Lift Well Pressurization Calculation For Exquisite

This document contains calculations for determining the required fan capacity and power consumption for pressurizing lift wells in two residential towers - Tower C and Towers 1 to 9. For Tower C, which has 17 floors above ground, the total leakage area was calculated as 1.17 sqm and the required fan capacity for two lift wells was determined to be 30,000 CFM, requiring a 15HP motor. For Towers 1 to 9, which have 16 floors above ground, the required fan capacity for two lift wells was found to be 21,000 CFM, requiring a 12.5HP motor. The calculations follow standard formulas using parameters like leakage area per door and pressure difference to determine volumetric flow rate and necessary fan specifications

Uploaded by

SalimMohammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
67% found this document useful (9 votes)
14K views

Lift Well Pressurization Calculation For Exquisite

This document contains calculations for determining the required fan capacity and power consumption for pressurizing lift wells in two residential towers - Tower C and Towers 1 to 9. For Tower C, which has 17 floors above ground, the total leakage area was calculated as 1.17 sqm and the required fan capacity for two lift wells was determined to be 30,000 CFM, requiring a 15HP motor. For Towers 1 to 9, which have 16 floors above ground, the required fan capacity for two lift wells was found to be 21,000 CFM, requiring a 12.5HP motor. The calculations follow standard formulas using parameters like leakage area per door and pressure difference to determine volumetric flow rate and necessary fan specifications

Uploaded by

SalimMohammad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Q = 0.

839 x A x (P)
1/2
Q = Volumetric Flow Rate in M
3
/Sec.
A = Flow Area in Sq. Mtr.
P =
Pressure Difference Maintained Across the Lift Door in Pascal
( 50 Pascal to be maintained as per NBC-2005)
0.83 = Coefficient
Leakage Area Per Lift Door = 0.065 Sq. Mtr. (As per ASHRAE Handbook of Application)
No. of Floors = Level- Ground Floor to 17th Floor = 17
Total Leakage Area = 0.065x18
= 1.17 Sq.Mtr.
Total Leakage Air Flow (Q) = 0.839 x 1.17 x (50)
1/2
= 6.95 M
3
/Sec.
= 14609 CFM
Say = 15000 CFM / Lift Well
2NOS. Selected Fan Capacity for two Lift Well = 30000 CFM
Fan Static Pressure = 40 MMWG
Calculated Power Consumption (BHP) = 10.53
Calculated Power Consumption (IHP) = 12.11
Selected Motor = 15 HP
Selected Fan Capacity for one Lift Well = 15000 CFM
Fan Static Pressure = 40 MMWG
Calculated Power Consumption (BHP) = 10.53
Calculated Power Consumption (IHP) = 12.11
Selected Motor = 15 HP
LIFT WELL PRESSURIZATION CALCULATION FOR ,48 ACRE NORTH TOWN CHENNAI EKANTA TOWER
TOWER C - (G+17)
Q = 0.839 x A x (P)
1/2
Q = Volumetric Flow Rate in M
3
/Sec.
A = Flow Area in Sq. Mtr.
P =
Pressure Difference Maintained Across the Lift Door in Pascal (
50 Pascal to be maintained as per NBC-2005)
0.83 = Coefficient
Leakage Area Per Lift Door = 0.051 Sq. Mtr. (As per ASHRAE Handbook of Application)
No. of Floors = Level- Ground Floor to 15th Floor = 16
Total Leakage Area = 0.051x16
= 0.816 Sq.Mtr.
Total Leakage Air Fow (Q) = 0.839 x 0.816 x (50)
1/2
= 4.84 M3/Sec.
= 10248 CFM
Say = 10500 CFM / Lift Well
Selected Fan Capacity for Two Lift Well = 21000 CFM
Fan Static Pressure = 40 MMWG
Calculated Power Consumption (BHP) = 11.05
Selected Motor = 12.5 HP
LIFT WELL PRESSURIZATION CALCULATION FOR ONE LIT WELL
TOWER-1 to 9 IN ANANDA- (G+15)