Gantt Chart

This document outlines the activities and timeline for a 12-week research project. It includes searching for thesis samples and organizing work in the first week, followed by literature reviews, formulating statements and hypotheses, selecting a research design, building and validating data collection instruments, collecting and analyzing data, and finally concluding with possible solutions in weeks 11-12.

Uploaded by

Camii Martinez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views1 page

Gantt Chart

This document outlines the activities and timeline for a 12-week research project. It includes searching for thesis samples and organizing work in the first week, followed by literature reviews, formulating statements and hypotheses, selecting a research design, building and validating data collection instruments, collecting and analyzing data, and finally concluding with possible solutions in weeks 11-12.

Uploaded by

Camii Martinez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ACTIVITIES Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12

Search for thesis sample, organization


Literature Review
Reformulate statement
Hypothesis
Select research design
Literature Review
Build data collection instruments
Validation of data collection instruments
Application of data collection
Data analysis
Conclusions
Possible solutions
GANTT CHART