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

95.10 0.26 1.

12 20-Feb-14

96.53 0.73 1.43 27-Feb-14

6-Mar-14

97.23 0.39 0.70

97.94 0.65 0.70 13-Mar-14

98.67 0.30 0.73 20-Mar-14

99.08 0.10 0.42 27-Mar-14

95.88

96.61

97.00

97.65

97.95

98.05

17-Apr-14

10-Apr-14

3-Apr-14

27-Mar-14

20-Mar-14

13-Mar-14

6-Mar-14

27-Feb-14

20-Feb-14

13-Feb-14

6-Feb-14

30-Jan-14

Commentary :
1. Tank 4 completed.

3
60

50

Cummulative Progress

100.00 100.00 0.20 0.00 17-Apr-14

Cumm. Planned

99.80 100.00 0.80 0.00 10-Apr-14

Weekly Actual

3-Apr-14

93.98 1.26 1.12 13-Feb-14

95.62

Weekly Plan

99.00 100.00 0.95 0.92

6-Feb-14

92.86 2.62 1.12

94.36

Actual - Cumm.
91.75 4.10 4.10 30-Jan-14

Cumm. Planned

91.75

Weekly Actual

87.65 1.73 1.73 23-Jan-14

Weekly Plan

87.65

23-Jan-14

Weekly Progress

BRIMAN STRATEGIC RESERVOIRS - BASELINE PROGRAMME 11 TANKS


WEEKLY PROGRESS S-CURVE (Res-4)
100

90

80

70

40

30

20

10

Actual - Cumm.