Pressure Equipment Inspection Requirements: Train3 - Unit 92 03-E9202 Condensate Cooler

This document provides inspection requirements for the condensate cooler vessel unit tag 03-E9202. The inspection will require removal of insulation at selected locations on the shell, mechanical cleaning of tubes if directed, and UT inspection after insulation removal. Support services needed include providing a 230V AC power source, water hose, and removal of insulation as directed. The inspection will include visual, UT, and IRIS inspections and pressure testing of tubes if needed. The manpower will include one LNG inspector and two NDE technicians working 12-hour shifts.

Uploaded by

Siva Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Pressure Equipment Inspection Requirements: Train3 - Unit 92 03-E9202 Condensate Cooler

This document provides inspection requirements for the condensate cooler vessel unit tag 03-E9202. The inspection will require removal of insulation at selected locations on the shell, mechanical cleaning of tubes if directed, and UT inspection after insulation removal. Support services needed include providing a 230V AC power source, water hose, and removal of insulation as directed. The inspection will include visual, UT, and IRIS inspections and pressure testing of tubes if needed. The manpower will include one LNG inspector and two NDE technicians working 12-hour shifts.

Uploaded by

Siva Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRESSURE EQUIPMENT

INSPECTION REQUIREMENTS
IDENTIFICATION
Unit:
Train3 Unit 92
Tag No:
03-E9202
Equipment Name:
CONDENSATE COOLER
VESSEL/CONFINED SPACE ENTRY REQUIRED: YES NO
CLEANING & PURGING REQUIREMENTS
Water Wash Caustic Wash Fuel Gas Purge Air Purge
Steaming N2 Purge Other: As Per Operations Requirements
OPENING FOR INSPECTION
an!a"s #es No
$nternal an!a" #es No
Channel Co%er #es No Remoe t!e "onnet
&un'le remo%al #es No Pu## out t!e tu"e "un$#e
Other Opening #es No
Comments: %nsu#ation remoa# on t!e s!e## is require$ at se#e&te$ #o&ations'
SUPPORT SERVICES REQUIRED FOR INSPECTION
(emister )emo%al #es No
Schoepenteoter remo%al #es No
)aschig )ings )emo%al #es No
Sca**ol'ing )equire' #es No
echanical Cleaning #es No C#ean tu"es "( !($ro )et*air-"#o+in, as $ire&te$ "(
inspe&tion'
+ighting )equire' #es No -esse# sa.e /an$ Lamps0 at tu"es!eet
Comments: 1' Proi$e 230- AC sour&e +it! 2 out#ets an$ e2tension "oar$ near tu"es!eet'
2' Proi$e +ater !ose at t!e &!anne# !ea$ +it! 13 &oup#in, as $ire&te$ "( %nspe&tion'
3' Remoe s!e## insu#ation as $ire&te$ "( %nspe&tor'
INSPECTION
,isual $nspection #es No On s!e##0 tu"e "un$#e0 "onnet an$ no44#es'
Ultrasonic $nspection #es No S!e## UT a.ter insu#ation remoa#'
("e Penetrant #es No
agnetic Particle #es No
F+ Test #es No %R%S test on 1005 678 no9 tu"es'
)a'iograph" #es No
Comments:
ADDITIONAL REQUIREMENTS
-"'ro.Pneumatic Test #es No %. tu"es nee$ p#u,,in,0 pressure tests ma( "e &on$u&te$ as
$e&i$e$ "( %nspe&tion'
P), Ser%icing #es No
Other #es No
Comments
MANPOWER
/atargas $nspector #es No 1 :atar ;as %nspe&tor
N(E Technicians #es No 2 %R%S personne#< UT Te&!ni&ians
$nspection Time 3 T+e#e-!our s!i.ts'
PREPARED BY
Signature:
Name:
Title:
(ate:
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000