Fire Water System Details

This document appears to be a map and list of fire hydrant locations for an industrial facility. It contains a diagram showing the layout of buildings and infrastructure on the site. It also includes two tables that provide the location details of over 190 fire hydrants across four loops in the facility, identifying each by a unique code and describing its precise location. The level of detail in the map and tables indicates they are intended to help emergency responders quickly locate fire hydrants in the event they need to access water from the site's fire protection system.

Uploaded by

friendbce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
198 views

Fire Water System Details

This document appears to be a map and list of fire hydrant locations for an industrial facility. It contains a diagram showing the layout of buildings and infrastructure on the site. It also includes two tables that provide the location details of over 190 fire hydrants across four loops in the facility, identifying each by a unique code and describing its precise location. The level of detail in the map and tables indicates they are intended to help emergency responders quickly locate fire hydrants in the event they need to access water from the site's fire protection system.

Uploaded by

friendbce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 4

SWYD C.

R
ST-1 O&M AREA
FIRE WATER LINE
BMB Bldg
ESP-2
I
C
T
-
1

I
C
T

-
2

BR-2 BR-1
BOILER-1
MISC
P.H
TP-3
ESP-3 ESP-4 ESP-1
F.A.P.H AHM & MM Store
TURBIINE BLDG
H2 PLT
FOPH-1 FOPH-2
ST-1 ST-2 GT-1 GT-2 GT-3 GT-4 COPU
BOILER-2 BOILER-3 BOILER-4
MILLS
PA FANS
CHIMNEY
ST-1 F.W.P.H
F O TANKS
To CT
Area
Towards CHP
ROAD ROAD
ESP C.R + ID & FD ESP C.R +ID & FD
LOOP 1

LOOP 2

LOOP 3

HYD VLV LOOP 4

HYD MONITOR OVR GRND
Comp House
N
FABCN YARD
ROAD
R
O
A
D


R
O
A
D


STAGE-2
O A C
Prepared by S. Paul
P-3 P-2 P-1
R
O
A
D


O&
M
ST
R
3
0
0


n
b

3
0
0


n
b

3
0
0


n
b

1
5
0


n
b

2
0
0


n
b

2
0
0


n
b

2
0
0


n
b

150 nb
200 nb
150 nb
300 nb
300 nb
150 nb
150 nb
200 nb
150 nb
150 nb
150 nb
150 nb
3
0
0


n
b

150 nb
200 nb
1
5
0


n
b

CIVIL Office
WORK SHOP
C
l
2

P
L
T

D
M

P
L
T
-
1

DM PLT-2
CLF
F
I
R
S
T

A
I
D

SWYD
UPH-1 UPH-2
F.H -9 NOs
F.H - 4 NOs
F.H - 6 NOs
(1.15 1.20)
F.H - 4 NOs
(1.22 1.25)
F.M - 2 NOs
F.M - 4 NOs
AUX.BOILER
F.H - 9 NOs
(3.48 3.56)
3
0
0


n
b

CT-2 CT-1
CT-3 CT-4
W
A
S
T
E


W
T
R

P
.
H

CT
FOUNTAIN
125 nb
80 nb
150 nb
150 nb
SERVICE
BLDG
1.3
1.6 1.9
1.12
1.14
1.1
1.2 1.13
1.21
2.1
2.7
2.11
3.12
3.13
3.1
1.67
1.4 1.10 1.11 1.5
1.7
1.8 1.7
DM
TK
LOOP 1 HYDRANT VALVES
F.H VLVS LOCATION F.H VLVS LOCATION F.H VLVS LOCATION F.H VLVS LOCATION
1.1 Stn Xmer 1 1.24 Bowl Mill U3 1.47 BOILER-4 : 24 Mtr 1.70 Blr 1 B/Side 32 Mtr
1.2 Near GT1 1.25 Bowl Mill U4 1.48 BOILER-4 : 18 Mtr 1.71 Blr 1 B/Side 24 Mtr
1.3 UPH-1 1.26 BOILER-1 : 52 Mtr 1.49 BOILER-4 : 12 Mtr 1.72 Blr 1 B/Side 18 Mtr
1.4 U1 Air Washr Room 1.27 BOILER-1 : 42 Mtr 1.50 TG Unit 1 12 Mtr 1.73 Blr 1 B/Side 12 Mtr
1.5 Near GT2 1.28 BOILER-1 : 32 Mtr 1.51 TG Unit 1 3.2 1.74 Blr 2 B/Side 52 Mtr
1.6 Front side of UPH-1 1.29 BOILER-1 : 24 Mtr 1.52 TG Unit 1 12 Mtr 1.75 Blr 2 B/Side 42 Mtr
1.7 U2 Air Washr Room 1.30 BOILER-1 : 18 Mtr 1.53 TG Unit 1 0 Mtr 1.76 Blr 2 B/Side 32 Mtr
1.8 Near GT3 1.31 BOILER-1 : 12 Mtr 1.54 TG Unit 2 12 Mtr 1.77 Blr 2 B/Side 24 Mtr
1.9 UPH-1 1.32 BOILER-2 : 52 Mtr 1.55 TG Unit 2 3.2 Mtr 1.78 Blr 2 B/Side 18 Mtr
1.10 U3 Air Washr Room 1.33 BOILER-2 : 42 Mtr 1.56 TG Unit 3 12 Mtr 1.79 Blr 2 B/Side 12 Mtr
1.11 Near GT4 1.34 BOILER-2 : 32 Mtr 1.57 TG Unit 3 3.2 Mtr 1.80 Blr 3 B/Side 52 Mtr
1.12 Front side of UPH-2 1.35 BOILER-2 : 24Mtr 1.58 TG Unit 1 12 Mtr 1.81 Blr 3 B/Side 42 Mtr
1.13 U4 Air Washr Room 1.36 BOILER-2 : 18 Mtr 1.59 TG Unit 1 3.2 Mtr 1.82 Blr 3 B/Side 32 Mtr
1.14 Near COPU 1.37 BOILER-2 : 12 Mtr 1.60 Service Building 1.83 Blr 3 B/Side 24 Mtr
1.15 U4 BLR-0 Mtr 1.38 BOILER-3 : 52 Mtr 1.61 Service Building 1.84 Blr 3 B/Side 18 Mtr
1.16 U3 BLR-0 Mtr 1.39 BOILER-3 : 42 Mtr 1.62 TG Unit 4 12Mtr 1.85 Blr 3 B/Side 12 Mtr
1.17 U2 BLR-0 Mtr 1.40 BOILER-3 : 32 Mtr 1.63 TG Unit 4 3.2Mtr 1.86 Blr 4 B/Side 52 Mtr
1.18 U1 BLR-0 Mtr 1.41 BOILER-3 : 24 Mtr 1.64 TG Unit 4 12Mtr 1.87 Blr 4 B/Side 42 Mtr
1.19 Blr B/Side 4 1.42 BOILER-3 : 18 Mtr 1.65 TG Unit 4 3.2Mtr 1.88 Blr 4 B/Side 32 Mtr
1.20 South Side Misc P/H 1.43 BOILER-3 : 12 Mtr 1.66 Swyd B/Side 1.89 Blr 4 B/Side 24 Mtr
1.21 Below Tp-3 '0' Mtr 1.44 BOILER-4 : 52 Mtr 1.67 Swyd F/Side 1.90 Blr 4 B/Side 18 Mtr
1.22 Bowl Mill U1 1.45 BOILER-4 : 42 Mtr 1.68 Blr 1 B/Side 52 Mtr 1.91 Blr 4 B/Side 12 Mtr
1.23 Bowl Mill U2

1.46 BOILER-4 : 32 Mtr 1.69 Blr 1 B/Side 42 Mtr 1.92 Tg Unit 4 12Mtr
LOOP 2 HYDRANT VALVES
FH
VLVS
LOCATION FH
VLVS
LOCATION FH
VLVS
LOCATION FH
VLVS
LOCATION FH
VLVS
LOCATION
2.1 Comp House B/S 2.21 - Do - 2.41 - Do - 2.61 Crusher House F/Side 2.81 TP No. 5
2.2 Comp House F/S 2.22 - Do - 2.42 - Do - 2.62 Crusher House N/Side 2.82 TP No. 3
2.3 Foph South Side 2.23 CHP HEAP NO-2 2.43 - Do - 2.63 TP - 4 2.83 TP No. 3
2.4 Foph Back Side 2.24 - Do - 2.44 - Do - 2.64 TP - 1 2.84 Service Building
2.5 Foph North Side 2.25 - Do - 2.45 - Do - 2.65 Track Hopper C/Room 2.85 Service Building
2.6 F.O.Tank No. 1 2.26 - Do - 2.46 - Do - 2.66 Crusher House 2.86 Service Building
2.7 F.O.Tank No. 4 2.27 - Do - 2.47 - Do - 2.67 Track Hopper 2.87 Service Building
2.8 F.O.Tank Back Side 2.28 - Do - 2.48 CHP HEAP NO-5 2.68 Track Hopper G/Floor 2.88 TP-3 ground floor
2.9 F.O.Tank Back Side 2.29 - Do - 2.49 - Do - 2.69 Track Hopper G/Floor 2.89 TP-1 1st floor
2.10 F.O.Tank Front Side 2.30 - Do - 2.50 - Do - 2.70 Track Hopper 2.90 Track hopper
2.11 F.O.Tank Front Side 2.31 CHP HEAP NO-3 2.51 - Do - 2.71 TP - 1 1st floor 2.91 CHP control room
2.12 Tp-5 Ground Floor 2.32 - Do - 2.52 - Do - 2.72 TP - 1 2nd floor 2.92 CHP control room
B/S
2.13 Tp-2 Ground Floor 2.33 - Do - 2.53 - Do - 2.73 TP - 4 2.93 CHP control room
2.14 CHP HEAP NO-1 2.34 - Do - 2.54 - Do - 2.74 Crusher House 2.94 Compressor House
2.15 - Do - 2.35 - Do - 2.55 - Do - 2.75 Crusher House 2Nd
Floor
2.95 Compressor House
2.16 - Do - 2.36 - Do - 2.56 - Do - 2.76 Crusher House Top
Floor
W/No. Bunker Floor
2.17 - Do - 2.37 - Do - 2.57 Swyd Near E/Gate 2.77 Crusher House Top
Floor
W/No. Bunker Floor
2.18 - Do - 2.38 - Do - 2.58 Auto Xmer No 2 2.78 Crusher House B/Side W/No. Bunker Floor
2.19 - Do - 2.39 CHP HEAP NO-4 2.59 Reactor Trans.No.1 2.79 Crusher House B/Side W/No. Bunker Floor
2.20 - Do - 2.40 - Do - 2.60 Reactor Trans.No.2 2.80 TP No. 2 W/No. Bunker Floor
LOOP 3 HYDRANT VALVES
F.H
VLVS
LOCATION F.H
VLVS
LOCATION F.H
VLVS
LOCATION F.H
VLVS
LOCATION
3.1 Central wksp b/s 3.24 Central store east/s 3.47 Service building 3.70 Central store f/s
3.2 Annex building f/s 3.25 Central store shed no. 9 3.48 auxilary blr 3.71 auto base front side
3.3 Annex building f/s 3.26 Central store shed no. 10 3.49 blr maint. Build 3.72 material test lab b/s
3.4 Service building f/s 3.27 Central store shed no. 12 3.50 blr maint. Build 3.73 Hydrogen plant
3.5 Service building b/s 3.28 Central store shed no. 8 e/s 3.51 blr maint. Build 3.74 Hydrogen plant
3.6 First aid f/s 3.29 Central store shed no. 8 3.52 blr maint. Build 3.75 Hydrogen plant
3.7 First aid b/s 3.30 Central store shed no. 6 3.53 Elect maint. Build 3.76 Hydrogen plant
3.8 DM Plant f/s 3.31 Store office back side 3.54 Elect maint. Build 3.77 Hydrogen plant
3.9 DM Plant b/s 3.32 steel yard front side 3.55 Elect maint. Build b/s
3.10 DM Plant b/s 3.33 Central store shed no. 4 3.56 auxilary blr s/s
3.11 DM Plant f/s 3.34 Central store shed no. 1 3.57 central wksp
3.12 Cooling water 1&2 3.35 Central store shed no. 1 3.58 central wksp f/s
3.13 Cooling water 4&3 3.36 auto base back side 3.59 First aid b/s
3.14 Annex building store 3.37 Central store shed no. 2 3.60 O&M store
3.15 Annex building store 3.38 Central store shed no. 3 b/s 3.61 O&M store
3.16 Chlorination [plant 3.39 Central store near CCD-1 3.62 O&M store b/side
3.17 Chlorination [plant 3.40 auto base back side 3.63 LCC front side
3.18 Chlorination [plant 3.41 material test lab f/s 3.64 DG set No.2
3.19 Plant canteen b/s 3.42 computer building b/s 3.65 Central store b/s
3.20 Hydrogen plant b/s 3.43 computer building 3.66 Central store b/s
3.21 Plant canteen f/s 3.44 computer building b/s 3.67 Central store b/s
3.22 DG set No.1 3.45 Service building 3.68 Central store f/s
3.23 33kv sub station 3.46 Service building 3.69 Central store f/s