Legend: Issue Tracker Sheet Project: KLR, Factory, Gurgaon: Critical Issues

This document is a legend for a project issue tracker sheet. It contains 16 critical issues for a factory project in Gurgaon. The issues include contacting vendors for electrical and piping specifications, finalizing cable routes, arranging HVAC, and developing initial partition drawings. Most issues have target dates from 19-21 December and statuses of "in progress" or clients and architects assigned as responsible parties.

Uploaded by

Dhruv Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Legend: Issue Tracker Sheet Project: KLR, Factory, Gurgaon: Critical Issues

This document is a legend for a project issue tracker sheet. It contains 16 critical issues for a factory project in Gurgaon. The issues include contacting vendors for electrical and piping specifications, finalizing cable routes, arranging HVAC, and developing initial partition drawings. Most issues have target dates from 19-21 December and statuses of "in progress" or clients and architects assigned as responsible parties.

Uploaded by

Dhruv Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Legend: Critical Issues Pending

Completed In Progress
S. No. Issue
Action
Initiated
on
Target
Date
Actual Date Action By Remarks
19-Dec Client: Mr. Pinto
Contact Ashish at SOPAN
Engineering (09405291918)
20-Dec Sopan: Ashish Pipes are to be laid along the walls
2
Electrcial cable route and specifications for industrial
wiring
21-Dec
Client: Mr.
Lawrence
3 Electrcial cable route and specifications for point wiring 21-Dec
Client: Mr.
Lawrence
4 Route of data/voice cables 21-Dec
Client: Mr.
Lawrence
5 Route of security system cables 21-Dec
Client: Mr.
Lawrence
6 Route of fire detection system cables 21-Dec
Client: Mr.
Lawrence
7
Load and details of Electrical cables, Low voltage wires for
machines, desired routes, arrangement for cable trays
19-Dec Client: Mr. Pinto
Contact Mr. Inderbahl at TRINITRON
(09811054543)
8
Details of `Access control and Security', desired routes,
arrangement for cable trays
19-Dec Client: Mr. Pinto Under process & finalization with HP
9
Details of `Any other services', desired routes,
arrangement for cable trays
19-Dec Client: Mr. Pinto Data/voice lines, LAN cabling etc
10 Loading of floor for deciding on the `Epoxy Paint' 19-Dec 19-Dec Client: Mr. Pinto
Movement of Manpower & Electrical
Fork lift model upto 1.5 Tons, Godrej
make
11 Arrangement of Fans for thermal comfort in Non-Ac areas 19-Dec Client: Mr. Pinto
Sthapati is asked to provide with
options/combination of split/cassette
for AC
12
Arrangement of ACs , wall mounted ACs have a throw of
20' maximum
19-Dec Client: Mr. Pinto Sthapati is asked to suggest options
19-Dec Client: Mr. Pinto Sthapati is asked to suggest options
24-Dec Architect
Sthapati suggested options:
1.Gypsum partition finished in paint
with double skinning, (to conceal
wiring)
2.Combination of aluminium partitions
facing the hall and gypsum partitions
between respective rooms
13.a Initial drawings for partitions & ceilings with proposed
material
24-Dec 24-Dec 24-Dec Architect Drawings sent
14 Electrical drawings 19-Dec 19-Dec Client: Mr. Pinto Sent Electrical drawings
15
High, low pressure piping & electrical wiring/cables needs
to be dropped down to the machine location. Organise a
teleconference.
21-Dec 23-Dec Architect Conference call done
16 Heat being generated in each machine for AC loads 23-Dec Client
Issue Tracker Sheet
Project : KLR, Factory, Gurgaon
13 Alternatives for material of the partitions with painted finish
Load of Piping and the pipe rack of the proposed lines 1