The document outlines the design conditions and specifications for a semi-automatic wastewater treatment plant with a planned capacity of 50 m3 per day. It will use a conventional biofilter system and treat wastewater to comply with relevant effluent standards. The system includes various tanks for equalization, separation, reaction, and filtration, as well as components like pumps, blowers, and a control panel for automatic operation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
177 views
Ipal Wika
The document outlines the design conditions and specifications for a semi-automatic wastewater treatment plant with a planned capacity of 50 m3 per day. It will use a conventional biofilter system and treat wastewater to comply with relevant effluent standards. The system includes various tanks for equalization, separation, reaction, and filtration, as well as components like pumps, blowers, and a control panel for automatic operation.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3
Design Conditions (SEMI AUTOMATIC RUNNING)
STP Merk BIOFLA 1(SATU) SET
INCLUDE OF WORK KETERANGAN Kapasitas Rencana : 50 m BOD Masuk : 400 mg/liter SS masuk : 200 mg/liter Efisiensi pengolahan : 90-95 % BOD Keluar : 20 mg/liter SS Keluar : 20 mg/liter Mutu hasil olahan (efluent) Sesuai dengan Kep 58/MENLH/12/1995 Sistem Bio Filter - Metode Konventional Sistem kerja IPAL Semi Otomatis Kebutuhan Luas Lahan 35 m Konstruksi Concrete + Coating sesuai dokumen teknis Material : PVC Sheet Ketebalan : 0.15-0.23 mm Luas Kontak Spesifik : 30 - 35 m / m Diameter Lubang : 2 cm x 2 cm Berat Spesifik : 30 - 35 kg / m Porositas Rongga : 0.98 Injek chlor Automatic Water pump sensor detector sesuai dokumen teknis Rumah Alat Konstruksi Bangunan batu bata 2 x 2 meter sesuai dokumen teknis Rumah Ipal Konstruksi Tiang MS Canal Double, Atap Asbes sesuai dokumen teknis PVC 6", 4", 2", 1" Penyambungan pipa dengan saluran dari existing gedung dan bak septic tank Grease Trap Unit SS 304 Dimensi (p x l x t) 1 x 0.75 x 1 meter sesuai dokumen teknis Bar Screen SS 304 Dimensi (p x l x t) 1 x 0.75 x 1 meter sesuai dokumen teknis Submersible pump Type SS N.0520 / setara sesuai dokumen teknis Silent Blower Type HP 200, 210 watt, 220-240 volt, 20kpa (8 unit) sesuai dokumen teknis Diffuser Type coarse bubble, Dia 6" sesuai dokumen teknis Dosing Pump Pressure = 7 bar, kapasitas = 4.7 liter/jam (2 unit) sesuai dokumen teknis Tangki Kimia Fibre Tank sesuai dokumen teknis Mixer / Agitator Type vertical C1T 0.75, 0.75kW, Agitation shaft length 2200 mm, Dia. 45 mm (1 unit) sesuai dokumen teknis Centripugal Pump Head pump 9 meter, 125 watt, 220 volt (2 unit) sesuai dokumen teknis Panel Control Autonic komponen sesuai dokumen teknis PH Control Automatic control Water PH balance with chemical injection pump sesuai dokumen teknis Radar / pelampung Lokal sesuai dokumen teknis Filter Tank unit Fibre glass tank size 20" sesuai dokumen teknis Konstruksi concrete K-275 Detention time 1 jam Dimensi bak (p x l x t) 100 x 75 x 75 cm Konstruksi concrete K-275 Dimensi bak (p x l x t) 60 x 60 x 60 cm Konstruksi concrete K-275 Kapasitas Bak : 12 m Konstruksi concrete K-275 Detention time 30 menit Konstruksi concrete K-275 Detention time 30 menit Kapasitas Rencana : 50 m/Hari BOD Masuk : 400 mg/liter SS masuk : 200 mg/liter Waktu tinggal : 9 jam Volume Bak : 19 M Dimensi Bak : Lebar : 3 meter, Panjang : 3.2 m, Kedalaman : 2 m, Tinggi ruang bebas : 0.5 m Konstruksi concrete K-275 Kapasitas Rencana : 50 m/Hari BOD Masuk : 160 mg/liter Efisiensi pengolahan : 25 % BOD Keluar : 120 mg/liter Waktu tinggal : 2 jam Volume Bak : 4.5 M Bak Pengumpul Sumber Limbah : Kamar mandi, Ruang pencucian (Laundry), Ruang Gizi (kitchen), Lab, Ruang Poly, Ruang Pembilasan Radiologi Media tumbuh bakteri : Sarang Tawon Piping & aksesories, CO Bak netralisasi Bak Kontrol Bak Grease Trap Bak Equalisasi Bak Pengendapan awal URAIAN PEKERJAAN SAT SPESIFIKASI TEKNIS IPAL sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis Dimensi Bak : Lebar : 2 meter, Panjang : 1.25 m, Tinggi : 2 m, Tinggi ruang bebas : 20 cm Center Feeding Flow Process An aerob Reaktor System Konstruksi concrete K-275 BOD Masuk : 400 mg/liter Efisiensi pengolahan : 60 % BOD Keluar : 160 mg/liter Standar beban BOD per volume media 0.4-4.7 kg BOD/m.hari. Ditetapkan Beban BOD yang digunakan 2.5 k Beban BOD di dalam air limbah = 50 m/hari x 400 g/m = 20,000 g/hari = 20 kg/hari Volume media yang dibutuhkan = 20 kg/hari : 2.5 kg BOD/m.hari = 8 m Volume media = 70 % dari total volume reaktor Volume reaktor yang diperlukan = 10/7 x 8 m = 11.5 m Waktu tinggal reaktor Anaerob yang dibutuhkan = (11.5 m : 50 m/hari) x 24 jam/hari = 5.5 jam Dimensi bak : Lebar : 2 m, Panjang : 2.9 m, kedalaman air efektif : 2 m, Ruang bebas : 20 cm Kapasitas rencana : 50 m BOD Masuk : 120 mg/liter Efisiensi pengolahan : 60 % BOD Keluar : 48 mg/liter Ditetapkan beban BOD yang digunakan = 1.0 kg BOD/m.hari Beban BOD air limbah = 50 m/hari x 120 g/m = 6 kg/hari Volume media yang dibutuhkan = 6 kg/hari : 1.0 kg BOD/m.hari = 6 m Volume media = 60 % dari total volume reaktor Volume reaktor yang diperlukan = 10/6 x 6 m = 10 m Waktu tinggal reaktor zona Anoksik (anaerob) yang dibutuhkan = (10 m : 50 m/hari) x 24 jam/hari = 4.8 jam Dimensi bak yang dibutuhkan : Lebar : 2 m, Panjang : 2.5 m, Tinggi : 2 m, Ruang kosong : 20 cm Konstruksi concrete K-275 Kapasitas rencana : 50 m BOD Masuk : 48 mg/liter Ditetapkan beban BOD yang digunakan = 1.0 kg BOD/m.hari Beban BOD air limbah = 50 m/hari x 48 g/m = 2.4 kg/hari Jumlah BOD yang dihilangkan = 0.5 x 2.4 kg/hari = 1.2 kg/hari Volume media yang diperlukan = 1.2 kg/hari : 1.0 kg/m.hari = 1.2 m Volume media = 50 % dari total volume Reaktor Volume reaktor yang diperlukan = 10/5 x 1.2 m = 2.4 m Waktu tinggal aerob yang dibutuhkan = (2.4 m : 50 m/hari) x 24 jam/hari = 2.3 jam Dimensi bak yang dibutuhkan : Lebar : 2 m, Panjang : 3 m, Tinggi : 2 m, Ruang kosong : 20 cm Kebutuhan oksigen : Kebutuhan oksigen dalam reaktor aerob sebanding dengan jumlah BOD yang dihilangkan = 1.2 kg/hari Factor keamanan 1.4 Kebutuhan oksigen = 1.4 x 1.2 kg/hari = 1.7 kg/hari Temperatur udara rata-rata 28 C Berat udara pada suhu 28 C = 1.1725 kg/m Diasumsikan jumlah oksigen dalam udara sebesar 23.2 % Maka jumlah kebutuhan udara = 1.7 kg/hari : 1.1725 kg/m x 0.232 g O2/g udara = 6.25 m/hari Efisiensi difuser = 2.5 % Kebutuhan udara aktual = 6.25 m/hari : 0.025 = 250 m/hari = 0.250 m/menit Konstruksi Concrete K-275 Kapasitas rencana : 50 m 3 BOD masuk : 24 mg/liter Efisiensi Pengolahan : 5% BOD keluar : 22.8 mg/liter Waktu tinggal : 2 jam Volume bak : 4.2 m 3 Dimensi bak : Lebar : 2 m, Panjang : 1.2 m, Tinggi : 2 m, Ruang kosong : 20 cm Konstruksi Concrete K-275 Detention time 1 jam Volume bak : 2 m3 Kolam Biologi/Ikan Konstruksi batu bata sesuai dokumen teknis Bak Penampungan Air Bersih Dimensi bak (p x l x t) 2.5 x 2 x 1.5 meter sesuai dokumen teknis Water Proofing / coating Material Acrylic, fleksible sesuai dokumen teknis PEKERJAAN PEMASANGAN TRANSPORTASI IPAL Transportasi dari Bandung ke Lokasi Proyek EXCLUDE OF WORK Pekerjaan Sipil Pekerjaan Loading Tangki Pekerjaan Plumbing * Penyambungan pipa INLET dari gedung ke instalasii IPAL dan sesuai dokumen teknis Bak Pengendapan Akhir Bak Chlorine Bak Pengendapan awal Bak Reaktor Anaerob Biofilter zona anoksik (anaerob) Bak Reaktor Aerob/aerasi (2 unit) Dikerjakan / Dipersiapkan oleh Kontraktor Lain sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis sesuai dokumen teknis pipa OUTLET instalasi IPAL ke drainase kota * Penyambungan pipa Ventilasi dari instalasi IPAL ke samping gedung Penarikan kabel listrik Penarikan kabel listrik dari Main Power Switch ke Instalasi IPAL Pengisian Air Pengisian Air kedalam tangki untuk test kebocoran tangki , pemasangan & testing commissioning Dikerjakan / Dipersiapkan oleh Kontraktor Lain