Pressure Equipment Inspection Requirements: Identification

This document provides inspection requirements for the No. 1 Drain Drum unit tag 03-V0211. It identifies cleaning and safety precautions needed before internal inspection. Support such as scaffolding, lighting and air hoses will be required. Visual, ultrasonic and dye penetration tests are planned to inspect the shell and nozzle welds. The inspection will require one water gas inspector and two NDT technicians working 12-hour shifts.

Uploaded by

Siva Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views

Pressure Equipment Inspection Requirements: Identification

This document provides inspection requirements for the No. 1 Drain Drum unit tag 03-V0211. It identifies cleaning and safety precautions needed before internal inspection. Support such as scaffolding, lighting and air hoses will be required. Visual, ultrasonic and dye penetration tests are planned to inspect the shell and nozzle welds. The inspection will require one water gas inspector and two NDT technicians working 12-hour shifts.

Uploaded by

Siva Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRESSURE EQUIPMENT

INSPECTION REQUIREMENTS
IDENTIFICATION
Unit:
Train 3 - Unit 02
Tag No:
03-V0211
Equipment Name:
No. 1 Drain Drum
VESSEL/CONFINED SPACE ENTRY REQUIRED: YES NO
CLEANING & PURGING REQUIREMENTS
Water Wash Caustic Wash Fuel Gas Purge Air Purge
Steaming N2 Purge Other: As Per Operations Requirements
OPENING FOR INSPECTION
an !a"s #es No Open Manway M
$nternal an !a"s #es No
Channel Co%er #es No
&un'le remo%e' #es No
Other Opening #es No
Comments:
SUPPORT SERVICES REQUIRED FOR INSPECTION
(emister )emo%e' #es No
Schoepentoeter )emo%e #es No
)asching )ings )emo%e #es No
Sca**ol'ing )equire' #es No nterna! s"a#o!$ to a""ess t%e s%e!!&no''!es at top si$e
echanical Cleaning #es No Power (rus% "!eanin) o* s%e!! an$ no''!e we!$s
+ighting )equire' #es No Vesse! sa*e +an$ ,amps insi$e -esse!.
Comments: 1. A&" %ose to (e arran)e$ i* *oun$ -ery %ot insi$e t%e Un$er)roun$ -esse!.
2. Pro-i$e 230 V e!e"tri" supp!y at man way.
INSPECTION
,isual $nspection #es No
Ultrasonic $nspection #es No T%i".ness on set TM,/s.
("e Penetrant #es No
agnetic Particle #es No 0%e!! an$ no''!e we!$s as per nspe"tor/s mar.in)s.
E''" Current #es No
)a'iograph" #es No
Comments:
ADDITIONAL REQUIREMENTS
-"'ro.Pneumatic Test #es No nterna! steam "oi! %y$ro test at 1 (ar ).
P), Ser%icing #es No
Other #es No
Comments
MANPOWER
/atar gas $nspector #es No 1 2atar )as nspe"tor
N(E Technicians #es No 2 NDT te"%ni"ians
$nspection Time 1 Twe!-e-%our s%i*ts
PREPARED BY
Signature:
Name:
Title:
(ate:
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000

You might also like