11.earthen Shoulder As Compacted in Position

- The document appears to be a record of site measurements for work completed on a road rehabilitation project in Northern Roads by contractor CATIC/MAGA/A-35. It includes details of earthen shoulder construction from chainages 30+000 to 31+000 on road A-35. - The record provides information on the length, area, volume, percentage completed and total quantities of work done on the left and right shoulders at regular chainage intervals along the section of road. - The total quantity of work completed as per the record is 460.80 cubic meters of earthen shoulder construction from 30+000 to 31+000 chainage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

11.earthen Shoulder As Compacted in Position

- The document appears to be a record of site measurements for work completed on a road rehabilitation project in Northern Roads by contractor CATIC/MAGA/A-35. It includes details of earthen shoulder construction from chainages 30+000 to 31+000 on road A-35. - The record provides information on the length, area, volume, percentage completed and total quantities of work done on the left and right shoulders at regular chainage intervals along the section of road. - The total quantity of work completed as per the record is 460.80 cubic meters of earthen shoulder construction from 30+000 to 31+000 chainage.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EMPLOYER

Road Development Authority

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD

CONTRACTOR
CATIC/MAGA/A-35

(To be Completed Daily )


Contract No : RDA/RNIP/PRP1/C11

Bill Item

: 4.3.6

Road No

: A-35

Chainage

: 30+000 ~ 30+500

Description : Earthen shoulder as compacted in


position
Reference : 304(2)

Sheet No

Date

: 21/12/2013

Final/4.3.6/CS/S1/01
Chainage

Area (m2)

Length (m)
LHS

RHS

30+000

LHS

Volume (m3)

RHS

0.27

0.61

LHS

Percentage Quantity

RHS

LHS

RHS

Total Quantity

30+020

20.00

20.00

0.27

0.98

5.40

15.90

100%

100%

21.30

30+040

20.00

20.00

0.27

0.98

5.40

19.60

100%

100%

25.00

30+060

20.00

20.00

0.27

0.98

5.40

19.60

100%

100%

25.00

30+080

20.00

20.00

0.27

0.98

5.40

19.60

100%

100%

25.00

30+100

20.00

20.00

0.27

0.27

5.40

12.50

100%

100%

17.90

0.27

5.40

5.40

100%

100%

10.80

30+120

20.00

20.00

0.27

30+140

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+160

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+180

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+200

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+220

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+240

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+260

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+280

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+300

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

0.27

5.40

5.40

100%

100%

10.80

30+320

20.00

20.00

0.27

30+340

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+360

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+380

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+400

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+420

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+440

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+460

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+480

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+500

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

Total Qty.

330.20

Previous Paid (IPC 23)

270.00

Previous Paid (SAC)


Balance Qty.
PREPARED BY
SUB CONTRACTOR'S QUANTITY
SURVEYOR

60.20
CHECKED BY

=
RECOMMENDED BY

CONTRACTOR'S
QUANTITY SURVEYOR

CONTRACTOR'S
PROJECT MANAGER

0.00

EMPLOYER
Road Development Authority

NORTHERN ROADS REHABILITATION PROJECT


CONSULTANT
Central Engineering Consultancy Bureau
AGREED SITE MEASUREMENT RECORD

CONTRACTOR
CATIC/MAGA/A-35

(To be Completed Daily )


Contract No : RDA/RNIP/PRP1/C11

Bill Item

: 4.3.6

Road No

: A-35

Chainage

: 30+500 ~ 31+000

Description : Earthen shoulder as compacted in


position
Reference : 304(2)

Sheet No

Date

: 21/12/2013

Final/4.3.6/CS/S1/02
Chainage

Area (m2)

Length (m)
LHS

RHS

30+500

LHS

Volume (m3)

RHS

0.27

0.27

LHS

Percentage Quantity

RHS

LHS

RHS

Total Quantity

30+520

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+540

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+560

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+580

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+600

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

0.27

5.40

5.40

100%

100%

10.80

30+620

20.00

20.00

0.27

30+640

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+648

8.00

8.00

0.27

0.27

2.16

2.16

100%

100%

4.32

30+660

12.00

12.00

0.27

0.27

3.24

3.24

100%

100%

6.48

30+680

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+700

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+720

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

30+740

20.00

20.00

0.27

0.27

5.40

5.40

100%

100%

10.80

Total Qty.

129.60

Previous Paid (IPC 23)

299.70

Previous Paid (SAC)


Balance Qty.
PREPARED BY
SUB CONTRACTOR'S QUANTITY
SURVEYOR

(299.70)
CHECKED BY

=
RECOMMENDED BY

CONTRACTOR'S
QUANTITY SURVEYOR

CONTRACTOR'S
PROJECT MANAGER

129.60