0% found this document useful (0 votes)
7K views23 pages

Quality Center Reports and Graphs

The document describes various reports and views in Quality Center that provide test coverage details, requirements traceability, test planning summaries, and test results data. These include requirements coverage analysis, test case traceability reports, test planning graphs that show status over time, and test results charts that analyze defects by severity. Navigation instructions are provided for each report.

Uploaded by

api-19979194
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7K views23 pages

Quality Center Reports and Graphs

The document describes various reports and views in Quality Center that provide test coverage details, requirements traceability, test planning summaries, and test results data. These include requirements coverage analysis, test case traceability reports, test planning graphs that show status over time, and test results charts that analyze defects by severity. Navigation instructions are provided for each report.

Uploaded by

api-19979194
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 23

INTERNAL

Requirements Coverage Analysis View


Displays Project Test Coverage Details with Ability to Drill and Rollup Data

Note: Click on Coverage Analysis Data to open Coverage Analysis Details (on next slide)

INTERNAL
Requirements Coverage Analysis & Test Coverage Chart
Displays Project Test Coverage Details with Ability to Drill and Rollup Data

Note: You can Copy images to Clipboard; include in Email and Documentation
INTERNAL
Requirements Document View
(Default view)

Note: Numeration selected – Paragraph Numbers displayed with Name. CaliberRM ID is displayed.

INTERNAL
Requirements Reports
public: _Reqs to Test Case Traceability – Summary
Run from QC Requirements Tab: Analysis -> Reports -> public: _Reqs to Test Case Traceability – Summary

Notes: Report includes – Paragraph #, CaliberRM Name, CaliberRM Priority, Cover(age) Status, CaliberRM
ID.
Filter: CaliberRM Project = _Quality Center eLearning
INTERNAL
Requirements Graphs
public: _REQ Test Coverage Summary
Run Report from QC Requirements Tab: Analysis -> Graph -> public: _REQ Test Coverage Summary

Notes: Graph displays Coverage Status Summary for REQs (High-Level Requirements)
A version of this report is available for DETs – public: _DET Test Coverage Summary

INTERNAL
Requirements Graphs
public: _REQ Test Coverage Details
Run Report from QC Requirements Tab: Analysis -> Graph -> public: _REQ Test Coverage Details

Notes: Graph displays Coverage Status Details for REQs (High-Level Requirements)
A version of this report is available for DETs – public: _DET Test Coverage Details

INTERNAL
Test Planning – Summary Graph (Bar Chart and Data Grid views)
Run Report from QC Test Plan Tab: Analysis -> Graph -> <Summary> - Group by ‘Status’

Bar Chart view - Data Grid view

Notes: Graph displays Test Planning Summary Data (Test Status values)
Select this option: X-Axis: Designer (or select: Test Priority or Subject (group by Test Folders))
Filter on: Subject (Project Level Test Folder) and Creation Date (if desired)
INTERNAL
Test Planning – Summary Graph (Bar Chart and Data Grid views)
Run Report from QC Test Plan Tab: Analysis -> Graph -> <Summary> - Group by ‘Status’

Bar Chart view - Data Grid view

Notes: Graph displays Test Planning Summary Data (Test Status values)
Select this option: X-Axis: Test Priority (example)
Filter on: Subject (Project Level Test Folder) and Creation Date (if desired)

INTERNAL
Test Planning – Progress Graph (Line Chart and Data Grid views)
Run Report from QC Test Plan Tab: Analysis -> Graph -> <Progress> - Group by ‘Status’

Line Chart view - Data Grid view

Notes: Graph displays Test Planning Progress (Test Status Changes – over time)
Select these options: Period (e.g. Last 12 months) and Changes over Time
Deselect this option: Show daily info (unless you want daily data)
Filter on: Subject (Project Level Test Folder) and Creation Date (if desired)

INTERNAL
Test Planning – Trend Graph (Bar Chart and Data Grid views)
Run Report from QC Test Plan Tab: Analysis -> Graph -> <Trend> - Group by ‘Status’

Bar Chart view - Data Grid view

Notes: Graph displays Test Planning Trend Data (Test Status values)
Select this option: Period: Last 5 weeks (example)
Filter on: Subject (Project Level Test Folder) and Creation Date (if desired)

INTERNAL
Test Coverage Matrix – Planning Report

Notes: Test Set/Execution Cycle is set to Test Sets (short names).


Used to assign/move Test Cases into Test Sets.

INTERNAL
Requirements to Test Case Traceability (Test Coverage) Report
public: _Reqs to Test Case Traceability – Detailed
Run from QC Requirements Tab: Analysis -> Reports -> public: _Reqs to Test Case Traceability – Details

Notes: Report includes – Summary Report data plus Test Coverage details.
INTERNAL
Test Results Data – Part I (Bar Chart) - Tests Execution Status.

INTERNAL
Test Results Data – Part I (Data Grid) - Tests Execution Status.

INTERNAL
Test Results Data – Part II (Bar Chart) - Project Defects by Severity/Status.

INTERNAL
Test Results Data – Part II (Data Grid) - Project Defects by Severity/Status.

INTERNAL
Test Results Data – Part II (Pie Chart) - Project Defects by Severity.

INTERNAL
Testing/Warranty Defect Summary Log – Part I (Bar Chart) - Source/Where Found

INTERNAL
Testing/Warranty Defect Summary Log – Part I (Data Grid) - Source/Where Found

INTERNAL
Testing/Warranty Defect Summary Log – Part II (Bar Chart) - Severity/Where Found

INTERNAL
Testing/Warranty Defect Summary Log – Part II (Data Grid) - Severity/Where Found

INTERNAL
Open Defects Report

INTERNAL

You might also like