0% found this document useful (0 votes)
190 views

Trans Adriatic Pipeline ESIA

This document contains technical drawings and diagrams related to the construction methods and crossings for the Trans Adriatic Pipeline project in Albania. It includes layouts of construction camps and pipe yards, diagrams of pipeline construction techniques like horizontal directional drilling and various types of crossings for roads, rivers and railways. Methods for pipeline stabilization and protection are also illustrated. The drawings provide visual information to supplement descriptions in the environmental and social impact assessment report for the TAP pipeline in Albania.

Uploaded by

hermit44535
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
190 views

Trans Adriatic Pipeline ESIA

This document contains technical drawings and diagrams related to the construction methods and crossings for the Trans Adriatic Pipeline project in Albania. It includes layouts of construction camps and pipe yards, diagrams of pipeline construction techniques like horizontal directional drilling and various types of crossings for roads, rivers and railways. Methods for pipeline stabilization and protection are also illustrated. The drawings provide visual information to supplement descriptions in the environmental and social impact assessment report for the TAP pipeline in Albania.

Uploaded by

hermit44535
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

ESIA Albania

Annex 3.6 Technical Drawings


Working Strip, Construction
Methods and Crossings
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Layout of Pipe Yards
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale
Figure 4.3-6 2/17
PB SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
SOURCE:
Annex 3.6 - Technical Drawings -
Working Strip, Construction Methods and
Crossings
ALB
1-3-4. Source: APPENDIX 1 Preliminary Logistic Report Albania
Document Reference G APL00-ILF-100-F-TRP-0002_00
1
2
3
4
2. Figure 4-2 of Appendix 3: Comparison of Logistic Concepts Greece
00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.3-7 3/17
ALB DAL SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Example Photographs of Pipeline Construction Camps
Parking for trucks
and trailers
Workshop
Stores
Offices





First
Aid
Room
Staff
Canteen

Leisure
Room
A
c
c
o
m
o
d
a
t
i
o
n

B
u
i
l
d
i
n
g
s

Parking for
cars
Generator
Fuel Stati-
Wastewater
Fence
Heli landing
area
General Layout of a Pipeline Construction Camp
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
Typical Layout of Construction Workers Camp
Source: APPENDIX 1 Preliminary Logistic Report Albania
Document Reference G APL00-ILF-100-F-TRP-0002_00
00 13/12/12 Issued for Information
Pipe Delivery Truck for Main Highways
Special Delivery Vehicle for Difficult Terrain
Special Delivery Vehicle for Un-made Roads
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipe Delivery Trucks and Special Vehicles
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.3-8 4/17
DAL SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
ALB
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
Source: APPENDIX 1 Preliminary Logistic Report Albania
Document Reference F APL00-ILF-100-F-TRP-0002_00
00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Hydrotesting Overview
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale
Figure 4.4-10 5/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
DAL ALB
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
SOURCE: ERM 2012
SPREAD 1 (49km) SPREAD 2 (27km)
S
P
R
E
A
D

3

(
1
3
k
m
)

SPREAD 4 (45km)
SPREAD 5 (36km) SPREAD 6 (41.8km)
00 13/12/12 Issued for Information


CHECK TRANS ADRIATIC PIPELINE

CLIENT:
DATE
0131979
REV
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-11
6/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Typical Components of Microtunnelling
(Note: image depicts a marine microtunnel and is only indicative of the technique)
Example of Casing/Jacking Pipe
Microtunnel Boring Machines (MTBM)
A MTBM in the Jacking Shaft
Albania ESIA Report
DAL ALB
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
Typical Jack and Bore Method
Source: ERM SpA (January 2012)
Source: Herrenknecht, 2011 (retrieved November 2011)
Source: Photobucket 2011
(retrieved November 2011)
Source: Acelvakond 2011
(retrieved November 2011)
00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: Major Road - Crossings
with Casing Pipe (Thrust Boring) for 48 pipeline
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-12
7/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB 00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
Pipeline Construction: Minor Road Crossing
(Open Cut) for 48 Pipeline Type I, II, III & IV
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-13 8/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
DAL ALB
SOURCE:
00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: Railway Crossing with
Casing Pipe (Thrust Boring) for 48 Pipeline
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-14 9/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
SOURCE:
00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: Railway Crossings (Thrust
Boring) for 48 Pipeline (no casing)
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-15
10/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
SOURCE:
00 13/12/12 Issued for Information
Typical River Crossings
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction:
Typical River Crossings
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-16
11/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
Source: APL00-ILF-125-F-TRS-0001 Rev 0D
Attachment A - Typical Drawings, Civil Hydraulics
Engineering Concept, TAP Route Corovode to Berat
00 13/12/12 Issued for Information
Typical River Crossings
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: River Crossings
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale
Figure 4.4-17 12/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
Source: APL00-ILF-125-F-TRS-0001 Rev 0D Attachment A - Typical Drawings,
Civil Hydraulics Engineering Concept, TAP Route Corovode to Berat
00 13/12/12 Issued for Information
Horizontal Direction Drilling (HDD)
Source
26th Onshore Pipeline Engineering Course;
Construction principles, JP Kenny Ltd, Matthew Guite;
London, June 2011
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: Horizontal Direction Drill-
ings (HDD)
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-18 13/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB 00 13/12/12 Issued for Information

CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Pipeline Construction: Typical River Bed Laying
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-19
14/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
Source: CPL00-ENT-125-F-DFT-0012_0C Typical Installation in/along Riverzones for 48 Pipeline
00 13/12/12 Issued for Information
Protection against Erosion with Sandbags Pipeline Protection in Washout Area
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Methods of Pipeline Stabilisation: Protection
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-20 15/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB
Source: CPL00-ENT-125-F-DFT-0011_0B--Pipe Protection in washout area.pdf
00 13/12/12 Issued for Information
SOURCE:
CPL00-ENT-125-F-DFT-0012_0C--
Concrete Slab Protection for dirt roads
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Methods of Pipeline Stabilisation: Concrete Slab
Protection for Dirty Roads for 48 Pipeline
PROJECT:
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-21 16/17
SAA
Size:A4
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
DAL ALB 00 13/12/12 Issued for Information
CHECK TRANS ADRIATIC PIPELINE
CLIENT:
DATE
0131979
REV
Cross Section Layout of Reinstated Working Strip along
Modified Ridge
PROJECT:
ISSUE, SCOPE OF REVISION PREP. APR.
TITLE:
SCALE PROJECT DRAWING NO: SHEET OF
No scale Figure 4.4-22
17/17
SAA
Size:A4
Trans Adriatic Pipeline (TAP)
Albania ESIA Report
Annex 3.6 - Technical Drawings - Working
Strip, Construction Methods and Crossings
PIB ALB
Source: Working strip (ENT 2012) Doc. Ref. CPL00-ENT-100-F-DFT-0001, Rev.:03, 2012-10-19

00 13/12/12 Issued for Information
Trans Adriatic Pipeline AG Albania (Branch Office)
Torre Drin, Rruga Abdi Toptani
Tirana, Albania
Tel.: +355 44 306 937
Fax: +355 42 265 685
[email protected]
www.tap-ag.com
Date 01/2013
Copyright Reserved: This document may not be copied, shown to or placed at the disposal of third parties without prior consent of TAP AG.
The latest version of the document is registered in the TAP Project's Database.

You might also like