First Inspection Second Inspection Final Inspection

The inspection report summarizes issues found with the mechanical plumbing system installation and provides recommendations. Fourteen items were identified with discrepancies in areas like improper installation of floor clean outs, lack of bypass manholes, issues with septic tanks, water tanks, and plumbing in various areas. Recommendations are provided such as using proper covers, adding manholes, ensuring proper venting and slopes for pipes, and adjusting locations and heights of valves and pipes. All issues need corrections to meet standards and prevent future leaks or smells.

Uploaded by

Dareen Bared
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
103 views

First Inspection Second Inspection Final Inspection

The inspection report summarizes issues found with the mechanical plumbing system installation and provides recommendations. Fourteen items were identified with discrepancies in areas like improper installation of floor clean outs, lack of bypass manholes, issues with septic tanks, water tanks, and plumbing in various areas. Recommendations are provided such as using proper covers, adding manholes, ensuring proper venting and slopes for pipes, and adjusting locations and heights of valves and pipes. All issues need corrections to meet standards and prevent future leaks or smells.

Uploaded by

Dareen Bared
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Inspection Report

Date of Inspection: 15/05/2014



First Inspection Second Inspection Final Inspection

Contract No. : ----
P.O. itle : ----

Discipline : !ec"anical #pl$%&in' s(ste%)
Pro*ect !ana'er :

"e inspection are &ase on act$al condition of %ec"anical pl$%&in' pro+ision
,ere "as &een installed. In connection ,it" t"at ,e are loo-in' ,it" 'ood .$alit(
of installation and so%e co%pre"end pl$%&in' pro+isions are not co%pliance
,it" t"e standard code.

/ere,it" t"e conse.$ences of i%proper installation and ,it" re%ar-s &(
reco%%endations ,a( of p$ttin' e0act or accepta&le actions ,"ic" are as follo,s:



Ite%

Descripti+e of
Discrepanc(


Inacc$rac(


1eco%%endations
External


01 I%proper
installation of
floor clean o$t
#FCO) co+er.
1. 2ns$ita&le cleano$t co+er for
residential e0ternal area t"at
,as installed ,"ic" are for
p$&lic draina'e line.
2. 1ain,ater 'oes do,n to t"e
septic tan- t"en it ,ill f$ll.
3. Contri&$te a pl$%e of se,er
'as odor or stin-( se,er
s%ells fro% sanitar( &$ildin'
pipes and septic tan-.
Pro+ide cleano$t co+er ,it" r$&&er seal
appropriate to t"e e0ternal for
residential "o$ses.



02 No &(pass
%an"ole for
septic tan-
1. No access of connection for
f$t$re %$nicipal se,er
tappin' pipe and no location
for none ret$rn +al+e #N14).
2. No pri%ar( access for
%aintenance p$rposes in
case of clo''in' of &$ildin'
sanitar( connection to septic
tan-.
Pro+ide se,er &(pass %an"ole near to
septic tan- ,it" proper si5in' in
di%ensions acc$rate to pipe in+ert le+el
#PI6) of &$ildin' sanitar( pipe.
Pro+ide 170 %% dia%eter of f$t$re
%$nicipal se,er tappin' pipe ,it"
proper installation in ter%s of slope at
least 18 as ,ell as pipe &eddin'.
Pro+ide 170 %% none ret$rn +al+e for
f$t$re %$nicipal pipe.
03 Installation of
2nder'ro$nd
Septic tan-
1. No constant 'ra+it( flo, of
se,a'es 'oes to sanitar(
pipes ,"ic" is t"e pri%ar(
ca$se of clo''in'.
Pro+ide at least 95%% +ent pipe of septic
tan- to t"e appropriate location in
&o$ndar( ,alls ,it" 5 %eters a,a( fro%
fa%il( entrance
:ns$re t"at t"e septic tan- pro+ision is
di+idin' in to t,o co%part%ents of 908
di'esti+e and 308 leac"in' co%part%ent
,it" proper installation of internal &affle
and passa'e pipe.
:ns$re t"at t"e %an"ole co+er of septic
tan- s"o$ld "a+e r$&&er seal to a+oid
se,er s%ells for% septic tan- 'ases.

04 Installation of
2nder'ro$nd
pota&le ,ater
tan-; pro+ision of
s$ppl( pipes and
Floor drain
strainer
1. Press$ri5ed inside t"e ,ater
tan-.
2. 1is- operation of %otor p$%p
d$e to no constant press$re
'oin' in to t"e s$ction pipe.
Pro+ide proper air +ent of 2nder'ro$nd
tan- at least 95%% dia%eter.
:ns$re t"at t"e &aladi(a s$ppl( pipe
pro+ision s"o$ld "a+e o$tside.
:ns$re t"at t"e s$ppl( and o+erflo,
pipe for o+er"ead tan- s"o$ld install
&elo, t"e e0ternal screed to a+oid
&rea-in' of tiles d$rin' connection of
,ater s(ste% for o+er"ead tan-.
:ns$re t"at t"e Floor drain strainer
near of ,ater tan- co+er s"o$ld not 'oes
to t"e septic tan-; it s"o$ld direct to t"e
road to a+oid f$ll of ,ater in septic tan-
on %a0i%$% +ol$%e of rain,ater.
Ground, First
and Penthouse
floor in Main
Building


01 Installation of
stand pipe for
trap connection
of ,ater closet



-----------
:ns$re t"at s"o$ld acc$rate di%ension
reference to t"e ,all as per %oc- $p
sa%ple of ,ater closet to a+oid f$t$re
lea-a'e of li.$id ,aste.
:ns$re t"at t"e +ents t"r$ roof
connection are not 'reater t"an ei'"t #<)
feet fro% t"e center of trap seal.
02 I%proper
pro+ision of
Perennial spra(
1. "e "ot ,ater line #%i0ed)
pro+ision for perennial spra(
are not necessaril( "ere in
dr( area; it contri&$te
conf$sion to t"e $sers &(
%i0in' control at t"e proper
te%perat$re.
2. Perennial spra( in certain ,et
area is too far ,"ic" is
inappropriate location as per
act$al condition of ,ater
closet pipe pro+ision.
Pro+ide &lind c$p for "ot ,ater line to
a+oid conf$sion to t"e $sers and to
pre+ent fro% %oral i%pair%ent or
deteriorations.
Perennial spra( s"o$ld 35 c% fro% t"e
center of ,ater closet 'oin' to ri'"t side
,it" 45 c% "ei'"t fro% finis" floor tiles
le+el.



03 Installation of
s"o,er %i0er
pro+ision.

------------------
:ns$re t"at all s"o,er %i0in' +al+es
pro+ision #"ot = cold) are s"o$ld &e
confor%ed to t"e len't" of s$ppl( inlet
of %i0in' +al+es as per %oc- $p sa%ple.
:ns$re t"at t"e location of ,ater s$ppl(
of %i0in' +al+es are appropriate to t"e
"ei'"t of &at"t$& #if applica&le)
04 Installation of
,ater closet tan-
s$ppl(

------------------
:ns$re t"at all location of ,ater tan-
s$ppl( pro+ision s"o$ld &e confor%ed as
per %oc--$p sa%ple of ,ater closet if it
is on t"e left side of >C.
05 Installation of
floor drain
strainer

------------------
:ns$re t"at all floor drain in ,et area
s"o$ld &e e.$ipped ,it" P-trap
:ns$re t"at t"e +ents t"r$ roof
connection are not 'reater t"an ei'"t #<)
feet fro% t"e center of floor drain trap
seal.
:ns$re t"at all floor drain aro$nd
strainer &od( s"o$ld &e applied ,it"
proper ca$l-in' to a+oid f$t$re lea-a'e.
07 Installation of
la+ator( pipe
pro+ision


:ns$re t"at all ,all drain pipe are
connected to t"e Floor Drain &efore t"e
P-rap in place and t"e "ot = cold ,ater

------------------ s$ppl( location s"o$ld &e confor%ed as
per %oc--$p sa%ple of la+ator( $nit in
ter%s of desi'n classification.
09 I%proper
installation of
-itc"en sin-
,ater s(ste%
s$ppl(
1. Inappropriate locations of
,ater s$ppl( +al+e connection
pro+ision; all are 'reater t"an
t"e standard "ei'"t of
-itc"en sin-; t"ere is no ,a(
to connect. Present "ei'"t as
per act$al is 11?c% fro%
finis" floor tile le+el.
S"ift t"e s$ppl( +al+es pro+ision do,n
,ard at 70c% %a0i%$% "ei'"t fro%
finis" floor tile le+el.

0< I%proper
installation of
-itc"en sin-
,aste li.$id pipe
pro+ision
1. Inappropriate locations of
li.$id ,aste pipe for -itc"en
sin-. !ostl( $nder -itc"en
sin- is ca&inets for
-itc"en,are; not possi&le to
connect fro% fle0i&le trap of
-itc"en sin-.

S"ift and pro+ide a ,all drain pipe
pro+ision connected to t"e -itc"en floor
drain ,it" 50c% %a0i%$% "ei'"t fro%
finis" tile le+el

0? I%proper
installation of
'as pipe s(ste%
1. No pri%ar( isolation +al+e
pro+ision inside t"e -itc"en
area for 'as pipe line encase
of e%er'enc( and
%aintenance p$rposes.
Pro+ide isolation +al+e for 'as pipe line
on accessi&le area for %aintenance
p$rposes ,it" 70c% "ei'"t fro% finis"
floor tile le+el.
:ns$re t"at all pipin' for 'as line s"o$ld
&e tested at %ini%$% 40 psi ,it"in <
"o$rs.

10 Installation of
/ot and Cold
pipes

------------------
:ns$re t"at all pipin' for ,ater s(ste%
s"o$ld &e tested at %ini%$% 150 psi
,it"in < "o$rs.

11 I%proper
installation of
,ater s$ppl(
isolation +al+es
for all ,et areas
and -itc"en
1. Inappropriate location of
isolation +al+es ,"ic" all are
$nsafe; it@s li-el( to ca$se
"ar% to t"e $sers passin' &(
"ead or ar%s. Present act$al
"ei'"t is #A)#-)147c% fro%
finis" floor tile le+el.
S"ift do,n,ard all isolation +al+es of
,ater s(ste% at 70c% "ei'"t fro% finis"
floor tile le+el in accessi&le area or near
&elo, t"e la+ator(.

12

No f$%e "oods
pro+ision for
-itc"en ran'e.
1. "e f$%es ,ill spread o$t on
t"e ,all and &elo, t"e sla&
t"en it ,ill contri&$te of ot"er
"ealt" "a5ards.
Pro+ide f$%e "oods to %aintain clean
and 'ood "ealt" to t"e client.

13

Installation of
,ater "eader
pipe and
distri&$tion
pipes

1. It co$ld not ,it"stand and it
,ill create f$t$re lea-a'e.
Pro+ide proper pipe s$pport to a+oid
+i&ration and f$t$re lea-a'e.

14

Installation of
o+er"ead tan-
,it" %ec"anical
de+ices and
e.$ip%ent

------------------
Please refer to t"e installation of IBP
details



Inspected B( : Date : CCCCCCCCCCCCCCCCC