Legend: Issue Tracker Sheet Project: KLR, Factory, Gurgaon: Critical Issues
Legend: Issue Tracker Sheet Project: KLR, Factory, Gurgaon: Critical Issues
Completed In Progress
S. No. Issue
Action
Initiated
on
Target
Date
Actual Date Action By Remarks
19-Dec Client: Mr. Pinto
Contact Ashish at SOPAN
Engineering (09405291918)
20-Dec Sopan: Ashish Pipes are to be laid along the walls
2
Electrcial cable route and specifications for industrial
wiring
21-Dec
Client: Mr.
Lawrence
3 Electrcial cable route and specifications for point wiring 21-Dec
Client: Mr.
Lawrence
4 Route of data/voice cables 21-Dec
Client: Mr.
Lawrence
5 Route of security system cables 21-Dec
Client: Mr.
Lawrence
6 Route of fire detection system cables 21-Dec
Client: Mr.
Lawrence
7
Load and details of Electrical cables, Low voltage wires for
machines, desired routes, arrangement for cable trays
19-Dec Client: Mr. Pinto
Contact Mr. Inderbahl at TRINITRON
(09811054543)
8
Details of `Access control and Security', desired routes,
arrangement for cable trays
19-Dec Client: Mr. Pinto Under process & finalization with HP
9
Details of `Any other services', desired routes,
arrangement for cable trays
19-Dec Client: Mr. Pinto Data/voice lines, LAN cabling etc
10 Loading of floor for deciding on the `Epoxy Paint' 19-Dec 19-Dec Client: Mr. Pinto
Movement of Manpower & Electrical
Fork lift model upto 1.5 Tons, Godrej
make
11 Arrangement of Fans for thermal comfort in Non-Ac areas 19-Dec Client: Mr. Pinto
Sthapati is asked to provide with
options/combination of split/cassette
for AC
12
Arrangement of ACs , wall mounted ACs have a throw of
20' maximum
19-Dec Client: Mr. Pinto Sthapati is asked to suggest options
19-Dec Client: Mr. Pinto Sthapati is asked to suggest options
24-Dec Architect
Sthapati suggested options:
1.Gypsum partition finished in paint
with double skinning, (to conceal
wiring)
2.Combination of aluminium partitions
facing the hall and gypsum partitions
between respective rooms
13.a Initial drawings for partitions & ceilings with proposed
material
24-Dec 24-Dec 24-Dec Architect Drawings sent
14 Electrical drawings 19-Dec 19-Dec Client: Mr. Pinto Sent Electrical drawings
15
High, low pressure piping & electrical wiring/cables needs
to be dropped down to the machine location. Organise a
teleconference.
21-Dec 23-Dec Architect Conference call done
16 Heat being generated in each machine for AC loads 23-Dec Client
Issue Tracker Sheet
Project : KLR, Factory, Gurgaon
13 Alternatives for material of the partitions with painted finish
Load of Piping and the pipe rack of the proposed lines 1