Master List of Records 1

The document is a master list of procedure records for a quality management system. It contains 47 entries listing the name, code, revision number, and approval status of various procedures related to welding, non-destructive testing, inspection, quality audits, and other quality control and assurance topics. The procedures are approved and retained by the company's QA/QC department in both hard copy and soft copy formats.

Uploaded by

Anonymous i3lI9M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
499 views

Master List of Records 1

The document is a master list of procedure records for a quality management system. It contains 47 entries listing the name, code, revision number, and approval status of various procedures related to welding, non-destructive testing, inspection, quality audits, and other quality control and assurance topics. The procedures are approved and retained by the company's QA/QC department in both hard copy and soft copy formats.

Uploaded by

Anonymous i3lI9M
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc No.

QF 9001 04
Rev No. :
0
Page : 1 of 1
Date : 20/6/2013
DEPARTMENT: QA/QC
Hard Copy Soft Copy
1 Project Quality Plan No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
01
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
2 Protective Coating Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
02
REV 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
3 Welding and Welder Qualification Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
03
Rev 3
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
4 Weld Repair and buttering Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
04
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
5 Welding consumable Control Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
05
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
6 Weld Distortion Control Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
06
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
7
Equipment Instalation & Calibration
Procedure
No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
07
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
8 NDT Plan for Pipng and Structural work No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
08
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
9 Radiography Testing Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
09
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
10 Ultrasonic Testing Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
10
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
11 Magnetic Testing Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
11
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
12 Dye Penetrant Testing Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
12
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
13 Procedure for Presure Testing Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
13
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
14 Bolt tightening Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
14
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
15 HSE Manual No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
15
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept
Submited to CEIL for
Reviw and Approval
16
Procedure for Non Confermittee and
corrective action
No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
16
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
17 Quality Audit Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
17
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
18 PWHT Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
18
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
19 Inspection & Test Plan for E&I No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
19
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
20 Inspection & Test Plan for Piping No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
20
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
21 Inspection & Test Plan for Structure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
21
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
22 Leveling and Dimensional Control Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
22
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
Approved By
Location of the
Record
Revision Remarks
Retentio
n Period
Accessed
by
Record type
Sr. No. Name of the Record Record Code
MASTER LIST OF PROCEDURE RECORDS
Index
ed By

Doc No. QF 9001 04
Rev No. :
0
Page : 1 of 1
Date : 20/6/2013
DEPARTMENT: QA/QC
Hard Copy Soft Copy
Approved By
Location of the
Record
Revision Remarks
Retentio
n Period
Accessed
by
Record type
Sr. No. Name of the Record Record Code
MASTER LIST OF PROCEDURE RECORDS
Index
ed By

23 Master Document Register No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
23
Rev 1
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
24
Inspection & test plan for blasting and
painting
No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
24
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
25 Hardness Test Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
25
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
26 Insulation Procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
26
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
27
Procedure for Material Identification and
storage
No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
27
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
28 Procedure for Piping Fabrication & Erection No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
28
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
29
Procedure for Structural Fabrication &
Erection
No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
29
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
30 ITP For Insulation No Yes
1989/ONGC/HRD/AFCONS/PCTS/0
30
Rev 2
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
31 Final Document procedure No Yes
1989/ONGC/HRD/AFCONS/PCTS/Q
AC/32
Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
32 WPS PIPING( CS NACE) No Yes PCTS/AFCONS/PIPI/WPS-01 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
33 WPS PIPING( CS NACE) No Yes PCTS/AFCONS/PIPI/WPS-02 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
34 WPS PIPING( CU NIKEL) No Yes PCTS/AFCONS/PIPI/WPS-03 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
35 WPS PIPING( CS NACE) No Yes PCTS/AFCONS/PIPI/WPS-04 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
36
WPS PIPING( S S )
No Yes PCTS/AFCONS/PIPI/WPS-05 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
37
WPS PIPING( S S & CS )
No Yes PCTS/AFCONS/PIPI/WPS-06 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
38
WPS PIPING ( INCOLOGY 852)
No Yes PCTS/AFCONS/PIPI/WPS-07 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
39
WPS PIPING( DSS)
No Yes PCTS/AFCONS/PIPI/WPS-08 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
40
WPS PIPNG( DSS)
No Yes PCTS/AFCONS/PIPI/WPS-09 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept HOLD
41
WPS (STRUCTURE)
No Yes PCTS/AFCONS/STRI/WPS-11 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept APPROVED BY CEIL
42
WPS (STRUCTURE)
No Yes PCTS/AFCONS/STRI/WPS-12 Rev 0
PCTS
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept Rejected by CEIL;
43 PROJECT QUALITY PLAN No Yes 1989-ATTC-PQP-QAC-0001 Rev 0
Afcons
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept
Approved
44 Inspection And Test Procedure No Yes F3211-0095 Rev 0
KHI
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept
COMMENTED BY
RINA
45 Inspection Shedule And Status No Yes F3211-0097.01 Rev 0
KHI
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept Approved by Rina
46 Painting Procedure No Yes F3211-9493.06 Rev 0
KHI
AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept
COMMENTED BY
RINA
47 Welding Procedure (Compressor) No Yes F3211-1102 Rev 0 KHI AFCONS/TPI/CA Afcons DCC 3 Year QA/QC Dept Approved by Rina