0% found this document useful (0 votes)
16 views

3-Proposal 2009

The document is a proposal form for final year projects at the Department of Computer Engineering at Sir Syed University of Engineering & Technology in Karachi, Pakistan. It requests information on the project title, category, group members, project description, objectives and timelines, methodology, and list of purchased and designed components. The form needs approval from the internal advisor and group leader before the project can commence.

Uploaded by

api-19967335
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

3-Proposal 2009

The document is a proposal form for final year projects at the Department of Computer Engineering at Sir Syed University of Engineering & Technology in Karachi, Pakistan. It requests information on the project title, category, group members, project description, objectives and timelines, methodology, and list of purchased and designed components. The form needs approval from the internal advisor and group leader before the project can commence.

Uploaded by

api-19967335
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Department of Computer Engineering

Sir Syed University of Engineering &


Technology, Karachi-Pakistan

Proposal Form for Final Year Projects (FYP) - 2009


Project Title: _____________________________________________________________________
Category: ______________________________Internal Supervisor: ________________________
Group Members: _________________________________________ Date: __________________

1. Project Description: _______________________________________________________________


___________________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________________________
2. Objectives/Functionalities of the Project:
Completion Status
S. No Project Objectives
Dates Percentage
1.
2.
3.
4.
N.

3. Methodology:
Software Hardware
Programming Languages
Operating Systems
Databases
Others

4. List of Purchased and Designed Components:


Purchased Components Designed Components

Incharge FYPC: □ Approved □ Not Approved

______________________________________________ ___________________________________________
Name & Dated Signature of Internal Advisor Name & Dated Signature of Group Leader

You might also like