List of Approved Boiler Repairer/ Erector & Steam/ Feed Pipe Fabricator/ Erector Under Provision of Reg 392 of Ibr-1950
List of Approved Boiler Repairer/ Erector & Steam/ Feed Pipe Fabricator/ Erector Under Provision of Reg 392 of Ibr-1950
FIRM'S
NAME & ADD
APPLICATION
RECEIVED
ON
24/10/2005
APPROVAL CATEGORY
GIVAN ON
11/11/2005 Class-1
EXPIRY
DATE
CATEGORY
WORKS & W.P
8/11/2007
20/12/2005
22/12/2005
Class-1
21/12/2007
25/11/2005
19/10/2007
15/10/2009
22/12/2005
22/12/2007
22/02/2010
Class-1
Class-1
Class-1
22/12/2009 B.R.&E.
22/12/2009 S.F.P.F.E.
22/12/2011 WP>40kg/cm2
<125kg/cm2
2/1/2006
22/1/2008
31/12/2009
10/01/2006
05/02/2008
26/06/2010
Class-1
Class-1
Class-1
11/1/2008
11/1/2010
11/1/2012
27/12/2005
16/01/06
Class-1
15/01/2008
10/01/2006
27/11/2007
23/12/2009
21/01/2006
1/8/2008
7/1/2010
Class-1
Class-1
Class-1
20/01/2008 B.R.&E.
20/01/2010 S.F.P.F.E.
20/01/2012 WP>40kg/cm2
<125kg/cm2
19/01/2006
16/02/2006
Class-1
15/02/2008
B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
REMARKS
10/2/2006 24/02/2006
Class-1
24/02/2008
2/3/2006
16/04/2008
15/03/2010
17/03/2006
22/04/2008
28/04/2010
Class-1
Class-1
Class-1
26/05/2008 B.R.&E.
26/05/2010 S.F.P.F.E.
26/05/2012 WP>40kg/cm2
<125kg/cm2
23/12/2005
20/03/2006
Class-1
20/03/2008
10/02/2006
6/2/2008
25/11/2009
20/03/2006
26/03/2008
31/03/2010
Class-1
20/03/2008 B.R.&E.
20/03/2010 S.F.P.F.E.
20/03/2010 WP>40kg/cm2
<125kg/cm2
12
7/3/2006
7/3/2008
16/03/2010
19/03/2006
8/4/2008
15/06/2010
Class-1
Class-1
Class-1
19/03/2008 B.R.&E.
19/03/2010 S.F.P.F.E.
19/03/2010 WP>40kg/cm2
<125kg/cm2
13
14
6/3/2006
10/02/2011
9/3/2011
14/04/2006
18/04/2006
10
11
15
1/4/2006
12/4/2006 Class-1
12/4/2006
Class-1
14/04/2008 B.R.&E.
S.F.P.F.E.
11/03/2013 WP17.5kg/cm2
18/04/2006
Class-1
17/04/2008
6/3/2006
17/04/2008
13/03/2010
20/04/2006
20/04/2008
20/04/2010
Class-II
20/04/2008 B.R.&E.
20/04/2010 S.F.P.F.E.
20/04/2012 WP>17.5kg/cm2
40kg/cm2
13/01/2006
14/01/2006
Class-1
23/01/2008
4/7/2011
17
18
1/04/2006
16/02/2008
8/3/2010
21/04/2003
25/03/2008
13/04/2010
Class-1
Class-1
Class-1
20/04/2008 B.R.&E.
20/04/2010 S.F.P.F.E.
20/04/2012 WP>40kg/cm2
100kg/cm2
25/04/2006
25/04/2006
Class-1
24/04/2008
04/06/2008
11/05/2010
12/06/2008
26/05/2010
Sp. Class
Sp. Class
11/06/2010
11/06/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Ladko Enterprises.
1, Natvar Appartment, 9 Bakul Soc; No2.
Rescourse Cercule (West).
Vadodara.-390007
25/04/2006
19/03/2008
25/04/2006
04/06/2008
11/05/2010
12/06/2008
26/05/2010
Class-1
Class-1
Sp. Class
Sp. Class
24/04/2008 B.R.&E.
24/04/2010 S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
11/06/2010
11/06/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
20
24/04/2006
27/03/2008
8/3/2010
24/05/2006
17/04/2008
30/04/2010
Class-1
Class-1
Class-1
28/08/2008 B.R.&E.
28/04/2010 S.F.P.F.E.
28/04/2012 WP>40kg/cm2
125kg/cm2
21
31/05/2006
30/05/2006
Class-1
31/05/2008
22
7/12/2006 20/04/2006
Class-II
20/04/2008 B.R.&E.
20/04/2010 S.F.P.F.E.
WP>17.5kg/cm2
40kg/cm2
13/05/2008
01/06/2010
Class-II
12/05/2010 B.R.&E.
12/05/2012 S.F.P.F.E.
WP>17.5kg/cm2
40kg/cm2
02/05/2008
17/02/2010
23
24
25
24/04/2006
02/01/2009
11/03/2010
27/04/2006
02/01/2009
27/04/2010
4/5/2006
25/05/2006
6/6/2008
13/04/2010
Class-1
1/6/2006 Class-1
20/04/2008 B.R.&E.
20/04/2010 S.F.P.F.E.
20/04/2012 WP>40kg/cm2
125kg/cm2
1/6/2008
5/6/2006
19/06/2008
27/04/2010
Class-1
Class-1
Class-1
5/6/2008
5/6/2010
5/6/2012
B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
26
Shrinath Febrication.
4/2/2006
D-90, Rushabhdev Nagar, Adinath Nagar, 2/6/2008
Odhav, A'bad.19/5/201
7/6/2006
14/08/2008
3/6/2010
Class-II
Class-II
6/6/2008
6/6/2010
6/6/2012
B.R.&E.
S.F.P.F.E.
WP>17.5kg/cm2
40kg/cm2
27
6/06/2006
14/08/2008
9/6/2010
Class-1
Class-1
Class-1
5/6/2008
5/6/2010
5/6/2012
B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
28
Ambica Engineering
3-327, G.E.B. Colony.,
Post.-Ukai, Dist.-Surat.-394680
Ompuri Engineering Works.
3 Patel Estate, Nr.Ambica Cinema,
Bapunagar, A'bad.
16/05/2006
12/06/2008
5/6/2010
17/06/2006
19/06/2008
21/06/2010
Class-II
Class-II
Class-II
6/6/2008
B.R.&E.
16/06/2010 S.F.P.F.E.
16/06/2012 WP>17.5kg/cm2
40kg/cm2
30
2/6/2006
7/3/2008
2/3/2010
14/06/2006
18/03/2008
8/4/2010
Class-1
Class-1
Class-1
31/03/2008 B.R.&E.
31/03/2010 S.F.P.F.E.
31/03/2012 WP>40kg/cm2
125kg/cm2
31
12/06/2006
12/05/2008
16/06/2010
16/06/2006
27/05/2008
22/06/2010
Class-1
Class-1
Class-1
16/06/2008 B.R.&E.
16/06/2010 S.F.P.F.E.
16/06/2012 WP>40kg/cm2
125kg/cm2
29
20/05/2006
17/07/2008
19/05/2010
3/6/2006
6/6/2006 Class-1
5/6/2008
32
30/06/2006
20/04/2008
30/04/2010
30/06/2006
12/05/2008
20/06/2010
Class-1
Class-1
Class-1
30/06/2008 B.R.&E.
30/06/2010 S.F.P.F.E.
30/06/2012 WP>40kg/cm2
125kg/cm2
33
26/12/2006
8/5/2008
13/05/2008
30/06/2006
20/06/2008
Class-1
Class-1
Class-1
30/06/2008 B.R.&E.
30/06/2010 S.F.P.F.E.
30/06/2012 WP>40kg/cm2
125kg/cm2
34
5/7/2006
20/06/2008
22/05/2010
17/07/2006
20/06/2010
29/06/2010
Class-1
Class-1
Class-1
9/7/2008
9/7/2010
9/7/2012
35
1/7/2006
12/05/2008
26/04/2010
29/07/2006
20/07/2008
26/08/2010
Class-II
Class-II
Class-II
29/07/2008 B.R.&E.
29/07/2010 S.F.P.F.E.
29/07/2012 WP>17.5kg/cm2
40kg/cm2
36
37
38
1/7/2006
Class-II
B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
19/07/2006
19/07/2006
Class-1
18/07/2008
2/6/2006
18/07/2008
21/04/2010
14/07/2006
22/08/2008
28/06/2010
Class-1
Class-1
Class-1
14/06/2008 B.R.&E.
14/06/2010 S.F.P.F.E.
14/06/2012 WP>40kg/cm2
125kg/cm2
39
2/5/2006
23/07/2008
9/7/2010
26/07/2006
26/08/2008
14/10/2010
Class-1
Class-1
Class-1
25/072008 B.R.&E.
25/07/2010 S.F.P.F.E.
20/07/2012 WP>40kg/cm2
125kg/cm2
40
5/7/2006
30/06/2008
7/7/2010
27/07/2006
07/08/2008
09/08/2010
Class-1
Class-1
Class-1
28/07/2008 B.R.&E.
28/07/2010 S.F.P.F.E.
28/07/2012 WP>40kg/cm2
125kg/cm2
41
27/07/2006
14/07/2008
20/05/2010
42
27/0/2006
28/06/2006
09/07/2008
16/04/2010
28/08/2006
18/08/2008
15/08/2010
Class-II
Class-II
Class-II
31/08/2008 B.R.&E.
31/08/2010 S.F.P.F.E.
31/08/2012 WP>17.5kg/cm2
40kg/cm2
44
22/09/2006
04/08/2008
17/08/2010
11/10/2006
12/09/2008
28/12/2010
Class-1
Class-1
Class-1
10/10/2008 B.R.&E.
10/10/2010 S.F.P.F.E.
10/10/2012 WP>40kg/cm2
125kg/cm2
45
17/07/2006
15/04/2008
4/5/2010
17/10/2006
13/06/2008
26/05/2010
Class-1
Class-1
Class-1
30/05/2008 B.R.&E.
30/05/2010 S.F.P.F.E.
30/05/2012 WP>40kg/cm2
125kg/cm2
46
6/9/2006
28/11/2008
6/10/2010
17/10/2006
28/11/2008
18/12/2010
Class-1
Class-1
Class-1
25/10/2008 B.R.&E.
25/10/2010 S.F.P.F.E.
25/10/2012 WP>40kg/cm2
125kg/cm2
47
26/07/2006
10/10/2008
28/09/2010
27/10/2006
20/10/2008
07/10/2010
Class-II
Class-II
Class-II
09/10/2008 B.R.&E.
09/10/2010 S.F.P.F.E.
09/10/2012 WP>17.5kg/cm2
40kg/cm2
48
Concurd Engineers
2402/1, GIDC, Ankaleshwar,
Dist.-Bharuch.
15/06/2006
2/12/2008
21/10/2010
28/09/2006
12/01/2009
08/03/2011
Class-1
Class-1
Class-1
25/10/2008 B.R.&E.
25/10/2010 S.F.P.F.E.
25/10/2012 WP>40kg/cm2
125kg/cm2
49
05/09/2006
20/11/2008
17/10/2006
21/11/2008
Class-1
Class-1
05/11/2008 B.R.&E.
05/11/2010 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
43
31/07/2010
14/07/2008
01/06/2010
Class-II
Class-II
Class-II
4/8/2006 Class-1
31/07/2008 B.R.&E.
31/07/2010 S.F.P.F.E.
30/07/2012 WP>40kg/cm2
125kg/cm2
5/8/2008
50
24/08/2006
20/10/2008
06/10/2010
13/11/2006
11/08/2008
10/11/2010
Class-II
Class-II
Class-II
20/12/2008 B.R.&E.
20/12/2010 S.F.P.F.E.
20/12/2012 WP>17.5kg/cm2
40kg/cm2
51
01/09/2006
20/11/2008
28/11/2006
21/11/2008
Sp. Class
Sp. Class
52
A.M.Erectors.
32, Sindhi Bajar, Nr.New Power House,
Sabarmati, A'bad.-380005
06/11/2006
19/05/2008
04/06/2010
30/11/2006
26/06/2008
03/07/2010
53
27/09/2006
23/10/2008
06/12/2010
1/12/2006
2/12/2008
6/12/2010
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-1
Class-1
28/11/2008
28/11/2010 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
18/07/2008
18/07/2008 B.R.&E.
18/07/2012 S.F.P.F.E.
WP>125kg/cm2
1/12/2008 B.R.&E.
1/12/2010 S.F.P.F.E.
1/12/2012 WP>40kg/cm2
125kg/cm2
54
4/11/2006 /
3/05/2007
19/05/2007
Sp. Class
17/05/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
55
Chetargy Engineering.
204, Arpan Complex, Nr.Hanumanji
Temple, Nizampura, Vadodra-390002
C/o RIL Hazira Site.
02/12/2006
11/11/2008
15/11/2010
12/12/2006
05/12/2008
14/12/2010
Class-1
Class-1
Class-1
23/11/2008 B.R.&E.
23/11/2010 S.F.P.F.E.
23/11/2012 WP>40kg/cm2
125kg/cm2
56
Univarsal Erectors
147/L, GIDC, Phase-II,
Bharuch.
13/10/2006
02/12/2008
29/12/2010
08/12/2006
15/12/2008
29/01/2011
57
Himanshu Engineers
Mavjibhai Industrail Estate,
Nr.Saynemad-Colony, P.O. Atul,
Dist.-Valsad.-396020
15/06/2006
30/12/2008
08/02/2011
05/01/2007
02/02/2009
15/04/2011
58
02/01/2007
23/12/2008
09/02/2011
06/01/2007
23/01/2009
10/03/2011
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-1
Class-1
Sp. Class
Sp. Class
Sp. Class
06/12/2008 B.R.&E.
06/12/2010 S.F.P.F.E.
06/12/2012 WP>40kg/cm2
125kg/cm2
31/01/2009 B.R.&E.
31/01/2011 S.F.P.F.E.
31/01/2013 WP>40kg/cm2
125kg/cm2
04/01/2009 B.R.&E.
04/01/2011 S.F.P.F.E.
04/01/2013 WP>40kg/cm2
125kg/cm2
59
27/09/2006
60
10/01/2007
20/03/2009
04/02/2011
19/01/2007
27/03/2009
22/02/2011
30/05/2007
28/04/2009
29/04/2011
12/07/2007
03/06/2009
17/06/2011
62
14/12/2010
11/12/2006
29/12/2008
27/07/2011
24/01/2007
02/02/2009
Class-1
Class-1
Class-1
21/01/2009 B.R.&E.
21/01/2011 S.F.P.F.E.
21/01/2013 WP>40kg/cm2
125kg/cm2
63
20/12/2006
15/12/2008
07/12/2010
21/02/2007
15/12/2008
10/12/2010
Class-1
Class-1
Class-1
28/12/2008 B.R.&E.
28/12/2010 S.F.P.F.E.
28/12/2012 WP>40kg/cm2
125kg/cm2
64
Dev Counsaltant,
6, Mayur Nagar Soc; Drivin Road,
Memnagar, A'bad.-380052
21/02/2007
11/02/2009
21/02/2011
05/03/2007
24/02/2009
22/03/2011
Class-1
Class-1
Class-1
09/03/2009 B.R.&E.
09/03/2011 S.F.P.F.E.
09/03/2013 WP>40kg/cm2
125kg/cm2
65
13/02/2007
24/02/2009
07/02/2011
06/03/2007
02/03/2009
14/03/2011
Class-1
Class-1
Class-1
05/03/2009 B.R.&E.
05/03/2011 S.F.P.F.E.
05/03/2013 WP>40kg/cm2
125kg/cm2
66
9/4/2007 Class-1
8/4/2009 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
61
Sp. Class
12/5/2006
7/1/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
Sp. Class
Sp. Class
Sp. Class
18/01/2009
26/03/2011 B.R.&E.
26/03/2013 S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
Sp. Class
24/06/2009
24/06/2011 B.R.&E.
24/06/2013 S.F.P.F.E.
WP>125kg/cm2
67
Ragmet Engineers(Mumbai)
Site:- Relaince Industrail Ltd.
Motikhavdi, Dist.-Jamnagar.
25/04/2007
24/04/2009
27/04/2007
24/04/2009
68
30/04/2007
16/04/2009
20/04/2011
07/05/2007
16/04/2009
20/04/2011
69
09/05/2007
23/04/2009
18/05/2007
23/04/2007
70
30/04/2007
25/03/2009
19/04/2011
19/05/2007
28/04/2009
19/04/2011
71
Swstik Engineers
17, Syamsundar Market,
Nr.S.T. Workshop, Naroda Road,
A'bad.-382345
21/02/2007
17/04/2009
09/05/2011
22/05/2007
24/04/2009
21/05/2011
Class-II
Class-II
Class-II
20/05/2009 B.R.&E.
20/05/2011 S.F.P.F.E.
20/05/2013 WP>17.5kg/cm2
40kg/cm2
72
4/5/2007 25/05/2007
Class-1
22/05/2009 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
High-Tech Engineers
40, Shantiniketan Soc; Sumul DeiryRoad, Surat. Site:- L&T Ltd.
Hajira, Dist.- Surat.
22/09/2008
05/11/2009
04/10/2010
07/11/2008
10/11/2009
18/10/2010
Class-1
Class-1
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-1
Sp. Class
Sp. Class
Sp. Class
06/05/2009
06/05/2011 B.R.&E.
06/05/2013 S.F.P.F.E.
WP>125kg/cm2
17/05/2009 B.R.&E.
17/05/2011 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
18/05/2009
18/05/2011 B.R.&E.
18/05/2013 S.F.P.F.E.
WP>125kg/cm2
06/11/2010
Sp. Class
Sp. Class
07/05/2007
16/07/2009
26/04/2009 B.R.&E.
26/04/2011 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
05/06/2007
16/07/2009
B.R.&E.
06/11/2012 S.F.P.F.E.
WP>125kg/cm2
03/06/2009 S.F.P.F.E
03/06/2011 WP>125kg/cm2
Sp. Class
Sp. Class
74
75
11/6/2007
12/6/2007
14/06/2007
76
22/06/2007
16/06/2009
27/06/2011
05/07/2007
02/07/2009
27/06/2011
77
05/06/2007
15/06/2009
27/06/2011
05/07/2007
02/07/2009
27/06/2011
78
High-Tech Engineers
F-68 & F-53, MIDC, Ahemadnagar,
(Maharastra).
Site:- Sahakari Khand Uddhyog Mandli
Ltd.,Gandevi, Dist:-Navsari.
28/06/2007
19/06/2009
25/05/2011
07/07/2007
29/07/2009
26/07/2011
79
05/07/2007
11/06/2009
11/07/2007
09/07/2009
12/07/2007
11/06/2009
04/05/2011
18/07/2007
15/07/2009
04/07/2011
80
Sp. Class
12/6/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
Sp. Class
28/06/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
30/06/2007
Class-1
Class-1
Class-1
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-1
Class-1
03/07/2009 B.R.&E.
03/07/2011 S.F.P.F.E.
03/07/2013 WP>40kg/cm2
125kg/cm2
04/07/2009
04/07/2011 B.R.&E.
04/07/2013 S.F.P.F.E.
WP>125kg/cm2
06/07/2009 B.R.&E.
06/07/2011 S.F.P.F.E.
06/07/2013 WP>40kg/cm2
125kg/cm2
Sp. Class
Sp. Class
Sp. Class
09/07/2009
09/07/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
Sp. Class
1707/2009
17/07/2011 B.R.&E.
17/07/2013 S.F.P.F.E.
WP>125kg/cm2
81
Skywin Erectors.
103, Krishnanand, Opp.Mahalaxmi Soc;
Paldi, A'bad.-380007
18/07/2007
23/07/2007
04/07/2011
31/07/2007
17/07/2009
15/07/2011
82
13/07/2007
24/07/2007
83
02/06/2006
29/06/2007
25/06/2009
25/07/2007
23/07/2009
84
28/06/2007
02/07/2009
14/06/2011
24/07/2007
16/07/2009
15/07/2011
85
17/07/2007
23/04/2009
21/06/2011
24/07/2007
21/07/2009
21/06/2011
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-1
Class-1
86
11/7/2007 25/07/2007
Sp. Class
87
27/09/2006
18/07/2009
25/07/2007
07/08/2009
Sp. Class
Sp. Class
Sp. Class
Class-1
Class-III
Class-II
Class-II
30/07/2009
30/07/2011 B.R.&E.
30/07/2013 S.F.P.F.E.
WP>125kg/cm2
20/07/2009 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
22/07/2009 B.R.&E.
22/07/2011 S.F.P.F.E
17.5kg/cm2
23/07/2009
23/07/2011 B.R.&E.
23/07/2013 S.F.P.F.E.
WP>125kg/cm2
23/07/2009 B.R.&E.
23/07/2011 S.F.P.F.E.
23/07/2013 WP>40kg/cm2
125kg/cm2
24/07/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
24/07/2009 B.R.&E.
24/07/2011 S.F.P.F.E.
WP>17.5kg/cm2
40kg/cm2
88
13/40/2007
25/06/2009
31/07/2007
10/08/2009
89
90
02/11/2006
03/10/2008
11/10/2010
01/08/2007
13/10/2008
29/06/2010
Ambica Engineering.
Ram-Krushna Soc; Chhinja Road,
Maroli Bazar-396436, Ta-Jalalpor,
Dist:- Navsari
20/07/2007
26/06/2009
20/05/2011
02/08/2007
22/07/2009
29/06/2011
92
K.I.P. Enterprises
Plot No.-24A, Sector-10, PCNV
Pradhikaran. Nr.Times Of Indai,
Bhosari, Puna:-411026.
Site:-Shree Khedut Sahakari KhandUddhyog Mandali Ltd.
Bardoli, Dist:-Surat.
31/07/2007
03/07/2009
10/08/2007
10/08/2009
93
Progress Febricators,
Vijay Rubber Compound,
Nr.S.B.I. Tawadipura, Shahibag,
A'bad.
26/07/2007
15/07/2009
17/08/2007
04/08/2009
07/07/2007
24/07/2009
13/08/2010
91
94
11/7/2007
Class-II
Class-II
2/8/2007 Class-1
18/08/2007
07/08/2009
16/08/2010
24/07/2009 B.R.&E.
24/07/2011 S.F.P.F.E.
WP>17.5kg/cm2
40kg/cm2
31/07/2009 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
Sp. Class
Sp. Class
Sp. Class
12/11/2008
12/11/2010 B.R.&E.
12/11/2012 S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
Sp. Class
01/08/2009
01/08/2011 B.R.&E.
01/08/2013 S.F.P.F.E.
WP>125kg/cm2
Class-1
Class-1
09/08/2009 B.R.&E.
09/08/2011 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
Sp. Class
Sp. Class
16/08/2009
16/08/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
----
17/08/2009
17/08/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
95
27/07/2007
11/08/2009
13/08/2010
21/07/2011
21/08/2007
17/08/2009
16/08/2010
29/07/2011
14/08/2007
04/07/2009
11/09/2007
11/08/2009
20/07/2007
20/08/2009
98
14/08/2007
13/07/2009
12/09/2007
12/08/2009
99
18/11/2006
11/09/2009
25/10/2007
14/10/2009
01/09/2007
09/09/2009
18/10/2007
09/11/2009
96
97
Sp. Class
Sp. Class
20/08/2009
20/08/2011 B.R.&E.
17/08/2013 S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
26/08/2009
26/08/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
04/09/2009
04/09/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
05/09/2007
20/08/2009
Class-1
Class-1
Class-II
Class-II
Sp. Class
Sp. Class
11/10/2007 18/10/2007
11/09/2009 B.R.&E.
11/09/2011 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
17/10/2009
17/10/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
17/10/2009
17/10/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
17/10/2009 B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
Sp. Class
16/06/2007
09/10/2009
08/11/2007
09/10/2009
24/10/2007
14/10/2009
20/11/2007
25/11/2009
16/11/2007
17/11/2009
22/11/2007
17/11/2009
15/10/2007
14/10/2009
Sp. Class
Sp. Class
Class-1
Class-1
Sp. Class
Sp. Class
Sp. Class
Sp. Class
26/11/2009
26/11/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
1/12/2007
30/11/2009
Sp. Class
13/08/2007
10/08/2007
01/12/2009
18/11/2009 B.R.&E.
18/11/2011 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
21/11/2009
21/11/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
27/11/2007
01/12/2009
11/10/2007
08/11/2009
08/11/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
13/12/2007
Class-II
17/12/2007
23/12/2009
Sp. Class
Sp. Class
B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
12/12/2009 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
16/12/2009
16/12/2011 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
29/12/2007
19/12/2009
05/12/2007
05/11/2009
15/11/2007
17/01/2008
30/01/2008
15/01/2010
17/01/2008
22/01/2010
05/02/2008
28/01/2010
07/01/2008
08/01/2010
Sp. Class
Sp. Class
03/01/2010
03/01/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
06/01/2010
06/01/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
07/01/2008
11/03/2010
4/3/2008
Class-1
22/01/2008
22/01/2010 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
100kg/cm2
22/01/2010
Sp. Class
B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
Sp. Class
Sp. Class
03/02/2010
03/02/2013 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
12/02/2010
12/02/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
15/02/2010
15/02/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
04/02/2008
02/02/2010
13/02/2008
11/02/2010
18/02/2008
01/02/2010
01/10/2007
25/01/2010
12/03/2008
06/03/2010
Class-1
Class-1
11/03/2010 B.R.&E.
11/03/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
12/03/2008
22/09/2010
15/03/2008
22/09/2010
Class-1
Class-1
13/03/2010 B.R.&E.
13/03/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
22/01/2008
15/05/2010
18/03/2008
15/05/2010
18/02/2008
09/04/2010
13/02/2008
03/04/2010
10/04/2008
09/04/2010
25/02/2008
06/02/2010
08/04/2008
11/05/2010
29/09/2007
24/06/2008
Sp. Class
Sp. Class
17/03/2010
17/03/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
18/03/2010
18/03/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
19/03/2008
09/04/2010
Class-1
Class-1
Class-II
Class-II
Class-II
09/04/2010 B.R.&E.
09/04/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
20/04/2010 B.R.&E.
20/04/2012 S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
22/04/2010 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
21/04/2008
22/03/2010
01/05/2008
16/04/2010
01/05/2008
15/03/2010
02/05/2008
30/04/2010
29/04/2008
16/04/2010
22/04/2008
23/04/2010
08/05/2008
15/03/2010
16/04/2008
22/05/2010
21/04/2008
01/07/2010
Class-1
Class-1
Sp. Class
Sp. Class
01/05/2010
01/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
01/05/2010
01/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
11/05/2010
11/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
20/05/2010
20/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
20/05/2010
20/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
02/05/2008
29/04/2010
12/05/2008
27/04/2010
21/05/2008
30/04/2010
21/05/2008
09/08/2010
21/05/2008
12/07/2010
24/08/2010 B.R.&E.
24/08/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
Class-1
Class-1
20/05/2010
20/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
06/05/2008
23/04/2010
26/05/2008
11/05/2010
Sp. Class
Sp. Class
22/05/2010
22/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
11/04/2008
03/05/2010
Sp. Class
Sp. Class
26/05/2010
26/05/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
03/06/2008
27/05/2010
07/06/2008
13/08/2010
Class-1
Class-1
04/06/2010 B.R.&E.
04/06/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
19/05/2008
16/04/2010
12/06/2008
18/05/2010
Class-1
Class-1
11/06/2010 B.R.&E.
11/06/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
23/04/2008
28/05/2010
17/06/2008
22/06/2010
Class-1
Class-1
16/06/2010 B.R.&E.
16/06/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
19/06/2008
27/06/2008
17/06/2008
03/07/2010
05/07/2008
29/10/2010
28/05/2008
03/05/2010
26/06/2010
Sp. Class
B.R.&E.
S.F.P.F.E.
WP>100kg/cm2
Sp. Class
Sp. Class
04/07/2010
04/07/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
Sp. Class
13/07/2010
13/07/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
07/07/2008
08/07/2010
14/07/2008
29/10/2010
18/08/2008
07/10/2010
02/09/2008
22/10/2010
Class-1
Class-1
31/08/2010 B.R.&E.
31/08/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
16/08/2008
21/10/2008
Class-II
20/10/2010 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
29/09/2008
17/10/2008
06/10/2008
14/09/2010
08/10/2008
18/09/2010
07/11/2008
13/10/2010
Class-1
Class-1
05/11/2010 B.R.&E.
05/11/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
02/09/2008
18/10/2010
15/11/2008
22/10/2010
Class-1
Class-1
14/11/2010 B.R.&E.
14/10/2012 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
06/09/2008
10/09/2008
25/11/2008
25/11/2008
Class-1
23/10/2008
05/01/2010
Sp. Class
Sp. Class
Class-1
16/10/2010 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
21/10/2010
21/10/2012 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
1/1/2011 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
26/08/2008
27/11/2008
16/12/2008
27/12/2010
2/1/2009 Class-II
12/01/2009
03/01/2011
Sp. Class
Sp. Class
12/1/2009 19/01/2009
Class-1
13/01/2009
19/02/2011
20/01/2009
13/04/2011
20/01/2009
20/01/2009
17/10/2008
Class-1
Class-1
Class-1
2/2/2009
Class-1
1/1/2011 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
11/01/2011
11/01/2013 B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
15/01/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
19/01/2011 B.R.&E.
19/01/2013 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
19/01/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
1/2/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
20/03/2009
06/04/2011
23/03/2009
06/04/2011
27/05/2009
01/06/2009
17/06/2009
17/08/2009
21/08/2009
21/08/2009
27/08/2009
Class-1
Class-1
Class-1
7/9/2009
Class-1
4/9/2009 19/09/2009
Class-1
25/09/2009
17/09/2009
30/09/2009
16/06/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
20/08/2011
Sp. Class
22/03/2011 B.R.&E.
22/03/2013 S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
Class-II
1/10/2009
Class-1
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
6/9/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
18/09/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
29/09/2011 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
30/09/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
8/10/2009
11/11/2009 Class-III
23/07/2009
27/11/2009
25/11/2009
04/12/2009
4/12/2009
21/12/2009
Class-1
9/12/2009
Class-1
3/2/2010 24/02/2010
3/12/2011
Class-1
1/12/2009
12/11/2009
Class-II
2/3/2010
Class-1
24/11/2009
30/11/2011
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
17/11/2009
09/12/2009
10/11/2011 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
19/03/2010
Class-II
16/12/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
28/12/2011 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
23/02/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
1/3/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
9/3/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
14/12/2009
23/03/2010
4/3/2010 23/03/2010
Class-1
19/02/2010
29/03/2010
5/4/2010
Class-1
7/4/2010 29/04/2010
3/4/2010 30/04/2010
Class-III
Sp. Class
21/03/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
22/03/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
4/4/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
28/04/2012
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Class-1
25/03/2010
30/04/2010
Class-II
28/04/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
29/04/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
25/05/2010
18/05/2010
10/06/2010
8/6/2012
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
18/06/2010
Class-1
9/6/2010 23/06/2010
21/06/2010
5/5/2010 19/07/2012
21/07/2010
Class-III
14/06/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
22/06/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
1/7/2012
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Class-III
18/07/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
6/9/2010 Class-III
25/08/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
18/03/2010
28/09/2010
26/10/2010
03/09/2010
26/11/2010
30/11/2010
27/10/2010
29/11/2010
22/12/2010
Class-II
20/12/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
03/01/2011
20/01/2011
25/01/2011
Sp. Class
23/01/2013
08/02/2011
11/02/2011
15/02/2011
13/09/2010
Class-1
Class-II
Class-1
3/12/2010
Class-1
12/9/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
25/10/2012 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2
40kg/cm2
29/11/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
2/12/2012 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
Sp. Class
14/02/2013
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
5/2/2011
28/02/2013
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
31/01/2011
01/02/2011
22/03/2011
01/06/2011
08/06/2011
27/05/2011
13/06/2011
14/06/2011
18/11/2010
09/06/2011
18/06/2011
14/06/2011
28/06/2011
06/017/2011 Class-II
21/03/2011
10/05/2011
19/07/2011
Class-1
21/03/2013 B.R.&E.
S.F.P.F.E.
WP>40kg/cm2
125kg/cm2
7/6/2013
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
13/06/2013
Class-1
Class-II
Class-III
B.R.&E.
S.F.P.F.E.
WP>125kg/cm2
17/06/2013 B.R.&E.
S.F.P.F.E.
WP40kg/cm2
4/7/2013 B.R.&E.
S.F.P.F.E.
WP40kg/cm2
18/07/2013 B.R.&E.
S.F.P.F.E.
WP17.5kg/cm2