0% found this document useful (0 votes)
108 views

Union Airways

This document outlines the scheduling problem for Union Airways personnel across five shifts from 6am to 6am the following day. It lists the shifts, their costs per hour, and the minimum number of employees needed during each two-hour time period to satisfy demand. The goal is to determine how many employees should be assigned to each shift to minimize total staffing costs while meeting operational needs each period.

Uploaded by

Rahul Pathrabe
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views

Union Airways

This document outlines the scheduling problem for Union Airways personnel across five shifts from 6am to 6am the following day. It lists the shifts, their costs per hour, and the minimum number of employees needed during each two-hour time period to satisfy demand. The goal is to determine how many employees should be assigned to each shift to minimize total staffing costs while meeting operational needs each period.

Uploaded by

Rahul Pathrabe
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

1

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
A B C D E F G H I J K L M
Union Airways Personnel Scheduling Problem
6am-2pm 8am-4pm Noon-8pm 4pm-midnight 10pm-6am Range Name Cells
Shift Shift Shift Shift Shift CostPerShift C5:G5
Cost per Shift $170 $160 $175 $180 $195 MinimumNeeded J8:J17
Total Minimum NumberWorking C21:G21
Time Period Shift Works Time Period? (1=yes, 0=no) Working Needed ShiftWorksTimePeriod C8:G17
6am-8am 1 0 0 0 0 0 >= 48 TotalCost J21
8am-10am 1 1 0 0 0 0 >= 79 TotalWorking H8:H17
10am- 12pm 1 1 0 0 0 0 >= 65
12pm-2pm 1 1 1 0 0 0 >= 87
2pm-4pm 0 1 1 0 0 0 >= 64
4pm-6pm 0 0 1 1 0 0 >= 73
6pm-8pm 0 0 1 1 0 0 >= 82
8pm-10pm 0 0 0 1 0 0 >= 43
10pm-12am 0 0 0 1 1 0 >= 52
12am-6am 0 0 0 0 1 0 >= 15
6am-2pm 8am-4pm Noon-8pm 4pm-midnight 10pm-6am
Shift Shift Shift Shift Shift Total Cost
Number Working x1 x2 x3 x4 x5 $0

You might also like