Civil Works Schedule - Burgula 37.4MW Project

The document outlines a civil works schedule for the Burgula 37.4MW wind power project over several months. It provides status updates on excavation completion, road work completion, PCC foundation work, supply of wind turbine generators, and erection of wind turbines. As of July 24th, excavation was complete for 2 units and road work was complete for 0 units. The schedule notes that design mix 7-day testing is expected to be complete by August 7th, and that the schedule depends on the timely availability of foundation embeds and steel reinforcement on site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views

Civil Works Schedule - Burgula 37.4MW Project

The document outlines a civil works schedule for the Burgula 37.4MW wind power project over several months. It provides status updates on excavation completion, road work completion, PCC foundation work, supply of wind turbine generators, and erection of wind turbines. As of July 24th, excavation was complete for 2 units and road work was complete for 0 units. The schedule notes that design mix 7-day testing is expected to be complete by August 7th, and that the schedule depends on the timely availability of foundation embeds and steel reinforcement on site.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Category S.No. Month & Week No.

Unit
Road work
completion
Excavation
completion
Civil Works Schedule - Burgula 37.4MW Project
C
I
V
I
L
1
As on 24
th
July
Nos 2 0
C
I
V
I
L
2
Up to 31
st
July
Nos 2 2
C
I
V
I
L
Aug' 1
st
week
Nos 10 3
C
I
V
I
L
Aug' 2
nd
week
Nos 7 5
C
I
V
I
L
Aug' 3
rd
week
Nos 7 5
C
I
V
I
L
Aug' 4
th
week
Nos 7 5
C
I
V
I
L
Aug' 5
th
week
Nos 4 5
C
I
V
I
L
3 AUGUST '13 Nos 35 23
C
I
V
I
L
Sep' 1
st
week
Nos 4 5
C
I
V
I
L
Sep' 2
nd
week
Nos 3 5
C
I
V
I
L
Sep' 3
rd
week
Nos - 5
C
I
V
I
L
Sep' 4
th
week
Nos - 4
C
I
V
I
L
Sep' 5
th
week
Nos -
C
I
V
I
L
4 SEPTEMBER'13 Nos 7 19
C
I
V
I
L
Oct' 1
st
week
Nos - -
C
I
V
I
L
Oct' 2
nd
week
Nos - -
C
I
V
I
L
Oct' 3rd week Nos - -
Oct' 4th week Nos - -
Oct' 5th week Nos - -
5 October'13 Nos 0 0
November 1st week - -
November 2nd week - -
November 3rd week - -
November 4th week - -
November 5th week - -
6 November'13 0 0
Total Nos 44 44
Supply is subject to opening of LC by MEIL
As per contract Gamesa can depute maximum of 2 sets of cranes
NOTE :- Design Mix 7days test expected to be complete on 7
th
August.
Schedule is subjected to availability of Foundation Embed & Steel Reinforcement intime at site.
C
I
V
I
L
PCC Foundation WTG Supply WTG Erection
Civil Works Schedule - Burgula 37.4MW Project
0 0 0 0
2 0 0 0
3 0 4 0
6 1 5 0
5 5 5 0
5 6 6 0
5 6 5 2
24 18 25 2
5 5 2 3
5 5 3 3
5 5 4 3
3 5 4 4
0 6 2 3
18 26 15 16
- - 2 3
- - 2 3
- - 3
- - 4
- - 3
0 0 4 16
- - - 3
- - - 3
- - - 4
- - - 0
- - - 0
0 0 0 10
44 44 44 44
As per our schedule we have to
complete 8 erections in the month of
Nov instead of 10. The exceeding 2
no. need to be (if possible) completed
in the month of Aug (as per our
schedule).
NOTE :- Design Mix 7days test expected to be complete on 7
th
August.
Schedule is subjected to availability of Foundation Embed & Steel Reinforcement intime at site.