CSR 05 Balochistan

This document provides a rate analysis for various construction codes. It includes estimated costs for manpower, equipment, materials, overhead and profit to determine a total rate for each code. The codes cover a wide range of activities including clearing, excavation, embankment formation, subgrade preparation, paving and concrete work. The analysis was conducted for district 08 Chaghai to estimate construction costs for that region.

Uploaded by

Sikandar Khattak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views140 pages

CSR 05 Balochistan

This document provides a rate analysis for various construction codes. It includes estimated costs for manpower, equipment, materials, overhead and profit to determine a total rate for each code. The codes cover a wide range of activities including clearing, excavation, embankment formation, subgrade preparation, paving and concrete work. The analysis was conducted for district 08 Chaghai to estimate construction costs for that region.

Uploaded by

Sikandar Khattak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 140

General Revision- IV

CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.87 102.44 0.88 27.30 136.49
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.21 258.13 1.97 69.08 345.39
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 64.85 1,032.53 7.89 276.32 1,381.59
103 STRIPPING CM 2.21 59.42 - 15.41 77.04
104 COMPACTION OF NATURAL GROUND SM 0.32 5.92 0.93 1.79 8.96
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.47 86.79 - 22.82 114.08
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 112.91 193.76 46.20 88.22 441.09
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.80 214.84 - 57.41 287.05
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.87 167.12 - 44.25 221.24
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.65 78.63 - 20.57 102.85
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 112.91 193.76 46.20 88.22 441.09
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.96 199.88 - 54.46 272.30
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.55 167.24 - 43.70 218.49
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.08 89.04 0.31 24.11 120.54
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 54.11 165.86 53.31 68.32 341.60
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 99.79 258.51 30.80 97.28 486.38
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 83.48 193.04 - 69.13 345.65
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 51.32 160.37 - 52.92 264.61
107 d GRANULAR BACK FILL CM 28.20 83.07 394.88 126.54 632.69
107 e COMMON BACK FILL CM 18.96 37.31 6.19 15.62 78.08
108 a
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN COMMON MATERIAL CM 6.18 106.71 6.19 29.77 148.85
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN HARD ROCK MATERIAL CM 17.43 302.97 50.12 92.63 463.15
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN MEDIUM ROCK MATERIAL CM 13.07 268.11 2.94 71.03 355.15
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN SOFT ROCK MATERIAL CM 11.62 238.60 - 62.56 312.78
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION
IN COMMON MATERIAL CM 6.84 112.14 8.88 31.97 159.83
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 1 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.56 46.31 6.19 14.52 72.58
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.34 73.87 3.68 22.47 112.36
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.24 16.84 1.77 4.96 24.81
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.92 10.31 0.94 3.04 15.21
110 IMPROVED SUB-GRADE CM 8.60 75.50 53.45 34.39 171.94
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.75 9.38 0.96 2.77 13.86
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.11 9.92 0.74 2.94 14.71
201 GRANULAR SUB-BASE CM 6.98 106.91 419.20 133.27 666.36
202 AGGREGATE BASE CM 8.23 132.11 526.72 166.77 833.83
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 55.15 916.98 3,396.44 1,092.14 5,460.71
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 57.36 916.98 3,628.99 1,150.83 5,754.16
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 62.04 957.74 3,391.09 1,102.72 5,513.59
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 62.04 954.75 3,711.93 1,182.18 5,910.90
204 b CEMENT STABLIZED BASE CM 24.47 272.73 652.35 237.39 1,186.94
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 219.29 568.44 22,582.80 5,842.63 29,213.16
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 219.29 568.44 21,762.72 5,637.61 28,188.06
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 68.60 55.65 558.37 170.66 853.28
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 118.69 1,408.67 3,059.14 1,146.63 5,733.13
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 74.35 66.68 455.62 149.16 745.81
207 a DEEP PATCHING (0-15 cm) SM 1.57 30.14 1.53 8.31 41.55
207 b DEEP PATCHING (16-30 cm) SM 1.57 26.47 1.53 7.39 36.96
208 REINSTATEMENT OF ROAD SURFACE SM 1.64 37.00 0.68 9.83 49.15
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.15 70.82 0.55 18.38 91.90
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.43 14.16 0.11 3.68 18.38
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.59 5.88 29.40
Page 2 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.59 5.88 29.40
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 10.03 2.60 12.98
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.71 2.27 11.33
304 a SINGLE SURFACE TREATMENT SM 0.69 4.16 43.06 11.98 59.89
304 b DOUBLE SURFACE TREATMENT SM 1.00 8.06 81.13 22.55 112.74
304 c TRIPPLE SURFACE TREATMENT SM 1.70 11.08 96.59 27.34 136.71
304 d SEAL COAT SM 0.64 2.33 25.73 7.18 35.88
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 53.19 906.07 3,982.04 1,235.33 6,176.63
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 53.19 876.73 4,297.14 1,306.77 6,533.83
307 a DENSE GRADED HOT BIT-MAC CM 126.95 171.48 3,275.14 893.39 4,466.96
307 b OPEN GRADED HOT BIT-MAC CM 126.95 171.48 3,178.88 869.33 4,346.64
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.32 456.95 897.92 344.30 1,721.49
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 196.25 465.97 24,556.50 6,304.68 31,523.40
309 a COLD MILLING, 0 - 30 mm SM 0.83 16.87 7.56 6.32 31.58
309 b COLD MILLING, 0 - 50 mm SM 1.39 28.11 12.60 10.53 52.63
309 c COLD MILLING, 0 - 70 mm SM 2.08 42.16 18.90 15.79 78.93
401 ai CONCRETE CLASS "A3" (Underground) CM 434.78 643.62 3,314.43 1,098.21 5,491.04
401 aii CONCRETE CLASS "A3" (Onground) CM 434.78 643.62 3,523.33 1,150.43 5,752.16
401 aiii CONCRETE CLASS "A3" (Elevated) CM 434.78 643.62 3,941.13 1,254.88 6,274.41
401 b CONCRETE CLASS "B" CM 562.36 407.09 2,497.55 866.75 4,333.75
401 ci CONCRETE CLASS "C" (Underground) CM 416.15 258.76 2,968.28 910.80 4,553.99
401 cii CONCRETE CLASS "C" (Onground) CM 416.15 258.76 3,057.38 933.07 4,665.36
401 ciii CONCRETE CLASS "C" (Elevated) CM 416.15 258.76 3,235.57 977.62 4,888.10
401 d CONCRETE CLASS "D1" CM 669.29 810.64 4,244.95 1,431.22 7,156.10
401 e CONCRETE CLASS "Y" CM 917.43 258.76 3,625.51 1,200.43 6,002.13
401 f LEAN CONCRETE CM 340.56 252.12 2,005.73 649.60 3,248.01
Page 3 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,368.12 468.57 4,115.14 1,487.96 7,439.79
401 gii PRECAST CONCRETE CLASS "B" CM 1,368.12 468.57 3,664.40 1,375.27 6,876.36
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,335.14 - 43,669.40 11,251.14 56,255.68
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,335.14 - 44,719.40 11,513.64 57,568.18
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,040.23 2,335.68 37,234.20 10,152.53 50,762.64
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,158.98 6,882.66 81,716.39 22,689.51 113,447.54
405 b LAUNCHING OF GIRDER TON 49.68 403.69 - 113.34 566.71
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 91.84 - 201.94 73.45 367.23
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 91.84 - 210.65 75.62 378.11
406 c STEEL EXPANSION JOINTS KG 7.40 11.61 60.10 19.78 98.89
406 d WATER STOPS 6" SIZE M 79.76 - 307.06 96.71 483.53
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 33.33 - 1,416.75 362.52 1,812.60
406 g STEEL OR METAL BEARING DEVICES KG 15.62 30.66 80.63 31.73 158.64
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 271.94 847.08 767.80 471.71 2,358.53
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 407.90 1,270.62 1,151.70 707.56 3,537.78
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 407.90 1,270.62 853.34 632.97 3,164.83
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 679.84 2,117.70 1,009.73 951.82 4,759.09
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN NORMAL SOIL M 582.72 1,815.17 953.87 837.94 4,189.70
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN GRAVEL SOIL M 1,019.76 3,176.55 1,282.56 1,369.72 6,848.59
407 h PILE LOAD TEST UPTO 120 TON EACH 17,525.28 19,990.40 86,533.08 31,012.19 155,060.95
407 i PILE LOAD TEST UPTO 240 TON EACH 28,904.64 19,990.40 173,066.16 55,490.30 277,451.50
407 j PILE LOAD TEST UPTO 360 TON EACH 43,625.28 19,990.40 259,599.24 80,803.73 404,018.65
407 k CONFIRMATORY BORING (NX SIZE) M 145.48 826.61 7.74 244.96 1,224.79
410 BRICK WORK CM 258.25 142.50 2,176.57 644.33 3,221.65
411 a STONE MASONRY RANDOM DRY CM 276.12 56.01 473.73 201.47 1,007.33
Page 4 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 323.67 84.89 1,319.81 432.09 2,160.46
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 373.77 56.01 528.10 239.47 1,197.35
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 423.88 84.89 1,364.18 468.24 2,341.19
411 g ROLL POINTING SM 54.37 5.78 48.44 27.15 135.74
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 551.53 134.30 1,292.81 494.66 2,473.30
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 171.18 230.36 406.06 201.90 1,009.50
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 164.85 297.19 522.29 246.08 1,230.41
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 168.39 514.83 643.91 331.78 1,658.91
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 173.53 639.81 964.42 444.44 2,222.20
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 199.73 704.13 1,299.96 550.96 2,754.78
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 248.25 868.93 1,959.09 769.07 3,845.34
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 321.27 961.94 2,450.65 933.47 4,667.33
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 377.58 1,168.07 3,419.06 1,241.18 6,205.89
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 448.47 1,362.74 5,178.70 1,747.48 8,737.39
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 171.18 263.77 430.94 216.47 1,082.36
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 164.85 297.19 558.37 255.10 1,275.51
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 164.39 514.83 672.77 338.00 1,689.99
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 173.53 639.81 1,028.17 460.38 2,301.89
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 199.73 704.13 1,813.74 679.40 3,397.00
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 248.25 868.93 2,467.82 896.25 4,481.25
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 321.27 961.94 3,143.38 1,106.65 5,533.24
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 377.58 1,168.07 4,107.61 1,413.32 7,066.58
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 448.47 1,362.74 5,653.99 1,866.30 9,331.50
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 71.64 68.08 434.27 143.50 717.49
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 634.20 309.47 2,555.33 874.75 4,373.75
507 a STEEL WIRE MESH FOR GABIONS KG 4.44 - 73.81 19.56 97.81
Page 5 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 73.20 - 288.45 90.41 452.06
508 a BRICK PAVING (SINGLE COURSE) SM 84.22 15.80 172.60 68.16 340.78
508 b BRICK PAVING (DOUBLE COURSE) SM 149.33 15.80 341.00 126.53 632.66
509 a RIP RAP CLASS "A" CM 367.23 - 402.35 192.40 961.98
509 b RIP RAP CLASS "B" CM 351.87 - 399.13 187.75 938.75
509 c RIP RAP CLASS "C" CM 353.33 - 402.35 188.92 944.60
509 d GROUTED RIP RAP CLASS "A" CM 428.95 35.09 1,471.88 483.98 2,419.90
509 e GROUTED RIP RAP CLASS "B" CM 412.29 28.07 1,357.66 449.51 2,247.53
509 f GROUTED RIP RAP CLASS "C" CM 405.69 23.39 1,389.15 454.56 2,272.79
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 609.88 181.56 2,963.09 938.63 4,693.16
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.50 115.89 395.84 137.06 685.29
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 80.83 194.57 - 68.85 344.25
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 118.43 35.01 65.38 54.71 273.53
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 151.59 44.81 83.69 70.02 350.11
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 191.68 91.01 267.43 137.53 687.65
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 239.59 113.77 334.29 171.91 859.56
603 BRICK EDGING M 6.97 - 25.92 8.22 41.11
605 a CONCRETE BEAM GUARDRAIL M 55.73 14.67 434.14 126.14 630.68
605 c CONCRETE POST FOR GUARDRAIL M 68.43 13.10 432.63 128.54 642.70
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 183.59 128.42 4,844.69 1,289.18 6,445.88
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.77 192.63 7,611.10 1,964.88 9,824.38
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 183.59 272.87 9,304.94 2,440.35 12,201.75
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 565.49 304.65 16,833.30 4,425.86 22,129.30
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 113.10 60.93 7,395.00 1,892.26 9,461.29
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 251.82 - 1,035.32 321.79 1,608.93
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 251.82 - 1,552.98 451.20 2,256.00
Page 6 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (08) Chaghai
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.32 2.85 15.44 5.15 25.76
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.77 1.27 30.77 8.20 41.01
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.32 2.85 20.60 6.44 32.21
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.77 1.27 41.04 10.77 53.85
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 61.25 - 149.20 52.61 263.06
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0
M ARROWS EACH 61.25 - 387.73 112.25 561.23
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 15 cm WIDTH M 2.90 3.56 21.46 6.98 34.90
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.90 4.75 51.71 14.84 74.20
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 20 cm WIDTH M 2.90 3.56 28.61 8.77 43.84
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.90 4.75 68.95 19.15 95.75
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 61.25 - 207.16 67.10 335.51
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 61.25 - 652.07 178.33 891.65
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 50.72 - 99.46 37.55 187.73
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 50.72 - 258.88 77.40 387.00
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 50.72 - 138.10 47.21 236.03
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 50.72 - 435.37 121.52 607.61
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.94 46.68 167.87 55.62 278.11
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.94 46.68 202.87 64.37 321.86
610 b RIGHT OF WAY MARKER EACH 76.39 60.88 220.01 89.32 446.60
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 487.67 476.40 1,474.10 609.54 3,047.71
610 d TEN KILOMETER POST EACH 940.23 952.79 3,242.30 1,283.83 6,419.15
Page 7 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102-a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.59 102.44 0.88 27.23 136.14
102-b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.57 258.13 1.97 68.92 344.59
102-c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.27 1,032.53 7.89 275.67 1,378.36
103 STRIPPING CM 2.10 59.42 - 15.38 76.90
104 COMPACTION OF NATURAL GROUND SM 0.30 5.92 0.62 1.71 8.55
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.02 86.79 - 22.70 113.51
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 104.38 193.76 46.20 86.09 430.43
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.20 214.84 - 57.26 286.30
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.48 167.12 - 44.15 220.75
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.29 78.63 - 20.48 102.40
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 104.38 193.76 46.20 86.09 430.43
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.57 199.88 - 54.11 270.56
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.27 167.24 - 43.63 218.14
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.69 89.04 0.31 24.01 120.05
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 51.77 165.86 53.31 67.74 338.68
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 92.08 258.51 30.80 95.35 476.74
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 77.39 193.04 - 67.61 338.04
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 47.36 160.37 - 51.93 259.66
107 d GRANULAR BACK FILL CM 26.44 83.07 345.53 113.76 568.80
107 e COMMON BACK FILL CM 18.21 37.31 4.13 14.91 74.56
108 a
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN COMMON MATERIAL CM 5.95 106.71 4.13 29.20 145.99
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN HARD ROCK MATERIAL CM 16.65 302.97 48.81 92.11 460.54
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN MEDIUM ROCK MATERIAL CM 12.49 268.11 1.96 70.64 353.20
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN SOFT ROCK MATERIAL CM 11.10 238.60 - 62.43 312.13
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION
IN COMMON MATERIAL CM 6.61 112.14 6.81 31.39 156.95
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 8 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.33 46.31 4.13 13.94 69.71
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.94 73.87 2.45 22.07 110.33
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.18 16.84 1.18 4.80 24.00
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.88 10.31 0.63 2.96 14.78
110 IMPROVED SUB-GRADE CM 8.34 75.50 52.82 34.17 170.83
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.71 9.38 0.64 2.68 13.41
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.09 9.92 0.74 2.94 14.69
201 GRANULAR SUB-BASE CM 6.69 106.91 348.80 115.60 578.00
202 AGGREGATE BASE CM 7.84 132.11 525.25 166.30 831.50
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 54.47 916.98 3,376.43 1,086.97 5,434.85
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 56.68 916.98 3,612.72 1,146.60 5,732.98
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 61.17 957.74 3,371.00 1,097.48 5,487.39
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 61.17 954.75 3,695.54 1,177.87 5,889.33
204 b CEMENT STABLIZED BASE CM 23.41 272.73 619.39 228.88 1,144.41
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 202.06 568.44 22,531.80 5,825.58 29,127.88
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 202.06 568.44 21,711.72 5,620.56 28,102.78
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 67.70 55.65 556.39 169.94 849.68
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 116.87 1,408.67 3,051.03 1,144.14 5,720.71
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 73.36 66.68 471.88 152.98 764.90
207 a DEEP PATCHING (0-15 cm) SM 1.49 30.14 1.02 8.16 40.81
207 b DEEP PATCHING (16-30 cm) SM 1.49 26.47 1.02 7.25 36.23
208 REINSTATEMENT OF ROAD SURFACE SM 1.53 37.00 0.45 9.75 48.73
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.98 70.82 0.55 18.34 91.69
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.40 14.16 0.11 3.67 18.34
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 0.67 22.54 5.87 29.33
Page 9 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.54 5.86 29.31
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 10.01 2.59 12.94
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 8.68 2.26 11.28
304 a SINGLE SURFACE TREATMENT SM 0.64 4.16 42.92 11.93 59.65
304 b DOUBLE SURFACE TREATMENT SM 0.93 8.06 80.90 22.47 112.36
304 c TRIPPLE SURFACE TREATMENT SM 1.58 11.08 96.29 27.24 136.19
304 d SEAL COAT SM 0.58 2.33 25.61 7.13 35.65
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 52.54 906.07 3,960.70 1,229.83 6,149.14
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 52.54 876.73 4,272.95 1,300.56 6,502.78
307 a DENSE GRADED HOT BIT-MAC CM 126.31 171.48 3,251.22 887.25 4,436.26
307 b OPEN GRADED HOT BIT-MAC CM 126.31 171.48 3,162.46 865.06 4,325.31
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.26 456.95 896.65 344.22 1,721.08
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 179.02 465.97 24,505.50 6,287.62 31,438.11
309 a COLD MILLING, 0 - 30 mm SM 0.79 16.87 7.54 6.30 31.50
309 b COLD MILLING, 0 - 50 mm SM 1.32 28.11 12.57 10.50 52.50
309 c COLD MILLING, 0 - 70 mm SM 1.98 42.16 18.85 15.75 78.74
401 ai CONCRETE CLASS "A3" (Underground) CM 422.30 643.62 3,228.40 1,073.58 5,367.90
401 aii CONCRETE CLASS "A3" (Onground) CM 422.30 643.62 3,437.30 1,125.81 5,629.03
401 aiii CONCRETE CLASS "A3" (Elevated) CM 422.30 643.62 3,855.10 1,230.26 6,151.28
401 b CONCRETE CLASS "B" CM 543.26 407.09 2,443.98 848.58 4,242.91
401 c1 CONCRETE CLASS "C" (Underground) CM 404.92 258.76 2,892.90 889.15 4,445.73
401 c2 CONCRETE CLASS "C" (Onground) CM 404.92 258.76 2,981.99 911.42 4,557.09
401 c3 CONCRETE CLASS "C" (Elevated) CM 404.92 258.76 3,160.18 955.97 4,779.83
401 d CONCRETE CLASS "D1" CM 647.96 810.64 4,129.92 1,397.13 6,985.65
401 e CONCRETE CLASS "Y" CM 875.52 258.76 3,525.92 1,165.05 5,825.25
401 f LEAN CONCRETE CM 332.50 252.12 1,975.00 639.91 3,199.53
Page 10 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,311.33 468.57 4,026.30 1,451.55 7,257.75
401 gii PRECAST CONCRETE CLASS "B" CM 1,311.33 468.57 3,609.63 1,347.38 6,736.91
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,286.06 - 43,697.82 11,245.97 56,229.85
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,286.06 - 44,747.82 11,508.47 57,542.35
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,026.42 2,335.68 40,161.80 10,880.98 54,404.88
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,048.28 6,882.66 81,685.25 22,654.05 113,270.24
405 b LAUNCHING OF GIRDER TON 47.38 403.69 - 112.77 563.84
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 88.31 - 200.91 72.31 361.53
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 88.31 - 209.63 74.49 372.43
406 c STEEL EXPANSION JOINTS KG 7.16 11.61 64.59 20.84 104.20
406 d WATER STOPS 6" SIZE M 80.97 - 306.93 96.98 484.88
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.74 - 1,416.41 361.54 1,807.69
406 g STEEL OR METAL BEARING DEVICES KG 14.79 30.66 84.59 32.51 162.55
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 257.02 847.08 702.57 451.67 2,258.34
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 385.53 1,270.62 1,053.86 677.50 3,387.51
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 385.53 1,270.62 789.84 611.50 3,057.49
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 642.54 2,117.70 949.73 927.49 4,637.46
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN NORMAL SOIL M 550.75 1,815.17 892.62 814.64 4,073.18
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN GRAVEL SOIL M 963.81 3,176.55 1,218.34 1,339.68 6,698.38
407 h PILE LOAD TEST UPTO 120 TON EACH 20,724.96 19,990.40 83,424.92 31,035.07 155,175.35
407 i PILE LOAD TEST UPTO 240 TON EACH 28,737.12 19,990.40 166,849.84 53,894.34 269,471.70
407 j PILE LOAD TEST UPTO 360 TON EACH 43,224.96 19,990.40 250,274.76 78,372.53 391,862.65
407 k CONFIRMATORY BORING (NX SIZE) M 139.33 826.61 5.16 242.78 1,213.88
410 BRICK WORK CM 235.60 142.50 2,177.77 638.97 3,194.84
411 a STONE MASONRY RANDOM DRY CM 257.19 56.01 421.37 183.64 918.21
Page 11 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 302.19 84.89 1,249.48 409.14 2,045.70
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 347.19 56.01 469.62 218.21 1,091.03
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 392.19 84.89 1,283.32 440.10 2,200.50
411 g ROLL POINTING SM 49.10 5.78 47.74 25.66 128.28
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 512.19 134.30 1,211.97 464.62 2,323.08
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 164.98 230.36 402.29 199.41 997.04
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 159.50 297.19 518.08 243.69 1,218.46
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 161.54 514.83 639.11 328.87 1,644.35
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 167.31 639.81 958.04 441.29 2,206.45
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 193.51 704.13 1,293.58 547.81 2,739.03
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 239.93 868.93 1,949.84 764.68 3,823.38
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 310.50 961.94 2,439.12 927.89 4,639.45
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 366.32 1,168.07 3,405.06 1,234.86 6,174.31
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 431.55 1,362.74 5,162.37 1,739.17 8,695.83
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 164.98 263.77 427.39 214.04 1,070.18
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 159.50 297.19 554.16 252.71 1,263.56
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 156.54 514.83 667.97 334.84 1,674.18
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 167.31 639.81 1,023.81 457.73 2,288.66
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 193.51 704.13 1,806.00 675.91 3,379.55
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 239.93 868.93 2,458.57 891.86 4,459.29
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 310.50 961.94 3,131.85 1,101.07 5,505.36
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 366.32 1,168.07 4,093.62 1,407.00 7,035.01
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 431.55 1,362.74 5,637.66 1,857.99 9,289.94
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.64 68.08 427.97 141.17 705.86
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 621.80 309.47 2,499.54 857.70 4,288.51
507 a STEEL WIRE MESH FOR GABIONS KG 4.07 - 69.82 18.47 92.36
Page 12 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 71.33 - 288.45 89.95 449.73
508 a BRICK PAVING (SINGLE COURSE) SM 78.68 15.80 173.45 66.98 334.91
508 b BRICK PAVING (DOUBLE COURSE) SM 138.68 15.80 343.16 124.41 622.05
509 a RIP RAP CLASS "A" CM 338.91 - 350.03 172.24 861.18
509 b RIP RAP CLASS "B" CM 325.13 - 347.22 168.09 840.44
509 c RIP RAP CLASS "C" CM 325.94 - 350.03 168.99 844.96
509 d GROUTED RIP RAP CLASS "A" CM 382.54 35.09 1,385.10 450.68 2,253.41
509 e GROUTED RIP RAP CLASS "B" CM 367.86 28.07 1,275.01 417.74 2,088.68
509 f GROUTED RIP RAP CLASS "C" CM 361.89 23.39 1,301.56 421.71 2,108.55
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 595.20 181.56 2,886.72 915.87 4,579.35
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.34 115.89 346.46 124.67 623.36
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 76.94 194.57 - 67.88 339.39
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 110.66 35.01 56.88 50.64 253.19
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 141.65 44.81 72.81 64.82 324.09
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 177.65 91.01 253.50 130.54 652.70
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 222.06 113.77 316.88 163.18 815.89
603 BRICK EDGING M 6.60 - 26.40 8.25 41.25
605 a CONCRETE BEAM GUARDRAIL M 53.49 14.67 430.60 124.69 623.45
605 c CONCRETE POST FOR GUARDRAIL M 65.68 13.10 428.29 126.77 633.84
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 172.04 128.42 4,832.14 1,283.15 6,415.75
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 56.38 192.63 7,593.84 1,960.71 9,803.56
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 172.04 272.87 9,273.80 2,429.68 12,148.39
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 543.05 304.65 16,785.23 4,408.23 22,041.16
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 108.61 60.93 7,383.77 1,888.33 9,441.64
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 222.18 - 1,034.83 314.25 1,571.26
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 222.18 - 1,552.25 443.61 2,218.04
Page 13 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (14) Dera Bugti
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.17 2.85 15.44 5.12 25.58
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.72 1.27 30.77 8.19 40.95
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.17 2.85 20.60 6.41 32.03
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.72 1.27 41.05 10.76 53.80
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 57.27 - 149.20 51.62 258.09
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0
M ARROWS EACH 57.27 - 387.80 111.27 556.34
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 15 cm WIDTH M 2.71 3.56 21.46 6.93 34.66
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.71 4.75 51.71 14.79 73.96
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 20 cm WIDTH M 2.71 3.56 28.61 8.72 43.60
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.71 4.75 68.95 19.10 95.51
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 57.27 - 207.16 66.11 330.54
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 57.27 - 652.07 177.34 886.68
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 47.55 - 99.47 36.76 183.78
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 47.55 - 258.92 76.62 383.09
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 47.55 - 138.11 46.42 232.08
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 47.55 - 435.37 120.73 603.65
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.16 46.68 167.78 55.66 278.28
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.16 46.68 202.78 64.41 322.03
610 b RIGHT OF WAY MARKER EACH 74.82 60.88 216.05 87.94 439.69
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 454.00 476.40 1,454.03 596.11 2,980.54
610 d TEN KILOMETER POST EACH 878.00 952.79 3,183.70 1,253.62 6,268.11
Page 14 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.76 6.96 - 1.93 9.65
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.65 102.44 0.88 27.74 138.71
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 21.94 258.13 1.97 70.51 352.55
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 87.75 1,032.53 7.89 282.04 1,410.21
103 STRIPPING CM 2.72 59.42 - 15.54 77.68
104 COMPACTION OF NATURAL GROUND SM 0.39 5.92 0.62 1.73 8.66
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.73 86.79 - 22.88 114.40
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 121.21 193.76 46.20 90.29 451.46
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 16.34 214.84 - 57.80 288.98
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.88 167.12 - 44.50 222.50
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.87 78.63 - 20.63 103.13
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 121.21 193.76 46.20 90.29 451.46
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.23 199.88 - 54.78 273.89
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.28 167.24 - 43.88 219.40
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.80 89.04 0.31 24.29 121.44
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 64.87 165.86 53.31 71.01 355.05
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 106.85 258.51 30.80 99.04 495.20
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 89.63 193.04 - 70.67 353.34
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.95 160.37 - 53.83 269.15
107 d GRANULAR BACK FILL CM 35.13 83.07 302.76 105.24 526.20
107 e COMMON BACK FILL CM 26.81 37.31 4.13 17.06 85.31
108 a
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN COMMON MATERIAL CM 6.86 106.71 4.13 29.43 147.13
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN HARD ROCK MATERIAL CM 20.12 302.97 48.81 92.98 464.88
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN MEDIUM ROCK MATERIAL CM 15.09 268.11 1.96 71.29 356.45
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY
EXCAVATION IN SOFT ROCK MATERIAL CM 13.41 238.60 - 63.00 315.01
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION
IN COMMON MATERIAL CM 7.91 112.14 6.81 31.72 158.58
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 15 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 6.18 46.31 4.13 14.16 70.78
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 14.85 73.87 2.45 22.79 113.96
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.41 16.84 1.18 4.86 24.29
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 1.05 10.31 0.63 3.00 14.99
110 IMPROVED SUB-GRADE CM 10.13 75.50 52.59 34.56 172.78
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.89 9.38 0.64 2.73 13.64
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.32 9.92 0.74 3.00 14.98
201 GRANULAR SUB-BASE CM 7.98 106.91 458.25 143.29 716.43
202 AGGREGATE BASE CM 9.04 132.11 567.03 177.05 885.23
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 75.15 916.98 3,410.51 1,100.66 5,503.30
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 77.60 916.98 3,637.95 1,158.13 5,790.66
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 83.30 957.74 3,405.51 1,111.64 5,558.19
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 83.30 954.75 3,720.27 1,189.58 5,947.90
204 b CEMENT STABLIZED BASE CM 27.96 272.73 687.93 247.16 1,235.78
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 255.51 568.44 22,174.80 5,749.69 28,748.44
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 255.51 568.44 21,354.72 5,544.67 27,723.34
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 99.81 55.65 600.65 189.03 945.14
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 153.05 1,408.67 3,080.48 1,160.55 5,802.75
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 109.20 66.68 490.56 166.61 833.05
207 a DEEP PATCHING (0-15 cm) SM 1.74 30.14 1.02 8.23 41.13
207 b DEEP PATCHING (16-30 cm) SM 1.74 26.47 1.02 7.31 36.54
208 REINSTATEMENT OF ROAD SURFACE SM 1.79 37.00 0.45 9.81 49.05
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.33 70.82 0.55 18.43 92.13
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.47 14.16 0.11 3.69 18.43
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 0.67 22.18 5.79 28.95
Page 16 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 0.67 22.18 5.79 28.94
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.24 9.86 2.56 12.78
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.24 8.54 2.23 11.13
304 a SINGLE SURFACE TREATMENT SM 0.79 4.16 42.50 11.86 59.31
304 b DOUBLE SURFACE TREATMENT SM 1.14 8.06 80.33 22.38 111.91
304 c TRIPPLE SURFACE TREATMENT SM 1.93 11.08 95.84 27.21 136.06
304 d SEAL COAT SM 0.72 2.33 25.41 7.12 35.58
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 70.29 906.07 3,990.96 1,241.83 6,209.15
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 70.29 876.73 4,303.95 1,312.74 6,563.71
307 a DENSE GRADED HOT BIT-MAC CM 170.60 171.48 3,281.67 905.94 4,529.69
307 b OPEN GRADED HOT BIT-MAC CM 170.60 171.48 3,187.00 882.27 4,411.35
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 MM THICK) CM 29.59 419.66 1,123.95 393.30 1,966.50
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 229.92 465.97 24,148.50 6,211.10 31,055.49
309 a COLD MILLING, 0 - 30 mm SM 0.98 16.87 7.54 6.35 31.74
309 b COLD MILLING, 0 - 50 mm SM 1.63 28.11 12.57 10.58 52.89
309 c COLD MILLING, 0 - 70 mm SM 2.45 42.16 18.85 15.87 79.33
401 ai CONCRETE CLASS "A3" (Underground) CM 504.32 643.62 3,259.97 1,101.98 5,509.89
401 aii CONCRETE CLASS "A3" (Onground) CM 504.32 643.62 3,468.87 1,154.20 5,771.01
401 aiii CONCRETE CLASS "A3" (Elevated) CM 504.32 643.62 3,886.67 1,258.65 6,293.26
401 b CONCRETE CLASS "B" CM 674.34 407.09 2,468.98 887.60 4,438.01
401 ci CONCRETE CLASS "C" (Underground) CM 505.36 258.76 2,929.01 923.28 4,616.41
401 cii CONCRETE CLASS "C" (Onground) CM 505.36 258.76 3,018.10 945.56 4,727.78
401 ciii CONCRETE CLASS "C" (Elevated) CM 505.36 258.76 3,196.29 990.10 4,950.51
401 d CONCRETE CLASS "D1" CM 779.87 810.64 4,157.77 1,437.07 7,185.35
401 e CONCRETE CLASS "Y" CM 1,093.90 258.76 3,558.44 1,227.78 6,138.88
401 f LEAN CONCRETE CM 449.52 252.12 1,901.88 650.88 3,254.40
Page 17 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,701.57 468.57 4,061.79 1,557.98 7,789.91
401 gii PRECAST CONCRETE CLASS "B" CM 1,701.57 468.57 3,637.43 1,451.89 7,259.46
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,547.14 - 43,191.89 11,184.76 55,923.79
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,547.14 - 44,241.89 11,447.26 57,236.29
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,202.88 2,335.68 36,717.60 10,064.04 50,320.20
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,417.84 6,882.66 81,651.79 22,738.07 113,690.36
405 b LAUNCHING OF GIRDER TON 57.15 403.69 - 115.21 576.05
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 108.75 - 193.40 75.54 377.69
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 108.75 - 202.12 77.72 388.59
406 c STEEL EXPANSION JOINTS KG 8.82 11.61 59.71 20.04 100.18
406 d WATER STOPS 6" SIZE M 97.45 - 305.97 100.86 504.28
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.02 - 1.22 0.31 1.55
406 f ASHPALT FELT (3 PLY) SM 37.13 - 1,413.96 362.77 1,813.86
406 g STEEL OR METAL BEARING DEVICES KG 18.56 30.66 80.23 32.36 161.81
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 319.57 847.08 701.25 466.98 2,334.88
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 479.35 1,270.62 1,051.88 700.46 3,502.31
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 479.35 1,270.62 787.64 634.40 3,172.01
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 798.92 2,117.70 946.06 965.67 4,828.35
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN NORMAL SOIL M 684.79 1,815.17 889.48 847.36 4,236.80
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING
ONLY IN GRAVEL SOIL M 1,198.38 3,176.55 1,212.84 1,396.94 6,984.71
407 h PILE LOAD TEST UPTO 120 TON EACH 24,058.62 19,990.40 70,992.28 28,760.33 143,801.63
407 i PILE LOAD TEST UPTO 240 TON EACH 44,763.42 19,990.40 141,984.56 51,684.60 258,422.98
407 j PILE LOAD TEST UPTO 360 TON EACH 66,581.82 19,990.40 212,976.84 74,887.27 374,436.33
407 k CONFIRMATORY BORING (NX SIZE) M 188.79 826.61 5.16 255.14 1,275.70
410 BRICK WORK CM 320.55 142.50 2,172.14 658.80 3,293.99
411 a STONE MASONRY RANDOM DRY CM 344.68 56.01 568.06 242.19 1,210.94
Page 18 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 410.49 84.89 1,389.11 471.12 2,355.61
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 471.24 56.01 1,051.04 394.57 1,972.86
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 531.99 84.89 1,859.47 619.09 3,095.44
411 g ROLL POINTING SM 66.78 5.78 47.63 30.05 150.24
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 705.80 134.30 1,788.10 657.05 3,285.25
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 240.15 230.36 402.07 218.15 1,090.73
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 233.61 297.19 517.82 262.16 1,310.78
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 223.38 514.83 638.80 344.25 1,721.26
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 235.29 639.81 957.68 458.20 2,290.98
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 270.72 704.13 1,293.22 567.02 2,835.09
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 331.47 868.93 1,949.32 787.43 3,937.15
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 428.96 961.94 2,438.60 957.38 4,786.88
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 507.62 1,168.07 3,404.43 1,270.03 6,350.15
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 597.85 1,362.74 5,161.63 1,780.56 8,902.78
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 240.15 263.77 426.95 232.72 1,163.59
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 233.61 297.19 553.90 271.18 1,355.88
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 217.47 514.83 667.66 349.99 1,749.95
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 235.29 639.81 1,023.52 474.66 2,373.28
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 270.72 704.13 1,805.60 695.11 3,475.56
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 331.47 868.93 2,458.05 914.61 4,573.06
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 428.96 961.94 3,131.33 1,130.56 5,652.79
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 507.62 1,168.07 4,092.99 1,442.17 7,210.85
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 597.85 1,362.74 5,636.93 1,899.38 9,496.90
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 96.96 68.08 315.65 120.17 600.86
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 760.60 309.47 2,524.54 898.65 4,493.26
507 a STEEL WIRE MESH FOR GABIONS KG 5.36 - 69.82 18.80 93.98
Page 19 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 103.99 - 495.83 149.96 749.78
508 a BRICK PAVING (SINGLE COURSE) SM 109.17 15.80 166.38 72.84 364.19
508 b BRICK PAVING (DOUBLE COURSE) SM 193.55 15.80 330.44 134.95 674.74
509 a RIP RAP CLASS "A" CM 467.42 - 496.69 241.03 1,205.14
509 b RIP RAP CLASS "B" CM 450.89 - 492.71 235.90 1,179.50
509 c RIP RAP CLASS "C" CM 452.24 - 496.69 237.23 1,186.16
509 d GROUTED RIP RAP CLASS "A" CM 569.09 35.09 1,934.85 634.76 3,173.79
509 e GROUTED RIP RAP CLASS "B" CM 547.08 28.07 1,819.29 598.61 2,993.05
509 f GROUTED RIP RAP CLASS "C" CM 540.27 23.39 1,850.09 603.44 3,017.19
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 789.42 181.56 2,910.46 970.36 4,851.80
509 h FILTER LAYER OF GRANULAR MATERIAL CM 51.51 115.89 302.82 117.56 587.78
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 108.84 194.57 - 75.85 379.26
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 151.22 35.01 80.71 66.74 333.68
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 193.56 44.81 103.31 85.42 427.10
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 242.16 91.01 265.94 149.78 748.89
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 302.70 113.77 332.42 187.22 936.11
603 BRICK EDGING M 9.06 - 26.40 8.87 44.33
605 a CONCRETE BEAM GUARDRAIL M 76.20 14.67 429.83 130.18 650.88
605 c CONCRETE POST FOR GUARDRAIL M 93.56 13.10 427.61 133.57 667.84
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 227.11 128.42 4,827.83 1,295.84 6,479.20
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 71.51 192.63 7,586.50 1,962.66 9,813.30
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 227.11 272.87 9,261.92 2,440.48 12,202.38
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 779.40 304.65 16,757.50 4,460.39 22,301.94
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 155.88 60.93 7,366.31 1,895.78 9,478.90
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 282.66 - 1,031.26 328.48 1,642.40
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 282.66 - 1,546.89 457.39 2,286.94
Page 20 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (19) Gwadar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.92 2.85 15.42 5.30 26.49
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.97 1.27 30.56 8.20 41.00
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.92 2.85 20.57 6.59 32.93
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.97 1.27 40.76 10.75 53.75
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 68.56 - 148.95 54.38 271.89
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0
M ARROWS EACH 68.56 - 385.15 113.43 567.14
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 15 cm WIDTH M 3.65 3.56 21.43 7.16 35.80
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.65 4.75 51.71 15.03 75.14
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES
OF 20 cm WIDTH M 3.65 3.56 28.57 8.95 44.73
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.65 4.75 68.95 19.34 96.69
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 68.56 - 206.91 68.87 344.34
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 68.56 - 652.07 180.16 900.79
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 57.42 - 99.30 39.18 195.90
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 57.42 - 257.16 78.65 393.23
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 57.42 - 137.94 48.84 244.20
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 57.42 - 435.37 123.20 615.99
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 9.65 46.68 167.77 56.03 280.13
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 9.65 46.68 202.77 64.78 323.88
610 b RIGHT OF WAY MARKER EACH 108.68 60.88 216.96 96.63 483.15
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 634.29 476.40 1,459.24 642.48 3,212.41
610 d TEN KILOMETER POST EACH 1,231.45 952.79 3,194.35 1,344.65 6,723.24
Page 21 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.51 6.96 - 1.87 9.34
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.34 102.44 0.88 27.17 135.83
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.02 258.13 1.97 68.78 343.90
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 60.09 1,032.53 7.89 275.13 1,375.64
103 STRIPPING CM 1.98 59.42 - 15.35 76.75
104 COMPACTION OF NATURAL GROUND SM 0.28 5.92 0.62 1.71 8.53
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.69 86.79 - 22.62 113.10
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 96.89 193.76 46.20 84.21 421.06
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.16 214.84 - 57.00 285.00
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.78 167.12 - 43.98 219.88
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.02 78.63 - 20.41 102.06
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 96.89 193.76 46.20 84.21 421.06
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 15.39 199.88 - 53.82 269.09
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.72 167.24 - 43.49 217.45
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.11 89.04 0.31 23.87 119.33
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 49.04 165.86 53.31 67.05 335.26
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 85.49 258.51 30.80 93.70 468.50
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 71.87 193.04 - 66.23 331.14
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 43.96 160.37 - 51.08 255.41
107 d GRANULAR BACK FILL CM 25.23 83.07 350.98 114.82 574.10
107 e COMMON BACK FILL CM 17.83 37.31 4.13 14.82 74.09
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.47 106.71 4.13 29.08 145.39
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.52 302.97 48.81 91.83 459.13
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.64 268.11 1.96 70.43 352.14
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.35 238.60 - 62.24 311.19
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.13 112.14 6.81 31.27 156.35
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 22 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.91 46.31 4.13 13.84 69.19
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.16 73.87 2.45 21.87 109.35
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.09 16.84 1.18 4.78 23.89
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.81 10.31 0.63 2.94 14.69
110 IMPROVED SUB-GRADE CM 7.73 75.50 52.59 33.96 169.78
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.67 9.38 0.64 2.67 13.36
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.01 9.92 0.74 2.92 14.59
201 GRANULAR SUB-BASE CM 6.21 106.91 433.00 136.53 682.65
202 AGGREGATE BASE CM 7.20 132.11 535.69 168.75 843.75
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 52.25 916.98 3,390.66 1,089.97 5,449.86
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 54.25 916.98 3,622.35 1,148.40 5,741.98
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 58.50 957.74 3,385.33 1,100.39 5,501.96
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 58.50 954.75 3,704.99 1,179.56 5,897.80
204 b CEMENT STABLIZED BASE CM 21.69 272.73 646.92 235.34 1,176.68
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 190.51 568.44 22,429.80 5,797.19 28,985.94
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 190.51 568.44 21,609.72 5,592.17 27,960.84
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 66.34 55.65 567.14 172.28 861.41
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 110.41 1,408.67 3,059.83 1,144.73 5,723.64
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 72.19 66.68 462.44 150.33 751.64
207 a DEEP PATCHING (0-15 cm) SM 1.38 30.14 1.02 8.14 40.68
207 b DEEP PATCHING (16-30 cm) SM 1.38 26.47 1.02 7.22 36.09
208 REINSTATEMENT OF ROAD SURFACE SM 1.41 37.00 0.45 9.72 48.58
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.82 70.82 0.55 18.30 91.49
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.36 14.16 0.11 3.66 18.29
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.44 5.84 29.18
Page 23 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 22.44 5.83 29.16
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.97 2.58 12.88
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.64 2.24 11.21
304 a SINGLE SURFACE TREATMENT SM 0.59 4.16 42.81 11.89 59.45
304 b DOUBLE SURFACE TREATMENT SM 0.87 8.06 80.72 22.41 112.06
304 c TRIPPLE SURFACE TREATMENT SM 1.47 11.08 96.15 27.18 135.88
304 d SEAL COAT SM 0.55 2.33 25.59 7.12 35.59
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 49.93 906.07 3,972.46 1,232.12 6,160.58
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 49.93 876.73 4,285.51 1,303.04 6,515.21
307 a DENSE GRADED HOT BIT-MAC CM 120.15 171.48 3,264.32 888.99 4,444.94
307 b OPEN GRADED HOT BIT-MAC CM 120.15 171.48 3,171.10 865.68 4,328.41
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.53 456.95 896.00 343.62 1,718.10
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 169.71 465.97 24,403.50 6,259.80 31,298.98
309 a COLD MILLING, 0 - 30 mm SM 0.74 16.87 7.54 6.29 31.44
309 b COLD MILLING, 0 - 50 mm SM 1.23 28.11 12.57 10.48 52.39
309 c COLD MILLING, 0 - 70 mm SM 1.84 42.16 18.85 15.71 78.56
401 ai CONCRETE CLASS "A3" (Underground) CM 398.81 643.62 3,235.86 1,069.57 5,347.86
401 aii CONCRETE CLASS "A3" (Onground) CM 398.81 643.62 3,444.76 1,121.80 5,608.99
401 aiii CONCRETE CLASS "A3" (Elevated) CM 398.81 643.62 3,862.57 1,226.25 6,131.25
401 b CONCRETE CLASS "B" CM 513.05 407.09 2,443.45 840.90 4,204.49
401 ci CONCRETE CLASS "C" (Underground) CM 386.19 258.76 2,898.60 885.89 4,429.44
401 cii CONCRETE CLASS "C" (Onground) CM 386.19 258.76 2,987.69 908.16 4,540.80
401 ciii CONCRETE CLASS "C" (Elevated) CM 386.19 258.76 3,165.89 952.71 4,763.55
401 d CONCRETE CLASS "D1" CM 616.69 810.64 4,135.68 1,390.75 6,953.76
401 e CONCRETE CLASS "Y" CM 845.50 258.76 3,535.91 1,160.04 5,800.21
401 f LEAN CONCRETE CM 320.50 252.12 1,968.67 635.32 3,176.61
Page 24 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,269.91 468.57 4,035.34 1,443.46 7,217.28
401 gii PRECAST CONCRETE CLASS "B" CM 1,269.91 468.57 3,609.62 1,337.03 6,685.13
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,219.43 - 43,404.09 11,155.88 55,779.40
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,219.43 - 44,454.09 11,418.38 57,091.90
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 971.19 2,335.68 36,944.36 10,062.81 50,314.04
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,103.87 6,882.66 81,670.71 22,664.31 113,321.55
405 b LAUNCHING OF GIRDER TON 49.46 403.69 - 113.29 566.44
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 84.49 - 197.09 70.40 351.98
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 84.49 - 205.80 72.57 362.86
406 c STEEL EXPANSION JOINTS KG 6.91 11.61 59.91 19.61 98.04
406 d WATER STOPS 6" SIZE M 75.51 - 306.45 95.49 477.45
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.27 - 1,415.20 361.12 1,805.59
406 g STEEL OR METAL BEARING DEVICES KG 14.30 30.66 80.43 31.35 156.74
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 270.79 847.08 701.91 454.95 2,274.73
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 406.19 1,270.62 1,052.87 682.42 3,412.10
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 406.19 1,270.62 788.74 616.39 3,081.94
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 676.98 2,117.70 947.89 935.64 4,678.21
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 580.26 1,815.17 891.05 821.62 4,108.10
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,015.46 3,176.55 1,215.59 1,351.90 6,759.50
407 h PILE LOAD TEST UPTO 120 TON EACH 18,244.38 19,990.40 80,316.76 29,637.89 148,189.43
407 i PILE LOAD TEST UPTO 240 TON EACH 28,811.34 19,990.40 160,633.52 52,358.82 261,794.08
407 j PILE LOAD TEST UPTO 360 TON EACH 42,990.78 19,990.40 240,950.28 75,982.87 379,914.33
407 k CONFIRMATORY BORING (NX SIZE) M 145.41 826.61 5.16 244.30 1,221.48
410 BRICK WORK CM 235.00 142.50 2,097.14 618.66 3,093.30
411 a STONE MASONRY RANDOM DRY CM 253.06 56.01 394.51 175.90 879.48
Page 25 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 298.24 84.89 1,215.56 399.67 1,998.36
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 343.62 56.01 440.62 210.06 1,050.31
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 389.00 84.89 1,249.04 430.73 2,153.66
411 g ROLL POINTING SM 49.39 5.78 47.63 25.70 128.50
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 509.56 134.30 1,177.67 455.38 2,276.91
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 162.13 230.36 402.07 198.64 993.20
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 157.06 297.19 517.82 243.02 1,215.09
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 156.85 514.83 638.80 327.62 1,638.10
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 163.04 639.81 957.68 440.13 2,200.66
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 188.02 704.13 1,293.22 546.34 2,731.71
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 232.70 868.93 1,949.32 762.74 3,813.69
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 301.15 961.94 2,438.60 925.42 4,627.11
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 354.83 1,168.07 3,404.43 1,231.83 6,159.16
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 419.33 1,362.74 5,161.63 1,735.93 8,679.63
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 162.13 263.77 426.95 213.21 1,066.06
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 157.06 297.19 553.90 252.04 1,260.19
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 152.47 514.83 667.66 333.74 1,668.70
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 163.04 639.81 1,023.52 456.59 2,282.96
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 188.02 704.13 1,805.60 674.44 3,372.19
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 232.70 868.93 2,458.05 889.92 4,449.60
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 301.15 961.94 3,131.33 1,098.61 5,493.03
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 354.83 1,168.07 4,092.99 1,403.97 7,019.86
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 419.33 1,362.74 5,636.93 1,854.75 9,273.75
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 66.33 68.08 385.58 130.00 649.99
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 584.84 309.47 2,499.01 848.33 4,241.65
507 a STEEL WIRE MESH FOR GABIONS KG 3.96 - 73.81 19.44 97.21
Page 26 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 69.58 - 319.45 97.26 486.29
508 a BRICK PAVING (SINGLE COURSE) SM 78.07 15.80 163.21 64.27 321.35
508 b BRICK PAVING (DOUBLE COURSE) SM 138.45 15.80 323.03 119.32 596.60
509 a RIP RAP CLASS "A" CM 337.49 - 323.14 165.16 825.79
509 b RIP RAP CLASS "B" CM 324.29 - 320.55 161.21 806.05
509 c RIP RAP CLASS "C" CM 325.62 - 323.14 162.19 810.95
509 d GROUTED RIP RAP CLASS "A" CM 366.17 35.09 1,337.47 434.68 2,173.41
509 e GROUTED RIP RAP CLASS "B" CM 352.33 28.07 1,229.92 402.58 2,012.90
509 f GROUTED RIP RAP CLASS "C" CM 346.93 23.39 1,251.01 405.33 2,026.66
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 575.50 181.56 2,886.19 910.81 4,554.06
509 h FILTER LAYER OF GRANULAR MATERIAL CM 35.11 115.89 351.60 125.65 628.25
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 80.25 194.57 - 68.71 343.53
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 108.91 35.01 52.51 49.11 245.54
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 139.40 44.81 67.21 62.86 314.28
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 175.70 91.01 246.63 128.34 641.68
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 219.62 113.77 308.29 160.42 802.10
603 BRICK EDGING M 6.44 - 24.96 7.85 39.25
605 a CONCRETE BEAM GUARDRAIL M 52.80 14.67 429.81 124.32 621.60
605 c CONCRETE POST FOR GUARDRAIL M 64.84 13.10 427.46 126.35 631.75
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 167.76 128.42 4,828.69 1,281.22 6,406.09
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 53.43 192.63 7,587.50 1,958.39 9,791.95
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 167.76 272.87 9,263.29 2,425.98 12,129.90
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 537.02 304.65 16,764.23 4,401.48 22,007.38
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 107.40 60.93 7,373.29 1,885.41 9,427.03
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 214.70 - 1,032.95 311.91 1,559.56
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 214.70 - 1,549.42 441.03 2,205.15
Page 27 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (24) Kachhi
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 1.96 2.85 15.43 5.06 25.30
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.65 1.27 30.66 8.15 40.73
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 1.96 2.85 20.59 6.35 31.75
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.65 1.27 40.90 10.71 53.53
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 52.72 - 149.07 50.45 252.24
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 52.72 - 386.41 109.78 548.91
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.45 3.56 21.44 6.86 34.31
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.45 4.75 51.71 14.73 73.64
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.45 3.56 28.59 8.65 43.25
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.45 4.75 68.95 19.04 95.19
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 52.72 - 207.03 64.94 324.69
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 52.72 - 652.07 176.20 880.99
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 43.61 - 99.38 35.75 178.74
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 43.61 - 258.00 75.40 377.01
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 43.61 - 138.02 45.41 227.04
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 43.61 - 435.37 119.75 598.73
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.55 46.68 167.77 55.50 277.50
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.55 46.68 202.77 64.25 321.25
610 b RIGHT OF WAY MARKER EACH 73.50 60.88 216.17 87.64 438.19
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 450.82 476.40 1,453.67 595.22 2,976.11
610 d TEN KILOMETER POST EACH 871.26 952.79 3,183.26 1,251.83 6,259.14
Page 28 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.57 6.96 - 1.88 9.41
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.13 102.44 0.88 27.36 136.81
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.78 258.13 1.97 69.22 346.10
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 67.13 1,032.53 7.89 276.89 1,384.44
103 STRIPPING CM 2.34 59.42 - 15.44 77.20
104 COMPACTION OF NATURAL GROUND SM 0.34 5.92 0.62 1.72 8.60
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.76 86.79 - 22.89 114.44
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 120.17 193.76 46.20 90.03 450.16
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.66 214.84 - 57.63 288.13
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.44 167.12 - 44.39 221.95
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.90 78.63 - 20.63 103.16
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 120.17 193.76 46.20 90.03 450.16
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.08 199.88 - 54.74 273.70
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.01 167.24 - 43.81 219.06
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.52 89.04 0.31 24.22 121.09
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 57.66 165.86 53.31 69.21 346.04
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 106.01 258.51 30.80 98.83 494.15
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 88.56 193.04 - 70.40 352.00
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.52 160.37 - 53.72 268.61
107 d GRANULAR BACK FILL CM 29.25 83.07 385.18 124.38 621.88
107 e COMMON BACK FILL CM 19.43 37.31 4.13 15.22 76.09
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.51 106.71 4.13 29.34 146.69
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 18.37 302.97 48.81 92.54 462.69
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 13.78 268.11 1.96 70.96 354.81
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 12.25 238.60 - 62.71 313.56
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 7.18 112.14 6.81 31.53 157.66
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 29 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.92 46.31 4.13 14.09 70.45
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.95 73.87 2.45 22.32 111.59
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.30 16.84 1.18 4.83 24.15
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.98 10.31 0.63 2.98 14.90
110 IMPROVED SUB-GRADE CM 9.05 75.50 52.80 34.34 171.69
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.80 9.38 0.64 2.71 13.53
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.18 9.92 0.74 2.96 14.80
201 GRANULAR SUB-BASE CM 7.36 106.91 394.73 127.25 636.25
202 AGGREGATE BASE CM 8.64 132.11 504.34 161.27 806.36
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 56.20 916.98 3,385.33 1,089.63 5,448.14
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 58.34 916.98 3,613.28 1,147.15 5,735.75
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 63.39 957.74 3,380.24 1,100.34 5,501.71
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 63.39 954.75 3,696.37 1,178.63 5,893.14
204 b CEMENT STABLIZED BASE CM 25.57 272.73 634.68 233.25 1,166.23
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 234.19 568.44 22,480.80 5,820.86 29,104.29
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 234.19 568.44 21,660.72 5,615.84 28,079.19
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 69.80 55.65 534.26 164.93 824.64
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 122.10 1,408.67 3,031.76 1,140.63 5,703.16
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 75.35 66.68 461.32 150.84 754.19
207 a DEEP PATCHING (0-15 cm) SM 1.69 30.14 1.02 8.21 41.06
207 b DEEP PATCHING (16-30 cm) SM 1.69 26.47 1.02 7.30 36.48
208 REINSTATEMENT OF ROAD SURFACE SM 1.75 37.00 0.45 9.80 49.00
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.35 70.82 0.55 18.43 92.15
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.47 14.16 0.11 3.69 18.43
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 0.67 22.49 5.86 29.30
Page 30 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 0.67 22.49 5.86 29.29
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 9.99 2.59 12.93
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.66 2.25 11.26
304 a SINGLE SURFACE TREATMENT SM 0.74 4.16 42.75 11.91 59.56
304 b DOUBLE SURFACE TREATMENT SM 1.07 8.06 80.37 22.38 111.88
304 c TRIPPLE SURFACE TREATMENT SM 1.82 11.08 95.62 27.13 135.65
304 d SEAL COAT SM 0.68 2.33 25.65 7.17 35.83
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.23 906.07 3,973.69 1,233.50 6,167.49
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.23 876.73 4,289.97 1,305.23 6,526.16
307 a DENSE GRADED HOT BIT-MAC CM 130.77 171.48 3,274.19 894.11 4,470.55
307 b OPEN GRADED HOT BIT-MAC CM 130.77 171.48 3,167.69 867.49 4,337.43
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.55 456.95 891.83 342.83 1,714.16
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 211.79 465.97 24,454.50 6,283.07 31,415.33
309 a COLD MILLING, 0 - 30 mm SM 0.87 16.87 7.54 6.32 31.60
309 b COLD MILLING, 0 - 50 mm SM 1.45 28.11 12.57 10.53 52.66
309 c COLD MILLING, 0 - 70 mm SM 2.18 42.16 18.85 15.80 78.99
401 ai CONCRETE CLASS "A3" (Underground) CM 469.51 643.62 3,211.50 1,081.16 5,405.79
401 aii CONCRETE CLASS "A3" (Onground) CM 469.51 643.62 3,420.41 1,133.39 5,666.93
401 aiii CONCRETE CLASS "A3" (Elevated) CM 469.51 643.62 3,838.21 1,237.84 6,189.18
401 b CONCRETE CLASS "B" CM 598.87 407.09 2,405.61 852.89 4,264.46
401 ci CONCRETE CLASS "C" (Underground) CM 449.12 258.76 2,861.62 892.38 4,461.88
401 cii CONCRETE CLASS "C" (Onground) CM 449.12 258.76 2,950.71 914.65 4,573.24
401 ciii CONCRETE CLASS "C" (Elevated) CM 449.12 258.76 3,128.91 959.20 4,795.99
401 d CONCRETE CLASS "D1" CM 731.23 810.64 4,103.76 1,411.41 7,057.04
401 e CONCRETE CLASS "Y" CM 1,007.10 258.76 3,515.74 1,195.40 5,977.00
401 f LEAN CONCRETE CM 358.61 252.12 1,933.85 636.15 3,180.73
Page 31 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,474.61 468.57 4,011.39 1,488.64 7,443.21
401 gii PRECAST CONCRETE CLASS "B" CM 1,474.61 468.57 3,568.65 1,377.96 6,889.79
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,456.94 - 43,668.41 11,281.34 56,406.69
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,456.94 - 44,718.41 11,543.84 57,719.19
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,155.34 2,335.68 37,131.98 10,155.75 50,778.75
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,207.52 6,882.66 81,660.69 22,687.72 113,438.59
405 b LAUNCHING OF GIRDER TON 50.60 403.69 - 113.57 567.86
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 99.42 - 195.27 73.67 368.36
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 99.42 - 203.99 75.85 379.26
406 c STEEL EXPANSION JOINTS KG 8.31 11.61 60.27 20.05 100.24
406 d WATER STOPS 6" SIZE M 86.21 - 306.22 98.11 490.54
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.02 - 1.22 0.31 1.55
406 f ASHPALT FELT (3 PLY) SM 36.74 - 1,414.70 362.86 1,814.30
406 g STEEL OR METAL BEARING DEVICES KG 17.24 30.66 80.74 32.16 160.80
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 282.15 847.08 702.82 458.01 2,290.06
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 423.22 1,270.62 1,054.23 687.02 3,435.09
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 423.22 1,270.62 790.04 620.97 3,104.85
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 705.37 2,117.70 950.06 943.28 4,716.41
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 604.60 1,815.17 892.91 828.17 4,140.85
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,058.06 3,176.55 1,218.84 1,363.36 6,816.81
407 h PILE LOAD TEST UPTO 120 TON EACH 17,790.54 19,990.40 86,533.08 31,078.51 155,392.53
407 i PILE LOAD TEST UPTO 240 TON EACH 28,999.50 19,990.40 173,066.16 55,514.02 277,570.08
407 j PILE LOAD TEST UPTO 360 TON EACH 43,890.54 19,990.40 259,599.24 80,870.05 404,350.23
407 k CONFIRMATORY BORING (NX SIZE) M 149.03 826.61 5.16 245.20 1,226.00
410 BRICK WORK CM 282.21 142.50 2,092.74 629.36 3,146.81
411 a STONE MASONRY RANDOM DRY CM 300.50 56.01 441.21 199.43 997.15
Page 32 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 350.75 84.89 1,257.46 423.28 2,116.38
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 406.25 56.01 491.05 238.33 1,191.64
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 461.76 84.89 1,294.98 460.41 2,302.04
411 g ROLL POINTING SM 59.88 5.78 47.51 28.29 141.46
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 597.51 134.30 1,223.60 488.85 2,444.26
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 177.36 230.36 401.84 202.39 1,011.95
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 170.50 297.19 517.54 246.31 1,231.54
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 176.30 514.83 638.50 332.41 1,662.04
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 180.73 639.81 957.32 444.47 2,222.33
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 206.58 704.13 1,292.86 550.89 2,754.46
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 256.62 868.93 1,948.78 768.58 3,842.91
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 332.10 961.94 2,438.02 933.02 4,665.08
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 388.80 1,168.07 3,403.71 1,240.15 6,200.73
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 463.81 1,362.74 5,160.80 1,746.84 8,734.19
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 177.36 263.77 426.72 216.96 1,084.81
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 170.50 297.19 553.62 255.33 1,276.64
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 172.30 514.83 667.36 338.62 1,693.11
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 180.73 639.81 1,023.25 460.95 2,304.74
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 206.58 704.13 1,805.15 678.97 3,394.83
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 256.62 868.93 2,457.51 895.77 4,478.83
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 332.10 961.94 3,130.75 1,106.20 5,530.99
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 388.80 1,168.07 4,092.27 1,412.29 7,061.43
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 463.81 1,362.74 5,636.09 1,865.66 9,328.30
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 74.31 68.08 451.28 148.42 742.09
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 678.07 309.47 2,460.72 862.07 4,310.33
507 a STEEL WIRE MESH FOR GABIONS KG 4.74 - 69.82 18.64 93.20
Page 33 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 75.17 - 337.31 103.12 515.60
508 a BRICK PAVING (SINGLE COURSE) SM 90.31 15.80 166.74 68.21 341.06
508 b BRICK PAVING (DOUBLE COURSE) SM 160.81 15.80 329.39 126.50 632.50
509 a RIP RAP CLASS "A" CM 396.99 - 369.84 191.71 958.54
509 b RIP RAP CLASS "B" CM 379.99 - 366.88 186.72 933.59
509 c RIP RAP CLASS "C" CM 382.16 - 369.84 188.00 940.00
509 d GROUTED RIP RAP CLASS "A" CM 479.78 35.09 1,400.32 478.80 2,393.99
509 e GROUTED RIP RAP CLASS "B" CM 462.12 28.07 1,290.52 445.18 2,225.89
509 f GROUTED RIP RAP CLASS "C" CM 455.30 23.39 1,317.62 449.08 2,245.39
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 648.85 181.56 2,845.45 918.97 4,594.83
509 h FILTER LAYER OF GRANULAR MATERIAL CM 37.21 115.89 386.17 134.82 674.09
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 82.94 194.57 - 69.38 346.89
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 127.55 35.01 60.10 55.67 278.33
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 163.27 44.81 76.93 71.25 356.26
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 207.67 91.01 255.99 138.67 693.34
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 259.59 113.77 319.99 173.34 866.69
603 BRICK EDGING M 7.43 - 24.96 8.10 40.49
605 a CONCRETE BEAM GUARDRAIL M 58.67 14.67 430.15 125.87 629.36
605 c CONCRETE POST FOR GUARDRAIL M 72.04 13.10 427.74 128.22 641.10
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 195.70 128.42 4,821.03 1,286.29 6,431.44
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 60.16 192.63 7,576.17 1,957.24 9,786.20
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 195.70 272.87 9,244.20 2,428.19 12,140.96
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 589.06 304.65 16,733.01 4,406.68 22,033.40
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 117.81 60.93 7,363.94 1,885.67 9,428.35
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 275.86 - 1,032.02 326.97 1,634.85
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 275.86 - 1,548.03 455.97 2,279.86
Page 34 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (25) Kalat
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.59 2.85 15.42 5.22 26.08
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.86 1.27 30.61 8.19 40.93
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.59 2.85 20.58 6.51 32.53
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.86 1.27 40.83 10.74 53.70
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 70.10 - 149.01 54.78 273.89
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 70.10 - 385.75 113.96 569.81
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.24 3.56 21.44 7.06 35.30
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.24 4.75 51.71 14.93 74.63
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.24 3.56 28.58 8.85 44.23
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.24 4.75 68.95 19.24 96.18
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 70.10 - 206.97 69.27 346.34
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 70.10 - 652.07 180.54 902.71
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 57.95 - 99.34 39.32 196.61
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 57.95 - 257.55 78.88 394.38
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 57.95 - 137.98 48.98 244.91
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 57.95 - 435.37 123.33 616.65
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.70 46.68 167.75 55.78 278.91
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.70 46.68 202.75 64.53 322.66
610 b RIGHT OF WAY MARKER EACH 79.03 60.88 215.58 88.87 444.36
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 523.27 476.40 1,451.88 612.89 3,064.44
610 d TEN KILOMETER POST EACH 1,006.03 952.79 3,176.03 1,283.71 6,418.56
Page 35 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.60 6.96 - 1.89 9.45
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.18 102.44 0.88 27.38 136.88
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 17.41 258.13 1.97 69.38 346.89
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 69.64 1,032.53 7.89 277.52 1,387.58
103 STRIPPING CM 2.27 59.42 - 15.42 77.11
104 COMPACTION OF NATURAL GROUND SM 0.32 5.92 0.62 1.72 8.58
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.24 86.79 - 22.76 113.79
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 112.28 193.76 46.20 88.06 440.30
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.26 214.84 - 57.53 287.63
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.14 167.12 - 44.32 221.58
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.47 78.63 - 20.53 102.63
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 112.28 193.76 46.20 88.06 440.30
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.84 199.88 - 54.43 272.15
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.77 167.24 - 43.75 218.76
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.97 89.04 0.31 24.08 120.40
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 55.88 165.86 53.31 68.76 343.81
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 99.12 258.51 30.80 97.11 485.54
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 83.41 193.04 - 69.11 345.56
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 50.98 160.37 - 52.84 264.19
107 d GRANULAR BACK FILL CM 29.27 83.07 301.79 103.53 517.66
107 e COMMON BACK FILL CM 20.72 37.31 4.13 15.54 77.70
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.29 106.71 4.13 29.28 146.41
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 17.93 302.97 48.81 92.43 462.14
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 13.45 268.11 1.96 70.88 354.40
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.95 238.60 - 62.64 313.19
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 7.07 112.14 6.81 31.51 157.53
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 36 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.65 46.31 4.13 14.02 70.11
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.86 73.87 2.45 22.30 111.48
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.26 16.84 1.18 4.82 24.10
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.93 10.31 0.63 2.97 14.84
110 IMPROVED SUB-GRADE CM 8.91 75.50 52.02 34.11 170.54
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.77 9.38 0.64 2.70 13.49
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.16 9.92 0.74 2.96 14.78
201 GRANULAR SUB-BASE CM 7.16 106.91 411.69 131.44 657.20
202 AGGREGATE BASE CM 8.33 132.11 493.91 158.59 792.94
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 60.55 916.98 3,358.88 1,084.10 5,420.51
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 62.85 916.98 3,588.04 1,141.97 5,709.84
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 67.69 957.74 3,353.52 1,094.74 5,473.69
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 67.69 954.75 3,670.86 1,173.33 5,866.63
204 b CEMENT STABLIZED BASE CM 25.13 272.73 614.30 228.04 1,140.20
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 218.57 568.44 22,429.80 5,804.20 29,021.01
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 218.57 568.44 21,609.72 5,599.18 27,995.91
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 77.09 55.65 521.92 163.67 818.33
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 127.48 1,408.67 3,014.34 1,137.62 5,688.11
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 84.06 66.68 430.00 145.19 725.93
207 a DEEP PATCHING (0-15 cm) SM 1.58 30.14 1.02 8.19 40.93
207 b DEEP PATCHING (16-30 cm) SM 1.58 26.47 1.02 7.27 36.34
208 REINSTATEMENT OF ROAD SURFACE SM 1.64 37.00 0.45 9.77 48.86
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.07 70.82 0.55 18.36 91.80
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.41 14.16 0.11 3.67 18.35
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 0.67 22.44 5.85 29.23
Page 37 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.44 5.84 29.21
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 9.97 2.58 12.90
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.64 2.25 11.24
304 a SINGLE SURFACE TREATMENT SM 0.69 4.16 42.57 11.86 59.28
304 b DOUBLE SURFACE TREATMENT SM 1.00 8.06 79.96 22.26 111.28
304 c TRIPPLE SURFACE TREATMENT SM 1.69 11.08 95.08 26.96 134.81
304 d SEAL COAT SM 0.63 2.33 25.56 7.13 35.65
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 57.78 906.07 3,940.63 1,226.12 6,130.60
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 57.78 876.73 4,253.54 1,297.01 6,485.06
307 a DENSE GRADED HOT BIT-MAC CM 139.22 171.48 3,240.20 887.73 4,438.63
307 b OPEN GRADED HOT BIT-MAC CM 139.22 171.48 3,139.16 862.47 4,312.33
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 24.85 456.95 888.58 342.60 1,712.98
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 194.58 465.97 24,403.50 6,266.01 31,330.06
309 a COLD MILLING, 0 - 30 mm SM 0.85 16.87 7.54 6.32 31.58
309 b COLD MILLING, 0 - 50 mm SM 1.41 28.11 12.57 10.52 52.61
309 c COLD MILLING, 0 - 70 mm SM 2.12 42.16 18.85 15.78 78.91
401 ai CONCRETE CLASS "A3" (Underground) CM 452.20 643.62 3,128.69 1,056.13 5,280.64
401 aii CONCRETE CLASS "A3" (Onground) CM 452.20 643.62 3,337.59 1,108.35 5,541.76
401 aiii CONCRETE CLASS "A3" (Elevated) CM 452.20 643.62 3,755.39 1,212.80 6,064.01
401 b CONCRETE CLASS "B" CM 586.43 407.09 2,343.44 834.24 4,171.20
401 ci CONCRETE CLASS "C" (Underground) CM 438.57 258.76 2,782.24 869.89 4,349.46
401 cii CONCRETE CLASS "C" (Onground) CM 438.57 258.76 2,871.34 892.17 4,460.84
401 ciii CONCRETE CLASS "C" (Elevated) CM 438.57 258.76 3,049.53 936.72 4,683.58
401 d CONCRETE CLASS "D1" CM 696.30 810.64 3,995.41 1,375.59 6,877.94
401 e CONCRETE CLASS "Y" CM 954.57 258.76 3,422.55 1,158.97 5,794.85
401 f LEAN CONCRETE CM 368.22 252.12 1,884.13 626.12 3,130.59
Page 38 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,447.59 468.57 3,925.49 1,460.41 7,302.06
401 gii PRECAST CONCRETE CLASS "B" CM 1,447.59 468.57 3,504.85 1,355.25 6,776.26
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,375.84 - 43,405.04 11,195.22 55,976.10
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,375.84 - 44,455.04 11,457.72 57,288.60
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,099.33 2,335.68 37,042.23 10,119.31 50,596.55
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,185.31 6,882.66 81,662.78 22,682.69 113,413.44
405 b LAUNCHING OF GIRDER TON 50.59 403.69 - 113.57 567.85
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 96.41 - 203.46 74.97 374.84
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 96.41 - 212.18 77.15 385.74
406 c STEEL EXPANSION JOINTS KG 7.85 11.61 59.73 19.80 98.99
406 d WATER STOPS 6" SIZE M 85.35 - 307.27 98.16 490.78
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 33.39 - 1,417.09 362.62 1,813.10
406 g STEEL OR METAL BEARING DEVICES KG 16.58 30.66 80.31 31.89 159.44
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 274.91 847.08 772.52 473.63 2,368.14
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 412.37 1,270.62 1,158.78 710.44 3,552.21
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 412.37 1,270.62 860.74 635.93 3,179.66
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 687.29 2,117.70 1,022.43 956.86 4,784.28
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 589.10 1,815.17 964.68 842.24 4,211.19
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,030.93 3,176.55 1,301.81 1,377.32 6,886.61
407 h PILE LOAD TEST UPTO 120 TON EACH 20,906.10 19,990.40 74,100.44 28,749.24 143,746.18
407 i PILE LOAD TEST UPTO 240 TON EACH 33,361.38 19,990.40 148,200.88 50,388.17 251,940.83
407 j PILE LOAD TEST UPTO 360 TON EACH 50,166.90 19,990.40 222,301.32 73,114.66 365,573.28
407 k CONFIRMATORY BORING (NX SIZE) M 155.06 826.61 5.16 246.71 1,233.54
410 BRICK WORK CM 266.81 142.50 2,147.94 639.31 3,196.56
411 a STONE MASONRY RANDOM DRY CM 287.45 56.01 477.65 205.28 1,026.39
Page 39 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 339.34 84.89 1,272.30 424.13 2,120.66
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 390.59 56.01 530.40 244.25 1,221.25
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 441.85 84.89 1,314.08 460.21 2,301.03
411 g ROLL POINTING SM 55.92 5.78 46.97 27.17 135.84
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 580.00 134.30 1,242.71 489.25 2,446.26
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 187.43 230.36 400.80 204.65 1,023.24
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 181.63 297.19 516.30 248.78 1,243.90
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 181.17 514.83 637.15 333.29 1,666.44
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 188.57 639.81 955.68 446.02 2,230.08
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 217.57 704.13 1,291.22 553.23 2,766.15
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 269.25 868.93 1,946.32 771.13 3,855.63
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 348.44 961.94 2,435.37 936.44 4,682.19
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 411.05 1,168.07 3,400.50 1,244.91 6,224.53
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 485.28 1,362.74 5,157.05 1,751.27 8,756.34
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 187.43 263.77 425.69 219.22 1,096.11
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 181.63 297.19 552.38 257.80 1,289.00
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 176.17 514.83 666.01 339.25 1,696.26
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 188.57 639.81 1,022.02 462.60 2,313.00
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 217.57 704.13 1,803.10 681.20 3,406.00
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 269.25 868.93 2,455.05 898.31 4,491.54
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 348.44 961.94 3,128.10 1,109.62 5,548.10
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 411.05 1,168.07 4,089.06 1,417.05 7,085.23
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 485.28 1,362.74 5,632.34 1,870.09 9,350.45
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 76.73 68.08 300.81 111.41 557.03
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 666.12 309.47 2,396.55 843.04 4,215.18
507 a STEEL WIRE MESH FOR GABIONS KG 4.53 - 73.81 19.59 97.93
Page 40 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 80.66 - 389.38 117.51 587.55
508 a BRICK PAVING (SINGLE COURSE) SM 89.14 15.80 168.15 68.27 341.36
508 b BRICK PAVING (DOUBLE COURSE) SM 157.90 15.80 333.62 126.83 634.15
509 a RIP RAP CLASS "A" CM 384.48 - 406.28 197.69 988.45
509 b RIP RAP CLASS "B" CM 369.59 - 403.02 193.15 965.76
509 c RIP RAP CLASS "C" CM 370.92 - 406.28 194.30 971.50
509 d GROUTED RIP RAP CLASS "A" CM 452.27 35.09 1,503.97 497.83 2,489.16
509 e GROUTED RIP RAP CLASS "B" CM 434.72 28.07 1,386.76 462.39 2,311.94
509 f GROUTED RIP RAP CLASS "C" CM 428.42 23.39 1,420.10 467.98 2,339.89
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 657.36 181.56 2,763.92 900.71 4,503.55
509 h FILTER LAYER OF GRANULAR MATERIAL CM 40.63 115.89 302.12 114.66 573.30
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 85.21 194.57 - 69.95 349.73
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 124.23 35.01 66.02 56.32 281.58
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 159.02 44.81 84.51 72.09 360.43
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 200.02 91.01 250.37 135.35 676.75
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 250.03 113.77 312.97 169.19 845.96
603 BRICK EDGING M 7.38 - 26.40 8.45 42.23
605 a CONCRETE BEAM GUARDRAIL M 60.66 14.67 425.65 125.25 626.23
605 c CONCRETE POST FOR GUARDRAIL M 74.48 13.10 422.38 127.49 637.45
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 193.43 128.42 4,820.29 1,285.54 6,427.68
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 60.55 192.63 7,574.36 1,956.89 9,784.43
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 193.43 272.87 9,237.13 2,425.86 12,129.29
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 621.47 304.65 16,733.79 4,414.98 22,074.89
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 124.29 60.93 7,377.76 1,890.75 9,453.73
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 244.16 - 1,036.12 320.07 1,600.35
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 244.16 - 1,554.18 449.59 2,247.93
Page 41 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (31) Kharan
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.48 2.85 15.45 5.20 25.98
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.82 1.27 30.85 8.24 41.18
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.47 2.85 20.62 6.49 32.43
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.82 1.27 41.14 10.81 54.04
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 61.32 - 149.29 52.65 263.26
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 61.32 - 388.73 112.51 562.56
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.09 3.56 21.47 7.03 35.15
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.09 4.75 51.71 14.89 74.44
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.09 3.56 28.62 8.82 44.09
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.09 4.75 68.95 19.20 95.99
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 61.32 - 207.25 67.14 335.71
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 61.32 - 652.07 178.35 891.74
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 51.19 - 99.53 37.68 188.40
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 51.19 - 259.54 77.68 388.41
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 51.19 - 138.17 47.34 236.70
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 51.19 - 435.37 121.64 608.20
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.50 46.68 167.66 55.71 278.55
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.50 46.68 202.66 64.46 322.30
610 b RIGHT OF WAY MARKER EACH 84.88 60.88 211.78 89.39 446.93
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 515.15 476.40 1,427.89 604.86 3,024.30
610 d TEN KILOMETER POST EACH 996.55 952.79 3,112.17 1,265.38 6,326.89
Page 42 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.59 102.44 0.88 27.23 136.14
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.57 258.13 1.97 68.92 344.59
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.27 1,032.53 7.89 275.67 1,378.36
103 STRIPPING CM 2.11 59.42 - 15.38 76.91
104 COMPACTION OF NATURAL GROUND SM 0.30 5.92 0.62 1.71 8.55
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.01 86.79 - 22.70 113.50
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 103.73 193.76 46.20 85.92 429.61
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.12 214.84 - 57.24 286.20
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.44 167.12 - 44.14 220.70
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.28 78.63 - 20.48 102.39
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 103.73 193.76 46.20 85.92 429.61
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.46 199.88 - 54.09 270.43
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.24 167.24 - 43.62 218.10
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.69 89.04 0.31 24.01 120.05
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 53.05 165.86 53.31 68.06 340.28
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 91.42 258.51 30.80 95.18 475.91
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 76.79 193.04 - 67.46 337.29
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 47.01 160.37 - 51.85 259.23
107 d GRANULAR BACK FILL CM 26.30 83.07 336.16 111.38 556.91
107 e COMMON BACK FILL CM 18.21 37.31 4.13 14.91 74.56
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.92 106.71 4.13 29.19 145.95
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 16.61 302.97 48.81 92.10 460.49
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 12.45 268.11 1.96 70.63 353.15
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.07 238.60 - 62.42 312.09
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.59 112.14 6.81 31.39 156.93
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 43 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.33 46.31 4.13 13.94 69.71
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.93 73.87 2.45 22.06 110.31
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.17 16.84 1.18 4.80 23.99
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.88 10.31 0.63 2.96 14.78
110 IMPROVED SUB-GRADE CM 8.32 75.50 46.01 32.46 162.29
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.72 9.38 0.64 2.69 13.43
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.10 9.92 0.64 2.92 14.58
201 GRANULAR SUB-BASE CM 6.67 106.91 394.69 127.07 635.34
202 AGGREGATE BASE CM 7.76 132.11 483.45 155.83 779.15
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 54.26 916.98 3,339.55 1,077.70 5,388.49
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 56.41 916.98 3,569.81 1,135.80 5,679.00
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 60.97 957.74 3,334.20 1,088.23 5,441.14
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 60.97 954.75 3,652.60 1,167.08 5,835.40
204 b CEMENT STABLIZED BASE CM 23.20 272.73 595.81 222.94 1,114.68
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 202.82 568.44 22,378.80 5,787.52 28,937.58
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 202.82 568.44 21,558.72 5,582.50 27,912.48
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 67.72 55.65 510.87 158.56 792.80
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 116.44 1,408.67 2,997.28 1,130.60 5,652.99
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 73.29 66.68 439.03 144.75 723.75
207 a DEEP PATCHING (0-15 cm) SM 1.49 30.14 1.02 8.16 40.81
207 b DEEP PATCHING (16-30 cm) SM 1.49 26.47 1.02 7.25 36.23
208 REINSTATEMENT OF ROAD SURFACE SM 1.53 37.00 0.45 9.75 48.73
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.00 70.82 0.55 18.34 91.71
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.40 14.16 0.11 3.67 18.34
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 0.67 22.39 5.83 29.14
Page 44 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.39 5.83 29.13
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 9.95 2.57 12.86
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 8.62 2.24 11.20
304 a SINGLE SURFACE TREATMENT SM 0.63 4.16 42.38 11.79 58.96
304 b DOUBLE SURFACE TREATMENT SM 0.93 8.06 79.55 22.14 110.68
304 c TRIPPLE SURFACE TREATMENT SM 1.58 11.08 94.55 26.80 134.01
304 d SEAL COAT SM 0.58 2.33 25.46 7.09 35.46
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 52.27 906.07 3,920.89 1,219.81 6,099.04
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 52.27 876.73 4,232.29 1,290.32 6,451.61
307 a DENSE GRADED HOT BIT-MAC CM 125.92 171.48 3,221.26 879.67 4,398.33
307 b OPEN GRADED HOT BIT-MAC CM 125.92 171.48 3,121.75 854.79 4,273.94
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mmTHICK) CM 23.09 456.95 885.57 341.40 1,707.01
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 180.42 465.97 24,352.50 6,249.72 31,248.61
309 a COLD MILLING, 0 - 30 mm SM 0.79 16.87 7.54 6.30 31.50
309 b COLD MILLING, 0 - 50 mm SM 1.31 28.11 12.57 10.50 52.49
309 c COLD MILLING, 0 - 70 mm SM 1.97 42.16 18.85 15.75 78.73
401 ai CONCRETE CLASS "A3" (Underground) CM 440.65 643.62 3,170.82 1,063.77 5,318.86
401 aii CONCRETE CLASS "A3" (Onground) CM 440.65 643.62 3,379.72 1,116.00 5,579.99
401 aiii CONCRETE CLASS "A3" (Elevated) CM 440.65 643.62 3,797.52 1,220.45 6,102.24
401 b CONCRETE CLASS "B" CM 556.39 407.09 2,350.73 828.55 4,142.76
401 ci CONCRETE CLASS "C" (Underground) CM 423.17 258.76 2,814.68 874.15 4,370.76
401 cii CONCRETE CLASS "C" (Onground) CM 423.17 258.76 2,903.78 896.43 4,482.14
401 ciii CONCRETE CLASS "C" (Elevated) CM 423.17 258.76 3,081.97 940.98 4,704.88
401 d CONCRETE CLASS "D1" CM 685.28 810.64 4,093.50 1,397.36 6,986.78
401 e CONCRETE CLASS "Y" CM 931.75 258.76 3,489.03 1,169.89 5,849.43
401 f LEAN CONCRETE CM 339.92 252.12 1,868.97 615.25 3,076.26
Page 45 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,371.81 468.57 3,962.79 1,450.79 7,253.96
401 gii PRECAST CONCRETE CLASS "B" CM 1,371.81 468.57 3,512.99 1,338.34 6,691.71
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,358.02 - 43,932.77 11,322.70 56,613.49
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,358.02 - 44,982.77 11,585.20 57,925.99
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,080.92 2,335.68 37,324.11 10,185.18 50,925.89
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,036.61 6,882.66 81,668.16 22,646.86 113,234.29
405 b LAUNCHING OF GIRDER TON 47.23 403.69 - 112.73 563.65
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 92.14 - 193.60 71.44 357.18
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 92.14 - 202.31 73.61 368.06
406 c STEEL EXPANSION JOINTS KG 7.56 11.61 60.63 19.95 99.75
406 d WATER STOPS 6" SIZE M 84.72 - 306.03 97.69 488.44
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 31.46 - 1,414.14 361.40 1,807.00
406 g STEEL OR METAL BEARING DEVICES KG 15.04 30.66 81.05 31.69 158.44
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 258.45 847.08 694.75 450.07 2,250.35
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 387.67 1,270.62 1,042.13 675.11 3,375.53
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 387.67 1,270.62 777.89 609.05 3,045.23
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 646.12 2,117.70 929.81 923.41 4,617.04
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 553.82 1,815.17 875.55 811.14 4,055.68
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 969.18 3,176.55 1,188.46 1,333.55 6,667.74
407 h PILE LOAD TEST UPTO 120 TON EACH 20,688.00 19,990.40 78,762.68 29,860.27 149,301.35
407 i PILE LOAD TEST UPTO 240 TON EACH 28,752.72 19,990.40 157,525.36 51,567.12 257,835.60
407 j PILE LOAD TEST UPTO 360 TON EACH 43,188.00 19,990.40 236,288.04 74,866.61 374,333.05
407 k CONFIRMATORY BORING (NX SIZE) M 139.54 826.61 5.16 242.83 1,214.14
410 BRICK WORK CM 250.78 142.50 2,107.28 625.14 3,125.70
411 a STONE MASONRY RANDOM DRY CM 271.16 56.01 571.38 224.64 1,123.19
Page 46 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 318.04 84.89 1,340.85 435.95 2,179.73
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 366.79 56.01 631.63 263.61 1,318.04
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 415.54 84.89 1,403.62 476.01 2,380.06
411 g ROLL POINTING SM 52.85 5.78 46.87 26.38 131.88
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 541.17 134.30 1,332.25 501.93 2,509.65
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 167.07 230.36 400.66 199.52 997.61
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 161.59 297.19 516.12 243.73 1,218.63
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 163.53 514.83 636.77 328.78 1,643.91
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 169.12 639.81 955.34 441.07 2,205.34
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 194.97 704.13 1,290.88 547.50 2,737.48
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 241.76 868.93 1,945.99 764.17 3,820.85
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 312.86 961.94 2,435.40 927.55 4,637.75
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 367.85 1,168.07 3,400.54 1,234.12 6,170.58
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 434.89 1,362.74 5,157.09 1,738.68 8,693.40
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 167.07 263.77 423.55 213.60 1,067.99
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 161.59 297.19 552.20 252.75 1,263.73
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 158.53 514.83 665.63 334.75 1,673.74
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 169.12 639.81 1,021.68 457.65 2,288.26
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 194.97 704.13 1,803.13 675.56 3,377.79
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 241.76 868.93 2,454.72 891.35 4,456.76
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 312.86 961.94 3,128.13 1,100.73 5,503.66
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 367.85 1,168.07 4,089.09 1,406.25 7,031.26
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 434.89 1,362.74 5,632.39 1,857.51 9,287.53
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.78 68.08 364.39 125.31 626.56
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 641.19 309.47 2,407.40 839.52 4,197.58
507 a STEEL WIRE MESH FOR GABIONS KG 4.22 - 73.81 19.51 97.54
Page 47 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 71.47 - 399.06 117.63 588.16
508 a BRICK PAVING (SINGLE COURSE) SM 82.44 15.80 167.97 66.55 332.76
508 b BRICK PAVING (DOUBLE COURSE) SM 146.19 15.80 332.74 123.68 618.41
509 a RIP RAP CLASS "A" CM 357.69 - 500.00 214.42 1,072.11
509 b RIP RAP CLASS "B" CM 343.15 - 496.00 209.79 1,048.94
509 c RIP RAP CLASS "C" CM 344.71 - 500.00 211.18 1,055.89
509 d GROUTED RIP RAP CLASS "A" CM 415.00 35.09 1,481.57 482.92 2,414.58
509 e GROUTED RIP RAP CLASS "B" CM 399.51 28.07 1,375.86 450.86 2,254.30
509 f GROUTED RIP RAP CLASS "C" CM 393.68 23.39 1,401.12 454.55 2,272.74
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 617.62 181.56 2,810.83 902.50 4,512.51
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.35 115.89 336.72 122.24 611.20
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 77.46 194.57 - 68.01 340.04
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 115.62 35.01 81.25 57.97 289.85
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 147.99 44.81 104.00 74.20 371.00
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 186.99 91.01 263.80 135.45 677.25
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 233.74 113.77 329.75 169.32 846.58
603 BRICK EDGING M 6.81 - 25.92 8.18 40.91
605 a CONCRETE BEAM GUARDRAIL M 55.23 14.67 429.86 124.94 624.70
605 c CONCRETE POST FOR GUARDRAIL M 67.82 13.10 427.24 127.04 635.20
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 176.50 128.42 4,824.37 1,282.32 6,411.61
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 58.67 192.63 7,567.82 1,954.78 9,773.90
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 176.50 272.87 9,231.57 2,420.24 12,101.18
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 553.50 304.65 16,711.93 4,392.52 21,962.60
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 110.70 60.93 7,357.16 1,882.20 9,410.99
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 231.56 - 1,031.25 315.70 1,578.51
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 231.56 - 1,546.87 444.61 2,223.04
Page 48 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (33) Khuzdar
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.16 2.85 15.42 5.11 25.54
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.72 1.27 30.56 8.14 40.69
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.16 2.85 20.57 6.40 31.98
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.72 1.27 40.76 10.69 53.44
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 58.37 - 148.95 51.83 259.15
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 58.37 - 385.15 110.88 554.40
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.71 3.56 21.43 6.93 34.63
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.71 4.75 51.71 14.79 73.96
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.71 3.56 28.57 8.71 43.55
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.71 4.75 68.95 19.10 95.51
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 58.37 - 206.91 66.32 331.60
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 58.37 - 652.07 177.61 888.05
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 48.24 - 99.30 36.89 184.43
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 48.24 - 257.16 76.35 381.75
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 48.24 - 137.94 46.55 232.73
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 48.24 - 435.37 120.90 604.51
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.50 46.68 167.74 55.73 278.65
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.50 46.68 202.74 64.48 322.40
610 b RIGHT OF WAY MARKER EACH 76.11 60.88 214.24 87.81 439.04
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 475.05 476.40 1,434.07 596.38 2,981.90
610 d TEN KILOMETER POST EACH 916.36 952.79 3,155.98 1,256.28 6,281.41
Page 49 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.56 6.96 - 1.88 9.40
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.66 102.44 0.88 27.25 136.23
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.23 258.13 1.97 69.08 345.41
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 64.91 1,032.53 7.89 276.33 1,381.66
103 STRIPPING CM 2.02 59.42 - 15.36 76.80
104 COMPACTION OF NATURAL GROUND SM 0.29 5.92 0.62 1.71 8.54
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.54 86.79 - 22.58 112.91
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 96.86 193.76 46.20 84.21 421.03
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.54 214.84 - 57.10 285.48
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.01 167.12 - 44.03 220.16
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.89 78.63 - 20.38 101.90
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 96.86 193.76 46.20 84.21 421.03
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 15.41 199.88 - 53.82 269.11
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.88 167.24 - 43.53 217.65
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.01 89.04 0.31 23.84 119.20
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 50.11 165.86 53.31 67.32 336.60
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 85.58 258.51 30.80 93.72 468.61
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 72.38 193.04 - 66.36 331.78
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 44.01 160.37 - 51.10 255.48
107 d GRANULAR BACK FILL CM 26.68 83.07 459.47 142.31 711.53
107 e COMMON BACK FILL CM 19.68 37.31 4.13 15.28 76.40
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.57 106.71 4.13 29.10 145.51
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.98 302.97 48.81 91.94 459.70
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.99 268.11 1.96 70.52 352.58
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.66 238.60 - 62.32 311.58
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.35 112.14 6.81 31.33 156.63
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 50 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.96 46.31 4.13 13.85 69.25
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.62 73.87 2.45 21.99 109.93
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.11 16.84 1.18 4.78 23.91
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.81 10.31 0.63 2.94 14.69
110 IMPROVED SUB-GRADE CM 7.99 75.50 46.24 32.43 162.16
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.67 9.38 0.64 2.67 13.36
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.03 9.92 0.74 2.92 14.61
201 GRANULAR SUB-BASE CM 6.38 106.91 449.73 140.76 703.78
202 AGGREGATE BASE CM 7.36 132.11 525.25 166.18 830.90
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 57.88 916.98 3,385.18 1,090.01 5,450.05
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 60.09 916.98 3,624.50 1,150.39 5,751.96
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 64.40 957.74 3,379.79 1,100.48 5,502.41
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 64.40 954.75 3,707.66 1,181.70 5,908.51
204 b CEMENT STABLIZED BASE CM 22.51 272.73 610.98 226.56 1,132.78
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 190.37 568.44 22,684.80 5,860.90 29,304.51
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 190.37 568.44 21,864.72 5,655.88 28,279.41
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 74.70 55.65 555.01 171.34 856.70
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 119.49 1,408.67 3,059.50 1,146.92 5,734.58
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 81.94 66.68 469.09 154.43 772.14
207 a DEEP PATCHING (0-15 cm) SM 1.37 30.14 1.02 8.13 40.66
207 b DEEP PATCHING (16-30 cm) SM 1.37 26.47 1.02 7.22 36.08
208 REINSTATEMENT OF ROAD SURFACE SM 1.41 37.00 0.45 9.72 48.58
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.71 70.82 0.55 18.27 91.35
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.34 14.16 0.11 3.65 18.26
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.69 5.90 29.49
Page 51 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.69 5.90 29.49
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 10.07 2.60 13.00
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.75 2.27 11.35
304 a SINGLE SURFACE TREATMENT SM 0.59 4.16 43.22 11.99 59.96
304 b DOUBLE SURFACE TREATMENT SM 0.87 8.06 81.48 22.60 113.01
304 c TRIPPLE SURFACE TREATMENT SM 1.47 11.08 96.96 27.38 136.89
304 d SEAL COAT SM 0.54 2.33 25.74 7.15 35.76
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.87 906.07 3,974.90 1,233.96 6,169.80
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.87 876.73 4,288.41 1,305.00 6,525.01
307 a DENSE GRADED HOT BIT-MAC CM 131.68 171.48 3,264.21 891.84 4,459.21
307 b OPEN GRADED HOT BIT-MAC CM 131.68 171.48 3,176.42 869.90 4,349.48
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.88 456.95 900.00 345.21 1,726.04
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 167.34 465.97 24,658.50 6,322.95 31,614.76
309 a COLD MILLING, 0 - 30 mm SM 0.76 16.87 7.54 6.29 31.46
309 b COLD MILLING, 0 - 50 mm SM 1.26 28.11 12.57 10.49 52.43
309 c COLD MILLING, 0 - 70 mm SM 1.89 42.16 18.85 15.73 78.63
401 ai CONCRETE CLASS "A3" (Underground) CM 401.19 643.62 3,119.94 1,041.19 5,205.94
401 aii CONCRETE CLASS "A3" (Onground) CM 401.19 643.62 3,328.84 1,093.41 5,467.06
401 aiii CONCRETE CLASS "A3" (Elevated) CM 401.19 643.62 3,746.64 1,197.86 5,989.31
401 b CONCRETE CLASS "B" CM 527.28 407.09 2,360.47 823.71 4,118.55
401 ci CONCRETE CLASS "C" (Underground) CM 394.50 258.76 2,791.20 861.12 4,305.58
401 cii CONCRETE CLASS "C" (Onground) CM 394.50 258.76 2,880.30 883.39 4,416.95
401 ciii CONCRETE CLASS "C" (Elevated) CM 394.50 258.76 3,058.49 927.94 4,639.69
401 d CONCRETE CLASS "D1" CM 614.84 810.64 3,990.93 1,354.10 6,770.51
401 e CONCRETE CLASS "Y" CM 845.24 258.76 3,406.07 1,127.52 5,637.59
401 f LEAN CONCRETE CM 341.44 252.12 1,901.03 623.65 3,118.24
Page 52 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,308.91 468.57 3,913.65 1,422.78 7,113.91
401 gii PRECAST CONCRETE CLASS "B" CM 1,308.91 468.57 3,524.68 1,325.54 6,627.70
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,211.08 - 44,993.01 11,551.02 57,755.11
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,211.08 - 46,043.01 11,813.52 59,067.61
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 969.08 2,335.68 38,378.46 10,420.81 52,104.03
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,972.77 6,882.66 81,681.01 22,634.11 113,170.55
405 b LAUNCHING OF GIRDER TON 46.00 403.69 - 112.42 562.11
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 86.13 - 205.68 72.95 364.76
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 86.13 - 214.40 75.13 375.66
406 c STEEL EXPANSION JOINTS KG 6.90 11.61 61.81 20.08 100.40
406 d WATER STOPS 6" SIZE M 76.88 - 307.52 96.10 480.50
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 28.76 - 1,417.91 361.67 1,808.34
406 g STEEL OR METAL BEARING DEVICES KG 14.67 30.66 82.03 31.84 159.20
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 245.48 847.08 698.16 447.68 2,238.40
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 368.22 1,270.62 1,047.24 671.52 3,357.60
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 368.22 1,270.62 783.36 605.55 3,027.75
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 613.70 2,117.70 938.93 917.58 4,587.91
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 526.03 1,815.17 883.37 806.14 4,030.71
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 920.55 3,176.55 1,202.15 1,324.81 6,624.06
407 h PILE LOAD TEST UPTO 120 TON EACH 20,325.06 19,990.40 94,303.48 33,654.74 168,273.68
407 i PILE LOAD TEST UPTO 240 TON EACH 33,108.18 19,990.40 188,606.96 60,426.39 302,131.93
407 j PILE LOAD TEST UPTO 360 TON EACH 49,585.86 19,990.40 282,910.44 88,121.68 440,608.38
407 k CONFIRMATORY BORING (NX SIZE) M 144.53 826.61 5.16 244.08 1,220.38
410 BRICK WORK CM 237.65 142.50 2,142.29 630.61 3,153.05
411 a STONE MASONRY RANDOM DRY CM 257.06 56.01 456.86 192.48 962.41
Page 53 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 305.87 84.89 1,244.45 408.80 2,044.01
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 350.98 56.01 507.95 228.74 1,143.68
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 396.08 84.89 1,286.33 409.74 2,177.04
411 g ROLL POINTING SM 49.53 5.78 46.85 25.54 127.70
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 525.00 134.30 1,214.96 468.57 2,342.83
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 177.50 230.36 400.58 202.11 1,010.55
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 172.86 297.19 516.04 246.52 1,232.61
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 168.24 514.83 636.84 329.98 1,649.89
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 176.81 639.81 955.32 442.99 2,214.93
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 205.29 704.13 1,290.86 550.07 2,750.35
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 253.64 868.93 1,945.80 767.09 3,835.46
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 328.24 961.94 2,434.85 931.26 4,656.29
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 388.72 1,168.07 3,399.87 1,239.17 6,195.83
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 456.68 1,362.74 5,156.31 1,743.93 8,719.66
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 177.50 263.77 425.24 216.63 1,083.14
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 172.86 297.19 552.12 255.54 1,277.71
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 163.24 514.83 665.70 335.94 1,679.71
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 176.81 639.81 1,021.74 459.59 2,297.95
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 205.29 704.13 1,802.70 678.03 3,390.15
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 253.64 868.93 2,454.53 894.28 4,471.38
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 328.24 961.94 3,127.58 1,104.44 5,522.20
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 388.72 1,168.07 4,088.43 1,411.31 7,056.53
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 456.68 1,362.74 5,631.61 1,862.76 9,313.79
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 71.39 68.08 490.48 157.49 787.44
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 599.53 309.47 2,413.59 830.65 4,153.24
507 a STEEL WIRE MESH FOR GABIONS KG 4.04 - 69.82 18.47 92.33
Page 54 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 76.87 - 400.41 119.32 596.60
508 a BRICK PAVING (SINGLE COURSE) SM 81.52 15.80 179.63 69.24 346.19
508 b BRICK PAVING (DOUBLE COURSE) SM 144.13 15.80 354.28 128.55 642.76
509 a RIP RAP CLASS "A" CM 347.73 - 385.49 183.31 916.53
509 b RIP RAP CLASS "B" CM 335.27 - 382.40 179.42 897.09
509 c RIP RAP CLASS "C" CM 336.17 - 385.49 180.42 902.08
509 d GROUTED RIP RAP CLASS "A" CM 368.14 35.09 1,404.62 451.96 2,259.81
509 e GROUTED RIP RAP CLASS "B" CM 353.92 28.07 1,295.99 419.50 2,097.48
509 f GROUTED RIP RAP CLASS "C" CM 348.94 23.39 1,319.86 423.05 2,115.24
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 606.46 181.56 2,780.05 892.02 4,460.09
509 h FILTER LAYER OF GRANULAR MATERIAL CM 39.11 115.89 460.74 153.94 769.68
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 79.09 194.57 - 68.42 342.08
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 112.33 35.01 62.64 52.50 262.48
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 143.78 44.81 - 47.15 235.74
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 179.86 91.01 257.94 132.20 661.01
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 224.83 113.77 322.43 165.26 826.29
603 BRICK EDGING M 6.73 - 26.40 8.28 41.41
605 a CONCRETE BEAM GUARDRAIL M 56.85 14.67 432.25 125.94 629.71
605 c CONCRETE POST FOR GUARDRAIL M 69.80 13.10 429.52 128.11 640.53
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 175.55 128.42 4,825.90 1,282.47 6,412.34
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.37 192.63 7,581.09 1,957.27 9,786.36
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 175.55 272.87 9,247.78 2,424.05 12,120.25
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 588.49 304.65 16,752.45 4,411.40 22,056.99
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 117.70 60.93 7,384.71 1,890.84 9,454.18
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 205.58 - 1,037.08 310.67 1,553.33
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 205.58 - 1,555.62 440.30 2,201.50
Page 55 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
Rate Analysis Summary ( Construction)
District (36) Kohlu
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 1.96 2.85 15.46 5.07 25.34
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.65 1.27 30.63 8.14 40.69
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 1.96 2.85 20.63 6.36 31.80
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.65 1.27 40.85 10.69 53.46
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 48.70 - 149.36 49.52 247.58
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 48.70 - 385.95 108.66 543.31
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.45 3.56 21.47 6.87 34.35
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.45 4.75 51.71 14.73 73.64
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.45 3.56 28.63 8.66 43.30
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.45 4.75 68.95 19.04 95.19
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 48.70 - 207.32 64.01 320.03
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 48.70 - 652.07 175.19 875.96
608 n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR STOP EACH 40.60 - 99.57 35.04 175.21
608 n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR STOP EACH 40.60 - 257.69 74.57 372.86
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 40.60 - 138.21 44.70 223.51
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 40.60 - 435.37 118.99 594.96
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.58 46.68 167.65 55.48 277.39
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.58 46.68 202.65 64.23 321.14
610 b RIGHT OF WAY MARKER EACH 81.10 60.88 212.96 88.74 443.68
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 469.93 476.40 1,444.11 597.61 2,988.05
610 d TEN KILOMETER POST EACH 912.25 952.79 3,144.93 1,252.49 6,262.46
Page 56 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.59 6.96 - 1.89 9.44
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.92 102.44 0.88 27.31 136.55
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.96 258.13 1.97 69.27 346.33
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 67.86 1,032.53 7.89 277.07 1,385.35
103 STRIPPING CM 2.12 59.42 - 15.39 76.93
104 COMPACTION OF NATURAL GROUND SM 0.31 5.92 0.62 1.71 8.56
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.81 86.79 - 22.65 113.25
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 101.45 193.76 46.20 85.35 426.76
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.53 214.84 - 57.09 285.46
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.05 167.12 - 44.04 220.21
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.11 78.63 - 20.44 102.18
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 101.45 193.76 46.20 85.35 426.76
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.15 199.88 - 54.01 270.04
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.83 167.24 - 43.52 217.59
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.16 89.04 0.31 23.88 119.39
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 50.66 165.86 53.31 67.46 337.29
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 89.70 258.51 30.80 94.75 473.76
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 75.35 193.04 - 67.10 335.49
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 46.13 160.37 - 51.63 258.13
107 d GRANULAR BACK FILL CM 28.31 83.07 316.07 106.86 534.31
107 e COMMON BACK FILL CM 20.98 37.31 4.13 15.61 78.03
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.54 106.71 4.13 29.10 145.48
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 16.27 302.97 48.81 92.01 460.06
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 12.20 268.11 1.96 70.57 352.84
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.85 238.60 - 62.36 311.81
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.35 112.14 6.81 31.33 156.63
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 57 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.99 46.31 4.13 13.86 69.29
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.77 73.87 2.45 22.02 110.11
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.13 16.84 1.18 4.79 23.94
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.83 10.31 0.63 2.94 14.71
110 IMPROVED SUB-GRADE CM 7.90 75.50 51.86 33.82 169.08
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.70 9.38 0.64 2.68 13.40
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.03 9.92 0.74 2.92 14.61
201 GRANULAR SUB-BASE CM 6.41 106.91 381.46 123.70 618.48
202 AGGREGATE BASE CM 7.17 132.11 525.25 166.13 830.66
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 58.14 916.98 3,389.84 1,091.24 5,456.20
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 60.13 916.98 3,616.73 1,148.46 5,742.30
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 64.85 957.74 3,384.51 1,101.78 5,508.88
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 64.85 954.75 3,699.30 1,179.73 5,898.63
204 b CEMENT STABLIZED BASE CM 22.12 272.73 655.27 237.53 1,187.65
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 208.98 568.44 22,276.80 5,763.56 28,817.78
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 208.98 568.44 21,456.72 5,558.54 27,792.68
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 77.49 55.65 555.04 172.05 860.23
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 118.49 1,408.67 3,048.68 1,143.96 5,719.80
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 85.07 66.68 500.46 163.05 815.26
207 a DEEP PATCHING (0-15 cm) SM 1.40 30.14 1.02 8.14 40.70
207 b DEEP PATCHING (16-30 cm) SM 1.40 26.47 1.02 7.22 36.11
208 REINSTATEMENT OF ROAD SURFACE SM 1.41 37.00 0.45 9.72 48.58
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.88 70.82 0.55 18.31 91.56
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.38 14.16 0.11 3.66 18.31
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.28 5.80 28.99
Page 58 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.28 5.80 28.99
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 9.91 2.56 12.81
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 8.58 2.23 11.15
304 a SINGLE SURFACE TREATMENT SM 0.63 4.16 42.46 11.81 59.06
304 b DOUBLE SURFACE TREATMENT SM 0.91 8.06 79.96 22.23 111.16
304 c TRIPPLE SURFACE TREATMENT SM 1.53 11.08 95.23 26.96 134.80
304 d SEAL COAT SM 0.58 2.33 25.48 7.10 35.49
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.43 906.07 3,969.01 1,232.38 6,161.89
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.43 876.73 4,282.74 1,303.48 6,517.38
307 a DENSE GRADED HOT BIT-MAC CM 128.14 171.48 3,278.94 894.64 4,473.20
307 b OPEN GRADED HOT BIT-MAC CM 128.14 171.48 3,178.84 869.62 4,348.08
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.27 456.95 900.44 344.67 1,723.33
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 188.19 465.97 24,352.50 6,251.67 31,258.33
309 a COLD MILLING, 0 - 30 mm SM 0.76 16.87 7.54 6.29 31.46
309 b COLD MILLING, 0 - 50 mm SM 1.26 28.11 12.57 10.49 52.43
309 c COLD MILLING, 0 - 70 mm SM 1.89 42.16 18.85 15.73 78.63
401 ai CONCRETE CLASS "A3" (Underground) CM 373.24 643.62 3,196.82 1,053.42 5,267.10
401 aii CONCRETE CLASS "A3" (Onground) CM 373.24 643.62 3,405.72 1,105.65 5,528.23
401 aiii CONCRETE CLASS "A3" (Elevated) CM 373.24 643.62 3,823.52 1,210.10 6,050.48
401 b CONCRETE CLASS "B" CM 512.39 407.09 2,361.68 820.29 4,101.45
401 ci CONCRETE CLASS "C" (Underground) CM 373.07 258.76 2,855.81 871.91 4,359.55
401 cii CONCRETE CLASS "C" (Onground) CM 373.07 258.76 2,944.91 894.19 4,470.93
401 ciii CONCRETE CLASS "C" (Elevated) CM 373.07 258.76 3,123.10 938.73 4,693.66
401 d CONCRETE CLASS "D1" CM 568.80 810.64 4,135.71 1,378.79 6,893.94
401 e CONCRETE CLASS "Y" CM 811.50 258.76 3,523.45 1,148.43 5,742.14
401 f LEAN CONCRETE CM 340.44 252.12 1,873.08 616.41 3,082.05
Page 59 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,283.07 468.57 3,989.01 1,435.16 7,175.81
401 gii PRECAST CONCRETE CLASS "B" CM 1,283.07 468.57 3,527.74 1,319.85 6,599.23
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,123.94 - 44,990.28 11,528.56 57,642.78
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,123.94 - 46,040.28 11,791.06 58,955.28
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 886.71 2,335.68 38,097.40 10,329.95 51,649.74
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,019.63 6,882.66 81,659.62 22,640.48 113,202.39
405 b LAUNCHING OF GIRDER TON 47.24 403.69 - 112.73 563.66
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 82.21 - 187.83 67.51 337.55
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 82.21 - 196.55 69.69 348.45
406 c STEEL EXPANSION JOINTS KG 6.74 11.61 62.11 20.12 100.58
406 d WATER STOPS 6" SIZE M 65.96 - 305.29 92.81 464.06
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 30.69 - 1,412.38 360.77 1,803.84
406 g STEEL OR METAL BEARING DEVICES KG 15.55 30.66 84.18 32.60 162.99
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 258.72 847.08 629.96 433.94 2,169.70
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 388.08 1,270.62 944.95 650.91 3,254.56
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 388.08 1,270.62 714.91 593.40 2,967.01
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 646.80 2,117.70 1,470.67 1,058.79 5,293.96
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 554.40 1,815.17 815.05 796.16 3,980.78
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 970.20 3,176.55 1,125.56 1,318.08 6,590.39
407 h PILE LOAD TEST UPTO 120 TON EACH 13,887.66 19,990.40 77,208.60 27,771.67 138,858.33
407 i PILE LOAD TEST UPTO 240 TON EACH 34,596.54 19,990.40 154,417.20 52,251.04 261,255.18
407 j PILE LOAD TEST UPTO 360 TON EACH 51,752.46 19,990.40 231,625.80 75,842.17 379,210.83
407 k CONFIRMATORY BORING (NX SIZE) M 152.82 826.61 5.16 246.15 1,230.74
410 BRICK WORK CM 253.30 142.50 2,134.37 632.54 3,162.71
411 a STONE MASONRY RANDOM DRY CM 269.55 56.01 567.01 223.14 1,115.71
Page 60 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 321.00 84.89 1,306.10 428.00 2,139.99
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 369.22 56.01 626.92 263.04 1,315.19
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 417.45 84.89 1,378.37 470.18 2,350.89
411 g ROLL POINTING SM 52.94 5.78 46.46 26.30 131.48
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 553.57 134.30 1,307.00 498.72 2,493.59
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 187.00 230.36 399.91 204.32 1,021.59
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 181.62 297.19 515.22 248.51 1,242.54
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 175.87 514.83 635.67 331.59 1,657.96
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 184.73 639.81 954.08 444.66 2,223.28
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 212.64 704.13 1,289.62 551.60 2,757.99
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 261.64 868.93 1,944.22 768.70 3,843.49
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 338.59 961.94 2,433.75 933.57 4,667.85
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 400.43 1,168.07 3,398.54 1,241.76 6,208.80
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 474.42 1,362.74 5,154.76 1,747.98 8,739.90
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 187.00 263.77 421.48 218.06 1,090.31
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 181.62 297.19 551.30 257.53 1,287.64
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 172.72 514.83 664.53 338.02 1,690.10
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 184.73 639.81 1,020.67 461.30 2,306.51
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 212.64 704.13 1,801.85 679.66 3,398.28
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 261.64 868.93 2,452.95 895.88 4,479.40
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 338.59 961.94 3,126.48 1,106.75 5,533.76
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 400.43 1,168.07 4,087.10 1,413.90 7,069.50
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 474.42 1,362.74 5,630.05 1,866.80 9,334.01
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 75.73 68.08 343.20 121.75 608.76
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 561.83 309.47 2,419.46 822.69 4,113.45
507 a STEEL WIRE MESH FOR GABIONS KG 4.27 - 74.81 19.77 98.85
Page 61 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 80.71 - 426.07 126.70 633.48
508 a BRICK PAVING (SINGLE COURSE) SM 85.73 15.80 172.74 68.57 342.84
508 b BRICK PAVING (DOUBLE COURSE) SM 152.18 15.80 342.45 127.61 638.04
509 a RIP RAP CLASS "A" CM 368.42 - 495.64 216.02 1,080.08
509 b RIP RAP CLASS "B" CM 355.18 - 491.67 211.71 1,058.56
509 c RIP RAP CLASS "C" CM 356.36 - 495.64 213.00 1,065.00
509 d GROUTED RIP RAP CLASS "A" CM 472.70 35.09 1,443.58 487.84 2,439.21
509 e GROUTED RIP RAP CLASS "B" CM 455.11 28.07 1,341.51 456.17 2,280.86
509 f GROUTED RIP RAP CLASS "C" CM 449.46 23.39 1,362.88 458.93 2,294.66
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 590.58 181.56 2,833.78 901.48 4,507.40
509 h FILTER LAYER OF GRANULAR MATERIAL CM 39.76 115.89 316.60 118.06 590.31
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 85.47 194.57 - 70.01 350.05
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 118.43 35.01 80.54 58.50 292.48
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 151.59 44.81 103.09 74.87 374.36
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 190.16 91.01 257.92 134.77 673.86
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 237.71 113.77 322.41 168.47 842.36
603 BRICK EDGING M 7.06 - 26.88 8.49 42.43
605 a CONCRETE BEAM GUARDRAIL M 58.53 14.67 435.81 127.25 636.26
605 c CONCRETE POST FOR GUARDRAIL M 71.86 13.10 433.89 129.71 648.56
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 183.52 128.42 4,827.18 1,284.78 6,423.90
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 51.81 192.63 7,563.51 1,951.99 9,759.94
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 183.52 272.87 9,225.69 2,420.52 12,102.60
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 615.09 304.65 16,695.31 4,403.76 22,018.81
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 123.02 60.93 7,344.47 1,882.11 9,410.53
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,028.44 318.07 1,590.35
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,542.66 446.63 2,233.13
Page 62 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (39) Lasbela
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.40 2.85 15.40 5.16 25.81
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.80 1.27 30.40 8.12 40.59
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.40 2.85 20.54 6.45 32.24
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.80 1.27 40.55 10.66 53.28
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 60.27 - 148.76 52.26 261.29
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 60.27 - 383.10 110.84 554.21
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.00 3.56 21.41 6.99 34.96
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.00 4.75 51.71 14.87 74.33
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.00 3.56 28.55 8.78 43.89
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.00 4.75 68.95 19.18 95.88
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 60.27 - 206.72 66.75 333.74
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 60.27 - 652.07 178.09 890.43
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 50.15 - 99.17 37.33 186.65
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 50.15 - 255.79 76.49 382.43
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 50.15 - 137.81 46.99 234.95
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 50.15 - 435.37 121.38 606.90
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 6.87 46.68 167.74 55.32 276.61
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 6.87 46.68 202.74 64.07 320.36
610 b RIGHT OF WAY MARKER EACH 83.00 60.88 216.63 90.13 450.64
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 498.24 476.40 1,452.35 606.75 3,033.74
610 d TEN KILOMETER POST EACH 966.48 952.79 3,203.56 1,280.71 6,403.54
Page 63 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.64 102.44 0.88 27.24 136.20
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.69 258.13 1.97 68.95 344.74
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.77 1,032.53 7.89 275.80 1,378.99
103 STRIPPING CM 2.07 59.42 - 15.37 76.86
104 COMPACTION OF NATURAL GROUND SM 0.30 5.92 0.62 1.71 8.55
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.94 86.79 - 22.68 113.41
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 103.32 193.76 46.20 85.82 429.10
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.59 214.84 - 57.11 285.54
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.83 167.12 - 43.99 219.94
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.22 78.63 - 20.46 102.31
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 103.32 193.76 46.20 85.82 429.10
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.37 199.88 - 54.06 270.31
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.90 167.24 - 43.54 217.68
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.15 89.04 0.31 23.88 119.38
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 47.74 165.86 53.31 66.73 333.64
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 90.93 258.51 30.80 95.06 475.30
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 76.15 193.04 - 67.30 336.49
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 46.77 160.37 - 51.79 258.93
107 d GRANULAR BACK FILL CM 26.07 83.07 321.51 107.66 538.31
107 e COMMON BACK FILL CM 18.40 37.31 4.13 14.96 74.80
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.46 106.71 4.13 29.08 145.38
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.92 302.97 48.81 91.93 459.63
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.94 268.11 1.96 70.50 352.51
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.61 238.60 - 62.30 311.51
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.13 112.14 6.81 31.27 156.35
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 64 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.04 46.31 4.13 13.87 69.35
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.27 73.87 2.45 21.90 109.49
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.11 16.84 1.18 4.78 23.91
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.83 10.31 0.63 2.94 14.71
110 IMPROVED SUB-GRADE CM 7.91 75.50 46.33 32.44 162.18
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.70 9.38 0.64 2.68 13.40
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.01 9.92 0.74 2.92 14.59
201 GRANULAR SUB-BASE CM 6.27 106.91 387.44 125.16 625.78
202 AGGREGATE BASE CM 7.43 132.11 483.45 155.75 778.74
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 50.92 916.98 3,439.42 1,101.83 5,509.15
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 52.45 916.98 3,648.35 1,154.45 5,772.23
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 56.54 957.74 3,434.30 1,112.15 5,560.73
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 56.54 954.75 3,731.73 1,185.76 5,928.78
204 b CEMENT STABLIZED BASE CM 22.32 272.73 676.19 242.81 1,214.05
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 194.31 568.44 22,684.80 5,861.89 29,309.44
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 194.31 568.44 21,864.72 5,656.87 28,284.34
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 66.79 55.65 551.83 168.57 842.84
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 106.70 1,408.67 3,059.28 1,143.66 5,718.31
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 72.68 66.68 437.37 144.18 720.91
207 a DEEP PATCHING (0-15 cm) SM 1.46 30.14 1.02 8.16 40.78
207 b DEEP PATCHING (16-30 cm) SM 1.46 26.47 1.02 7.24 36.19
208 REINSTATEMENT OF ROAD SURFACE SM 1.55 37.00 0.45 9.75 48.75
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.93 70.82 0.55 18.33 91.63
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.39 14.16 0.11 3.67 18.33
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.69 5.90 29.49
Page 65 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 22.69 5.90 29.48
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 10.07 2.60 13.00
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.75 2.27 11.35
304 a SINGLE SURFACE TREATMENT SM 0.61 4.16 43.33 12.03 60.13
304 b DOUBLE SURFACE TREATMENT SM 0.88 8.06 81.49 22.61 113.04
304 c TRIPPLE SURFACE TREATMENT SM 1.50 11.08 97.05 27.41 137.04
304 d SEAL COAT SM 0.57 2.33 25.98 7.22 36.10
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 48.01 906.07 4,025.44 1,244.88 6,224.40
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 48.01 876.73 4,351.26 1,319.00 6,595.00
307 a DENSE GRADED HOT BIT-MAC CM 119.91 171.48 3,350.42 910.45 4,552.26
307 b OPEN GRADED HOT BIT-MAC CM 119.91 171.48 3,235.63 881.76 4,408.78
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.49 456.95 909.46 346.73 1,733.63
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 178.32 465.97 24,658.50 6,325.70 31,628.49
309 a COLD MILLING, 0 - 30 mm SM 0.75 16.87 7.54 6.29 31.45
309 b COLD MILLING, 0 - 50 mm SM 1.26 28.11 12.57 10.49 52.43
309 c COLD MILLING, 0 - 70 mm SM 1.88 42.16 18.85 15.72 78.61
401 ai CONCRETE CLASS "A3" (Underground) CM 393.62 643.62 3,103.70 1,035.24 5,176.18
401 aii CONCRETE CLASS "A3" (Onground) CM 393.62 643.62 3,312.60 1,087.46 5,437.30
401 aiii CONCRETE CLASS "A3" (Elevated) CM 393.62 643.62 3,730.40 1,191.91 5,959.55
401 b CONCRETE CLASS "B" CM 513.96 407.09 2,278.55 799.90 3,999.50
401 ci CONCRETE CLASS "C" (Underground) CM 384.46 258.76 2,747.13 847.59 4,237.94
401 cii CONCRETE CLASS "C" (Onground) CM 384.46 258.76 2,836.23 869.86 4,349.31
401 ciii CONCRETE CLASS "C" (Elevated) CM 384.46 258.76 3,014.42 914.41 4,572.05
401 d CONCRETE CLASS "D1" CM 610.79 810.64 3,974.59 1,349.01 6,745.03
401 e CONCRETE CLASS "Y" CM 839.90 258.76 3,408.29 1,126.74 5,633.69
401 f LEAN CONCRETE CM 326.16 252.12 1,824.07 600.59 3,002.94
Page 66 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,284.19 468.57 3,899.62 1,413.10 7,065.48
401 gii PRECAST CONCRETE CLASS "B" CM 1,284.19 468.57 3,435.05 1,296.95 6,484.76
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,207.02 - 45,506.89 11,678.48 58,392.39
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,207.02 - 44,719.39 11,481.60 57,408.01
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 956.69 2,335.68 37,233.01 10,131.35 50,656.73
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,928.68 6,882.66 81,661.47 22,618.20 113,091.01
405 b LAUNCHING OF GIRDER TON 44.72 403.69 - 112.10 560.51
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 86.21 - 201.98 72.05 360.24
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 86.21 - 210.70 74.23 371.14
406 c STEEL EXPANSION JOINTS KG 7.01 11.61 60.11 19.68 98.41
406 d WATER STOPS 6" SIZE M 76.19 - 307.06 95.81 479.06
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 30.09 - 1,416.82 361.73 1,808.64
406 g STEEL OR METAL BEARING DEVICES KG 15.08 30.66 80.64 31.60 157.98
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 254.63 847.08 697.50 449.80 2,249.01
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 381.94 1,270.62 1,046.25 674.70 3,373.51
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 381.94 1,270.62 782.26 608.71 3,043.53
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 636.57 2,117.70 937.10 922.84 4,614.21
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 545.63 1,815.17 881.80 810.65 4,053.25
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 954.85 3,176.55 1,199.40 1,332.70 6,663.50
407 h PILE LOAD TEST UPTO 120 TON EACH 18,507.66 19,990.40 77,208.60 28,926.67 144,633.33
407 i PILE LOAD TEST UPTO 240 TON EACH 28,790.70 19,990.40 154,417.20 50,799.58 253,997.88
407 j PILE LOAD TEST UPTO 360 TON EACH 43,347.66 19,990.40 231,625.80 73,740.97 368,704.83
407 k CONFIRMATORY BORING (NX SIZE) M 142.07 826.61 5.16 243.46 1,217.30
410 BRICK WORK CM 235.33 142.50 2,074.28 613.03 3,065.14
411 a STONE MASONRY RANDOM DRY CM 253.32 56.01 417.08 181.60 908.01
Page 67 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 298.32 84.89 1,150.55 383.44 1,917.20
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 343.32 56.01 464.98 216.08 1,080.39
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 388.32 84.89 1,203.23 419.11 2,095.55
411 g ROLL POINTING SM 49.14 5.78 45.97 25.22 126.11
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 508.32 134.30 1,131.85 443.62 2,218.09
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 164.86 230.36 398.93 198.54 992.69
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 159.17 297.19 514.06 242.61 1,213.03
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 160.74 514.83 634.52 327.52 1,637.61
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 166.58 639.81 952.61 439.75 2,198.75
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 188.94 704.13 1,288.15 545.31 2,726.53
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 231.84 868.93 1,941.90 760.67 3,803.34
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 300.03 961.94 2,430.99 923.24 4,616.20
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 353.61 1,168.07 3,395.18 1,229.22 6,146.08
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 417.80 1,362.74 5,150.84 1,732.85 8,664.23
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 164.86 263.77 421.83 212.62 1,063.08
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 159.17 297.19 550.14 251.63 1,258.13
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 156.39 514.83 663.38 333.65 1,668.25
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 166.58 639.81 1,019.63 456.51 2,282.53
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 188.94 704.13 1,799.72 673.20 3,365.99
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 231.84 868.93 2,450.63 887.85 4,439.25
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 300.03 961.94 3,123.72 1,096.42 5,482.11
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 353.61 1,168.07 4,083.74 1,401.36 7,006.78
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 417.80 1,362.74 5,626.14 1,851.67 9,258.35
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.70 68.08 343.20 120.00 599.98
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 582.89 309.47 2,331.88 806.06 4,030.30
507 a STEEL WIRE MESH FOR GABIONS KG 3.93 - 69.82 18.44 92.19
Page 68 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 71.11 - 288.32 89.86 449.29
508 a BRICK PAVING (SINGLE COURSE) SM 77.53 15.80 167.09 65.11 325.53
508 b BRICK PAVING (DOUBLE COURSE) SM 137.53 15.80 331.15 121.12 605.60
509 a RIP RAP CLASS "A" CM 336.46 - 345.70 170.54 852.70
509 b RIP RAP CLASS "B" CM 323.17 - 342.93 166.53 832.63
509 c RIP RAP CLASS "C" CM 324.31 - 345.70 167.50 837.51
509 d GROUTED RIP RAP CLASS "A" CM 383.91 35.09 1,326.06 436.27 2,181.33
509 e GROUTED RIP RAP CLASS "B" CM 368.96 28.07 1,221.74 404.69 2,023.46
509 f GROUTED RIP RAP CLASS "C" CM 363.50 23.39 1,245.12 408.00 2,040.01
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 573.29 181.56 2,714.39 867.31 4,336.55
509 h FILTER LAYER OF GRANULAR MATERIAL CM 34.47 115.89 322.01 118.09 590.46
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.30 194.57 - 68.22 341.09
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 109.72 35.01 56.18 50.23 251.14
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 140.44 44.81 71.91 64.29 321.45
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 176.44 91.01 234.85 125.58 627.88
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 220.55 113.77 293.56 156.97 784.85
603 BRICK EDGING M 6.53 - 25.92 8.11 40.56
605 a CONCRETE BEAM GUARDRAIL M 53.13 14.67 434.50 125.58 627.88
605 c CONCRETE POST FOR GUARDRAIL M 65.24 13.10 431.96 127.58 637.88
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 172.35 128.42 4,822.16 1,280.73 6,403.66
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 52.72 192.63 7,563.81 1,952.29 9,761.45
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 172.35 272.87 9,218.61 2,415.96 12,079.79
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 543.52 304.65 16,703.60 4,387.94 21,939.71
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 108.70 60.93 7,368.81 1,884.61 9,423.05
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 226.40 - 1,035.24 315.41 1,577.05
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 226.40 - 1,552.86 444.82 2,224.08
Page 69 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (41) Loralai
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.22 2.85 15.44 5.13 25.64
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.74 1.27 30.80 8.20 41.01
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.22 2.85 20.61 6.42 32.10
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.74 1.27 41.08 10.77 53.86
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 53.46 - 149.23 50.67 253.36
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.46 - 388.13 110.40 551.99
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.77 3.56 21.46 6.95 34.74
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.77 4.75 51.71 14.81 74.04
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.77 3.56 28.61 8.74 43.68
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.77 4.75 68.95 19.12 95.59
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 53.46 - 207.19 65.16 325.81
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.46 - 652.07 176.38 881.91
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 44.75 - 99.49 36.06 180.30
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 44.75 - 259.14 75.97 379.86
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 44.75 - 138.13 45.72 228.60
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 44.75 - 435.37 120.03 600.15
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.41 46.68 167.59 55.42 277.10
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.41 46.68 202.59 64.17 320.85
610 b RIGHT OF WAY MARKER EACH 74.15 60.88 213.37 87.10 435.50
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 453.33 476.40 1,447.16 594.22 2,971.11
610 d TEN KILOMETER POST EACH 876.66 952.79 3,155.89 1,246.34 6,231.68
Page 70 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.57 102.44 0.88 27.22 136.11
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.54 258.13 1.97 68.91 344.55
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.15 1,032.53 7.89 275.64 1,378.21
103 STRIPPING CM 2.05 59.42 - 15.37 76.84
104 COMPACTION OF NATURAL GROUND SM 0.30 5.92 0.62 1.71 8.55
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.07 86.79 - 22.72 113.58
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 102.34 193.76 46.20 85.58 427.88
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.47 214.84 - 57.08 285.39
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.00 167.12 - 44.03 220.15
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.33 78.63 - 20.49 102.45
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 102.34 193.76 46.20 85.58 427.88
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.30 199.88 - 54.05 270.23
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.86 167.24 - 43.53 217.63
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.49 89.04 0.31 23.96 119.80
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 49.97 165.86 53.31 67.29 336.43
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 90.54 258.51 30.80 94.96 474.81
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 75.79 193.04 - 67.21 336.04
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 46.56 160.37 - 51.73 258.66
107 d GRANULAR BACK FILL CM 26.63 83.07 336.10 111.45 557.25
107 e COMMON BACK FILL CM 18.40 37.31 4.13 14.96 74.80
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.67 106.71 4.13 29.13 145.64
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 16.07 302.97 48.81 91.96 459.81
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 12.05 268.11 1.96 70.53 352.65
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.71 238.60 - 62.33 311.64
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.34 112.14 6.81 31.32 156.61
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 71 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.07 46.31 4.13 13.88 69.39
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.49 73.87 2.45 21.95 109.76
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.14 16.84 1.18 4.79 23.95
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.85 10.31 0.63 2.95 14.74
110 IMPROVED SUB-GRADE CM 7.99 75.50 52.33 33.96 169.78
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.69 9.38 0.64 2.68 13.39
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.03 9.92 0.64 2.90 14.49
201 GRANULAR SUB-BASE CM 6.43 106.91 395.91 127.31 636.56
202 AGGREGATE BASE CM 7.58 132.11 504.34 161.01 805.04
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 53.40 916.98 3,367.91 1,084.57 5,422.86
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 55.54 916.98 3,601.02 1,143.39 5,716.93
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 59.81 957.74 3,362.82 1,095.09 5,475.46
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 59.81 954.75 3,684.16 1,174.68 5,873.40
204 b CEMENT STABLIZED BASE CM 22.71 272.73 608.97 226.10 1,130.51
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 201.42 568.44 22,480.80 5,812.67 29,063.33
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 201.42 568.44 21,660.72 5,607.65 28,038.23
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 67.05 55.65 532.95 163.91 819.56
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 113.37 1,408.67 3,026.19 1,137.06 5,685.29
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 72.91 66.68 455.34 148.73 743.66
207 a DEEP PATCHING (0-15 cm) SM 1.42 30.14 1.02 8.15 40.73
207 b DEEP PATCHING (16-30 cm) SM 1.42 26.47 1.02 7.23 36.14
208 REINSTATEMENT OF ROAD SURFACE SM 1.49 37.00 0.45 9.74 48.68
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.92 70.82 0.55 18.32 91.61
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.38 14.16 0.11 3.66 18.31
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.49 5.85 29.25
Page 72 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 0.67 22.49 5.85 29.25
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 9.99 2.58 12.91
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 8.66 2.25 11.25
304 a SINGLE SURFACE TREATMENT SM 0.63 4.16 42.71 11.88 59.38
304 b DOUBLE SURFACE TREATMENT SM 0.92 8.06 80.33 22.33 111.64
304 c TRIPPLE SURFACE TREATMENT SM 1.56 11.08 95.54 27.05 135.23
304 d SEAL COAT SM 0.59 2.33 25.57 7.12 35.61
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 51.26 906.07 3,957.83 1,228.79 6,143.95
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 51.26 876.73 4,271.67 1,299.92 6,499.58
307 a DENSE GRADED HOT BIT-MAC CM 121.92 171.48 3,274.91 892.08 4,460.39
307 b OPEN GRADED HOT BIT-MAC CM 121.92 171.48 3,176.38 867.45 4,337.23
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.70 456.95 891.59 342.56 1,712.80
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 179.02 465.97 24,454.50 6,274.87 31,374.36
309 a COLD MILLING, 0 - 30 mm SM 0.78 16.87 7.54 6.30 31.49
309 b COLD MILLING, 0 - 50 mm SM 1.29 28.11 12.57 10.49 52.46
309 c COLD MILLING, 0 - 70 mm SM 1.94 42.16 18.85 15.74 78.69
401 ai CONCRETE CLASS "A3" (Underground) CM 394.79 643.62 3,232.44 1,067.71 5,338.56
401 aii CONCRETE CLASS "A3" (Onground) CM 394.79 643.62 3,441.34 1,119.94 5,599.69
401 aiii CONCRETE CLASS "A3" (Elevated) CM 394.79 643.62 3,859.14 1,224.39 6,121.94
401 b CONCRETE CLASS "B" CM 519.58 407.09 2,432.46 839.78 4,198.91
401 ci CONCRETE CLASS "C" (Underground) CM 381.72 258.76 2,887.22 881.93 4,409.63
401 cii CONCRETE CLASS "C" (Onground) CM 381.72 258.76 2,976.32 904.20 4,521.00
401 ciii CONCRETE CLASS "C" (Elevated) CM 381.72 258.76 3,154.51 948.75 4,743.74
401 d CONCRETE CLASS "D1" CM 604.00 810.64 4,141.21 1,388.96 6,944.81
401 e CONCRETE CLASS "Y" CM 829.15 258.76 3,537.73 1,156.41 5,782.05
401 f LEAN CONCRETE CM 321.19 252.12 1,954.21 631.88 3,159.40
Page 73 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,258.76 468.57 4,030.41 1,439.44 7,197.18
401 gii PRECAST CONCRETE CLASS "B" CM 1,258.76 468.57 3,596.21 1,330.89 6,654.43
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,209.74 - 43,668.41 11,219.54 56,097.69
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,209.74 - 44,718.41 11,482.04 57,410.19
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 956.89 2,335.68 37,131.98 10,106.14 50,530.69
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,036.61 6,882.66 81,669.58 22,647.21 113,236.06
405 b LAUNCHING OF GIRDER TON 47.23 403.69 - 112.73 563.65
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 83.53 - 195.27 69.70 348.50
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 83.53 - 203.99 71.88 359.40
406 c STEEL EXPANSION JOINTS KG 6.83 11.61 60.27 19.68 98.39
406 d WATER STOPS 6" SIZE M 73.39 - 306.22 94.90 474.51
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.59 - 1,414.70 361.07 1,805.36
406 g STEEL OR METAL BEARING DEVICES KG 14.67 30.66 80.74 31.52 157.59
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 257.90 847.08 700.03 451.25 2,256.26
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 386.84 1,270.62 1,050.05 676.88 3,384.39
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 386.84 1,270.62 785.86 610.83 3,054.15
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 644.74 2,117.70 943.10 926.39 4,631.93
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 552.63 1,815.17 886.94 813.69 4,068.43
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 967.11 3,176.55 1,208.40 1,338.02 6,690.08
407 h PILE LOAD TEST UPTO 120 TON EACH 17,125.98 19,990.40 81,933.32 29,762.43 148,812.13
407 i PILE LOAD TEST UPTO 240 TON EACH 28,790.70 19,990.40 163,866.64 53,161.94 265,809.68
407 j PILE LOAD TEST UPTO 360 TON EACH 43,225.98 19,990.40 245,799.96 77,254.09 386,270.43
407 k CONFIRMATORY BORING (NX SIZE) M 139.54 826.61 5.16 242.83 1,214.14
410 BRICK WORK CM 235.14 142.50 2,152.64 632.57 3,162.85
411 a STONE MASONRY RANDOM DRY CM 252.34 56.01 403.71 178.02 890.08
Page 74 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 297.34 84.89 1,230.76 403.25 2,016.24
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 342.34 56.01 450.55 212.23 1,061.13
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 387.34 84.89 1,264.61 434.21 2,171.05
411 g ROLL POINTING SM 49.14 5.78 47.78 25.68 128.38
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 507.34 134.30 1,193.23 458.72 2,293.59
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 164.62 230.36 402.35 199.33 996.66
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 158.92 297.19 518.16 243.57 1,217.84
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 159.24 514.83 639.18 328.31 1,641.56
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 165.21 639.81 958.13 440.79 2,203.94
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 191.07 704.13 1,293.67 547.22 2,736.09
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 237.00 868.93 1,950.00 763.98 3,819.91
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 306.70 961.94 2,439.34 927.00 4,634.98
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 361.71 1,168.07 3,405.32 1,233.78 6,168.88
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 427.83 1,362.74 5,162.67 1,738.31 8,691.55
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 164.62 263.77 427.24 213.91 1,069.54
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 158.92 297.19 554.24 252.59 1,262.94
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 155.24 514.83 668.04 334.53 1,672.64
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 165.21 639.81 1,023.87 457.22 2,286.11
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 191.07 704.13 1,806.17 675.34 3,376.71
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 237.00 868.93 2,458.73 891.17 4,455.83
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 306.70 961.94 3,132.07 1,100.18 5,500.89
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 361.71 1,168.07 4,093.88 1,405.92 7,029.58
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 427.83 1,362.74 5,637.97 1,857.14 9,285.68
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.54 68.08 416.78 138.35 691.75
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 584.79 309.47 2,488.57 845.71 4,228.54
507 a STEEL WIRE MESH FOR GABIONS KG 4.09 - 69.82 18.48 92.39
Page 75 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 70.95 - 351.35 105.58 527.88
508 a BRICK PAVING (SINGLE COURSE) SM 78.20 15.80 169.78 65.95 329.73
508 b BRICK PAVING (DOUBLE COURSE) SM 138.20 15.80 335.98 122.50 612.48
509 a RIP RAP CLASS "A" CM 338.14 - 332.34 167.62 838.10
509 b RIP RAP CLASS "B" CM 324.51 - 329.68 163.55 817.74
509 c RIP RAP CLASS "C" CM 325.43 - 332.34 164.44 822.21
509 d GROUTED RIP RAP CLASS "A" CM 407.72 35.09 1,362.82 451.41 2,257.04
509 e GROUTED RIP RAP CLASS "B" CM 391.52 28.07 1,253.32 418.23 2,091.14
509 f GROUTED RIP RAP CLASS "C" CM 385.66 23.39 1,280.12 422.29 2,111.46
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 569.78 181.56 2,881.80 908.29 4,541.43
509 h FILTER LAYER OF GRANULAR MATERIAL CM 35.49 115.89 336.95 122.08 610.41
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.30 194.57 - 68.22 341.09
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 109.41 35.01 54.01 49.61 248.04
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 140.05 44.81 69.13 63.50 317.49
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 176.05 91.01 250.06 129.28 646.40
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 220.06 113.77 312.58 161.60 808.01
603 BRICK EDGING M 6.50 - 25.92 8.11 40.53
605 a CONCRETE BEAM GUARDRAIL M 52.84 14.67 430.85 124.59 622.95
605 c CONCRETE POST FOR GUARDRAIL M 64.88 13.10 428.61 126.65 633.24
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 169.32 128.42 4,825.76 1,280.88 6,404.38
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 51.53 192.63 7,583.26 1,956.86 9,784.28
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 169.32 272.87 9,257.50 2,424.92 12,124.61
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 538.98 304.65 16,752.96 4,399.15 21,995.74
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 107.80 60.93 7,367.93 1,884.17 9,420.83
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 226.40 - 1,032.02 314.61 1,573.03
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 226.40 - 1,548.03 443.61 2,218.04
Page 76 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 B) Mastung
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.19 2.85 15.42 5.12 25.58
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.73 1.27 30.61 8.15 40.76
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.19 2.85 20.58 6.41 32.03
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.73 1.27 40.83 10.71 53.54
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 53.68 - 149.01 50.67 253.36
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.68 - 385.75 109.86 549.29
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.74 3.56 21.44 6.94 34.68
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.74 4.75 51.71 14.80 74.00
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.74 3.56 28.58 8.72 43.60
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.74 4.75 68.95 19.11 95.55
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 53.68 - 206.97 65.16 325.81
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.68 - 652.07 176.44 882.19
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 44.77 - 99.34 36.03 180.14
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 44.77 - 257.55 75.58 377.90
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 44.77 - 137.98 45.69 228.44
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 44.77 - 435.37 120.04 600.18
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.20 46.68 167.80 55.42 277.10
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.20 46.68 202.80 64.17 320.85
610 b RIGHT OF WAY MARKER EACH 73.70 60.88 216.32 87.73 438.63
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 452.84 476.40 1,453.83 595.77 2,978.84
610 d TEN KILOMETER POST EACH 875.68 952.79 3,187.89 1,254.09 6,270.45
Page 77 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.61 102.44 0.88 27.23 136.16
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.62 258.13 1.97 68.93 344.65
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.49 1,032.53 7.89 275.73 1,378.64
103 STRIPPING CM 2.05 59.42 - 15.37 76.84
104 COMPACTION OF NATURAL GROUND SM 0.30 5.92 0.62 1.71 8.55
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.92 86.79 - 22.68 113.39
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 102.80 193.76 46.20 85.69 428.45
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.45 214.84 - 57.07 285.36
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.75 167.12 - 43.97 219.84
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.21 78.63 - 20.46 102.30
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 102.80 193.76 46.20 85.69 428.45
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 16.30 199.88 - 54.05 270.23
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.82 167.24 - 43.52 217.58
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.08 89.04 0.31 23.86 119.29
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 46.95 165.86 53.31 66.53 332.65
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 90.54 258.51 30.80 94.96 474.81
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 75.80 193.04 - 67.21 336.05
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 46.57 160.37 - 51.74 258.68
107 d GRANULAR BACK FILL CM 26.07 83.07 312.20 105.34 526.68
107 e COMMON BACK FILL CM 18.40 37.31 4.13 14.96 74.80
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.40 106.71 4.13 29.06 145.30
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.78 302.97 48.81 91.89 459.45
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.84 268.11 1.96 70.48 352.39
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.52 238.60 - 62.28 311.40
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.07 112.14 6.81 31.26 156.28
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 78 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.97 46.31 4.13 13.85 69.26
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.15 73.87 2.45 21.87 109.34
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.10 16.84 1.18 4.78 23.90
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.82 10.31 0.63 2.94 14.70
110 IMPROVED SUB-GRADE CM 7.81 75.50 51.06 33.59 167.96
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.69 9.38 0.64 2.68 13.39
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 0.99 9.92 0.74 2.91 14.56
201 GRANULAR SUB-BASE CM 6.21 106.91 397.48 127.65 638.25
202 AGGREGATE BASE CM 7.35 132.11 483.45 155.73 778.64
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 50.65 916.98 3,332.63 1,075.07 5,375.33
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 52.19 916.98 3,577.86 1,136.76 5,683.79
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 56.27 957.74 3,327.48 1,085.37 5,426.86
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 56.27 954.75 3,661.53 1,168.14 5,840.69
204 b CEMENT STABLIZED BASE CM 22.10 272.73 539.42 208.56 1,042.81
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 194.31 568.44 22,684.80 5,861.89 29,309.44
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 194.31 568.44 21,864.72 5,656.87 28,284.34
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 66.60 55.65 510.87 158.28 791.40
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 105.86 1,408.67 3,005.45 1,130.00 5,649.98
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 72.57 66.68 426.06 141.33 706.64
207 a DEEP PATCHING (0-15 cm) SM 1.44 30.14 1.02 8.15 40.75
207 b DEEP PATCHING (16-30 cm) SM 1.44 26.47 1.02 7.23 36.16
208 REINSTATEMENT OF ROAD SURFACE SM 1.54 37.00 0.45 9.75 48.74
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.91 70.82 0.55 18.32 91.60
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.38 14.16 0.11 3.66 18.31
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.69 5.90 29.49
Page 79 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 22.69 5.90 29.48
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 10.07 2.60 13.00
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.75 2.27 11.35
304 a SINGLE SURFACE TREATMENT SM 0.61 4.16 42.91 11.92 59.60
304 b DOUBLE SURFACE TREATMENT SM 0.88 8.06 80.65 22.40 111.99
304 c TRIPPLE SURFACE TREATMENT SM 1.50 11.08 95.77 27.09 135.44
304 d SEAL COAT SM 0.57 2.33 25.57 7.12 35.59
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 47.72 906.07 3,931.40 1,221.30 6,106.49
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 47.72 876.73 4,243.03 1,291.87 6,459.35
307 a DENSE GRADED HOT BIT-MAC CM 118.51 171.48 3,244.75 883.69 4,418.43
307 b OPEN GRADED HOT BIT-MAC CM 118.51 171.48 3,157.94 861.98 4,309.91
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 20.00 456.95 892.77 342.43 1,712.15
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 178.32 465.97 24,658.50 6,325.70 31,628.49
309 a COLD MILLING, 0 - 30 mm SM 0.75 16.87 7.54 6.29 31.45
309 b COLD MILLING, 0 - 50 mm SM 1.24 28.11 12.57 10.48 52.40
309 c COLD MILLING, 0 - 70 mm SM 1.87 42.16 18.85 15.72 78.60
401 ai CONCRETE CLASS "A3" (Underground) CM 379.72 643.62 3,052.08 1,018.86 5,094.28
401 aii CONCRETE CLASS "A3" (Onground) CM 379.72 643.62 3,260.98 1,071.08 5,355.40
401 aiii CONCRETE CLASS "A3" (Elevated) CM 379.72 643.62 3,678.78 1,175.53 5,877.65
401 b CONCRETE CLASS "B" CM 502.38 407.09 2,296.61 801.52 4,007.60
401 ci CONCRETE CLASS "C" (Underground) CM 371.80 258.76 2,719.09 837.41 4,187.06
401 cii CONCRETE CLASS "C" (Onground) CM 371.80 258.76 2,808.18 859.69 4,298.43
401 ciii CONCRETE CLASS "C" (Elevated) CM 371.80 258.76 2,986.38 904.24 4,521.18
401 d CONCRETE CLASS "D1" CM 586.17 810.64 3,933.81 1,332.66 6,663.28
401 e CONCRETE CLASS "Y" CM 809.71 258.76 3,342.88 1,102.84 5,514.19
401 f LEAN CONCRETE CM 320.18 252.12 1,835.96 602.07 3,010.33
Page 80 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,249.25 468.57 3,838.36 1,389.05 6,945.23
401 gii PRECAST CONCRETE CLASS "B" CM 1,249.25 468.57 3,457.15 1,293.74 6,468.71
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,159.50 - 43,669.39 11,207.22 56,036.11
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,159.50 - 44,719.39 11,469.72 57,348.61
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 918.67 2,335.68 37,233.01 10,121.84 50,609.20
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,928.68 6,882.66 81,663.88 22,618.81 113,094.03
405 b LAUNCHING OF GIRDER TON 44.72 403.69 - 112.10 560.51
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 83.57 - 201.98 71.39 356.94
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 83.57 - 210.70 73.57 367.84
406 c STEEL EXPANSION JOINTS KG 6.80 11.61 60.11 19.63 98.15
406 d WATER STOPS 6" SIZE M 72.41 - 307.06 94.87 474.34
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.61 - 1,416.82 361.61 1,808.04
406 g STEEL OR METAL BEARING DEVICES KG 14.98 30.66 80.64 31.57 157.85
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 254.00 847.08 691.27 448.09 2,240.44
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 381.00 1,270.62 1,036.90 672.13 3,360.65
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 381.00 1,270.62 772.91 606.13 3,030.66
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 634.99 2,117.70 921.52 918.55 4,592.76
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 544.28 1,815.17 868.44 806.97 4,034.86
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 952.49 3,176.55 1,176.03 1,326.27 6,631.34
407 h PILE LOAD TEST UPTO 120 TON EACH 17,247.66 19,990.40 81,933.32 29,792.85 148,964.23
407 i PILE LOAD TEST UPTO 240 TON EACH 28,790.70 19,990.40 163,866.64 53,161.94 265,809.68
407 j PILE LOAD TEST UPTO 360 TON EACH 43,347.66 19,990.40 245,799.96 77,284.51 386,422.53
407 k CONFIRMATORY BORING (NX SIZE) M 142.07 826.61 5.16 243.46 1,217.30
410 BRICK WORK CM 231.15 142.50 2,146.89 630.14 3,150.68
411 a STONE MASONRY RANDOM DRY CM 248.50 56.01 434.58 184.77 923.86
Page 81 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 293.02 84.89 1,196.30 393.55 1,967.76
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 337.04 56.01 483.88 219.23 1,096.16
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 381.06 84.89 1,243.32 427.32 2,136.59
411 g ROLL POINTING SM 48.16 5.78 46.44 25.10 125.48
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 499.60 134.30 1,171.95 451.46 2,257.31
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 164.02 230.36 399.81 198.55 992.74
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 158.33 297.19 515.12 242.66 1,213.30
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 159.55 514.83 635.76 327.54 1,637.68
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 165.50 639.81 954.05 439.84 2,199.20
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 187.86 704.13 1,289.59 545.40 2,726.98
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 230.54 868.93 1,943.99 760.87 3,804.33
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 298.35 961.94 2,433.07 923.34 4,616.70
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 351.91 1,168.07 3,397.70 1,229.42 6,147.10
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 415.99 1,362.74 5,153.79 1,733.13 8,665.65
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 164.02 263.77 423.59 212.85 1,064.23
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 158.33 297.19 551.20 251.68 1,258.40
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 155.55 514.83 664.62 333.75 1,668.75
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 165.50 639.81 1,020.76 456.52 2,282.59
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 187.86 704.13 1,801.32 673.33 3,366.64
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 230.54 868.93 2,452.72 888.05 4,440.24
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 298.35 961.94 3,125.80 1,096.52 5,482.61
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 351.91 1,168.07 4,086.26 1,401.56 7,007.80
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 415.99 1,362.74 5,629.08 1,851.95 9,259.76
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.47 68.08 416.78 138.33 691.66
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 565.03 309.47 2,349.94 806.11 4,030.55
507 a STEEL WIRE MESH FOR GABIONS KG 3.89 - 69.82 18.43 92.14
Page 82 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 70.88 - 312.34 95.81 479.03
508 a BRICK PAVING (SINGLE COURSE) SM 76.41 15.80 175.43 66.91 334.55
508 b BRICK PAVING (DOUBLE COURSE) SM 135.44 15.80 347.28 124.63 623.15
509 a RIP RAP CLASS "A" CM 331.23 - 363.20 173.61 868.04
509 b RIP RAP CLASS "B" CM 318.21 - 360.29 169.63 848.13
509 c RIP RAP CLASS "C" CM 319.20 - 363.20 170.60 853.00
509 d GROUTED RIP RAP CLASS "A" CM 383.91 35.09 1,343.39 440.60 2,202.99
509 e GROUTED RIP RAP CLASS "B" CM 368.96 28.07 1,238.94 408.99 2,044.96
509 f GROUTED RIP RAP CLASS "C" CM 363.50 23.39 1,262.45 412.34 2,061.68
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 558.77 181.56 2,722.17 865.63 4,328.13
509 h FILTER LAYER OF GRANULAR MATERIAL CM 34.26 115.89 313.18 115.83 579.16
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 78.30 194.57 - 68.22 341.09
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 108.06 35.01 75.55 54.66 273.28
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 138.32 44.81 75.55 64.67 323.35
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 173.54 91.01 244.19 127.19 635.93
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 216.92 113.77 305.23 158.98 794.90
603 BRICK EDGING M 6.44 - 26.88 8.33 41.65
605 a CONCRETE BEAM GUARDRAIL M 52.39 14.67 423.64 122.68 613.38
605 c CONCRETE POST FOR GUARDRAIL M 64.33 13.10 419.76 124.30 621.49
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 170.58 128.42 4,818.13 1,279.28 6,396.41
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 50.83 192.63 7,563.78 1,951.81 9,759.05
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 170.58 272.87 9,219.37 2,415.71 12,078.53
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 539.89 304.65 16,704.73 4,387.32 21,936.59
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 107.98 60.93 7,369.04 1,884.49 9,422.44
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 223.96 - 1,035.24 314.80 1,574.00
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 223.96 - 1,552.86 444.21 2,221.03
Page 83 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (47 C) Musa Khail
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.22 2.85 15.44 5.13 25.64
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.74 1.27 30.80 8.20 41.01
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.22 2.85 20.61 6.42 32.10
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.74 1.27 41.08 10.77 53.86
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 53.46 - 149.23 50.67 253.36
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.46 - 388.13 110.40 551.99
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.77 3.56 21.46 6.95 34.74
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.77 4.75 51.71 14.81 74.04
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.77 3.56 28.61 8.74 43.68
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.77 4.75 68.95 19.12 95.59
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 53.46 - 207.19 65.16 325.81
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 53.46 - 652.07 176.38 881.91
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 44.75 - 99.49 36.06 180.30
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 44.75 - 259.14 75.97 379.86
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 44.75 - 138.13 45.72 228.60
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 44.75 - 435.37 120.03 600.15
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.08 46.68 167.63 55.35 276.74
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.08 46.68 202.63 64.10 320.49
610 b RIGHT OF WAY MARKER EACH 73.36 60.88 208.64 85.72 428.60
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 447.26 476.40 1,401.80 581.37 2,906.83
610 d TEN KILOMETER POST EACH 865.50 952.79 3,063.11 1,220.35 6,101.75
Page 84 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.52 6.96 - 1.87 9.35
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.40 102.44 0.88 27.18 135.90
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.15 258.13 1.97 68.81 344.06
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 60.59 1,032.53 7.89 275.25 1,376.26
103 STRIPPING CM 1.98 59.42 - 15.35 76.75
104 COMPACTION OF NATURAL GROUND SM 0.28 5.92 0.62 1.71 8.53
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.72 86.79 - 22.63 113.14
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 97.04 193.76 46.20 84.25 421.25
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.20 214.84 - 57.01 285.05
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.74 167.12 - 43.97 219.83
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.04 78.63 - 20.42 102.09
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 97.04 193.76 46.20 84.25 421.25
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 15.41 199.88 - 53.82 269.11
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.74 167.24 - 43.50 217.48
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.13 89.04 0.31 23.87 119.35
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 49.05 165.86 53.31 67.06 335.28
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 85.59 258.51 30.80 93.73 468.63
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 71.97 193.04 - 66.25 331.26
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 44.02 160.37 - 51.10 255.49
107 d GRANULAR BACK FILL CM 25.23 83.07 452.46 140.19 700.95
107 e COMMON BACK FILL CM 17.83 37.31 4.13 14.82 74.09
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.48 106.71 4.13 29.08 145.40
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.56 302.97 48.81 91.84 459.18
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.67 268.11 1.96 70.44 352.18
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.37 238.60 - 62.24 311.21
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.15 112.14 6.81 31.28 156.38
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 85 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.93 46.31 4.13 13.84 69.21
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.19 73.87 2.45 21.88 109.39
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.09 16.84 1.18 4.78 23.89
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.81 10.31 0.63 2.94 14.69
110 IMPROVED SUB-GRADE CM 7.84 75.50 51.06 33.60 168.00
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.67 9.38 0.64 2.67 13.36
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.01 9.92 0.64 2.89 14.46
201 GRANULAR SUB-BASE CM 6.22 106.91 456.07 142.30 711.50
202 AGGREGATE BASE CM 7.34 132.11 525.25 166.18 830.88
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 52.52 916.98 3,375.83 1,086.33 5,431.66
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 54.51 916.98 3,605.24 1,144.18 5,720.91
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 58.58 957.74 3,370.79 1,096.78 5,483.89
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 58.58 954.75 3,687.94 1,175.32 5,876.59
204 b CEMENT STABLIZED BASE CM 22.07 272.73 638.50 233.33 1,166.63
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 187.00 568.44 22,276.80 5,758.06 28,790.30
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 187.00 568.44 21,456.72 5,553.04 27,765.20
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 66.39 55.65 555.02 169.27 846.33
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 111.06 1,408.67 3,038.17 1,139.48 5,697.38
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 72.22 66.68 473.11 153.00 765.01
207 a DEEP PATCHING (0-15 cm) SM 1.38 30.14 1.02 8.14 40.68
207 b DEEP PATCHING (16-30 cm) SM 1.38 26.47 1.02 7.22 36.09
208 REINSTATEMENT OF ROAD SURFACE SM 1.45 37.00 0.45 9.73 48.63
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.80 70.82 0.55 18.29 91.46
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.36 14.16 0.11 3.66 18.29
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.28 5.80 28.98
Page 86 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 22.28 5.79 28.96
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.91 2.56 12.80
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.58 2.23 11.14
304 a SINGLE SURFACE TREATMENT SM 0.60 4.16 42.43 11.80 58.99
304 b DOUBLE SURFACE TREATMENT SM 0.87 8.06 79.93 22.22 111.08
304 c TRIPPLE SURFACE TREATMENT SM 1.48 11.08 95.18 26.94 134.68
304 d SEAL COAT SM 0.55 2.33 25.43 7.08 35.39
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 50.24 906.07 3,959.79 1,229.03 6,145.13
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 50.24 876.73 4,272.34 1,299.83 6,499.14
307 a DENSE GRADED HOT BIT-MAC CM 122.64 171.48 3,275.51 892.41 4,462.04
307 b OPEN GRADED HOT BIT-MAC CM 122.64 171.48 3,177.75 867.97 4,339.84
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.42 456.95 890.40 342.44 1,712.21
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 166.20 465.97 24,250.50 6,220.67 31,103.34
309 a COLD MILLING, 0 - 30 mm SM 0.75 16.87 7.54 6.29 31.45
309 b COLD MILLING, 0 - 50 mm SM 1.25 28.11 12.57 10.48 52.41
309 c COLD MILLING, 0 - 70 mm SM 1.87 42.16 18.85 15.72 78.60
401 ai CONCRETE CLASS "A3" (Underground) CM 411.03 643.62 3,174.74 1,057.35 5,286.74
401 aii CONCRETE CLASS "A3" (Onground) CM 411.03 643.62 3,383.64 1,109.57 5,547.86
401 aiii CONCRETE CLASS "A3" (Elevated) CM 411.03 643.62 3,801.44 1,214.02 6,070.11
401 b CONCRETE CLASS "B" CM 523.11 407.09 2,401.18 832.85 4,164.23
401 ci CONCRETE CLASS "C" (Underground) CM 397.00 258.76 2,839.67 873.86 4,369.29
401 cii CONCRETE CLASS "C" (Onground) CM 397.00 258.76 2,928.77 896.13 4,480.66
401 ciii CONCRETE CLASS "C" (Elevated) CM 397.00 258.76 3,106.96 940.68 4,703.40
401 d CONCRETE CLASS "D1" CM 637.43 810.64 4,042.15 1,372.56 6,862.78
401 e CONCRETE CLASS "Y" CM 865.25 258.76 3,463.80 1,146.95 5,734.76
401 f LEAN CONCRETE CM 325.88 252.12 1,940.90 629.73 3,148.63
Page 87 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,296.92 468.57 3,974.50 1,435.00 7,174.99
401 gii PRECAST CONCRETE CLASS "B" CM 1,296.92 468.57 3,564.70 1,332.55 6,662.74
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,261.83 - 43,403.98 11,166.45 55,832.26
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,261.83 - 44,453.98 11,428.95 57,144.76
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,005.11 2,335.68 36,933.46 10,068.56 50,342.81
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,766.37 6,882.66 81,649.91 22,574.74 112,873.68
405 b LAUNCHING OF GIRDER TON 40.57 403.69 - 111.07 555.33
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 86.85 - 196.22 70.77 353.84
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 86.85 - 204.93 72.95 364.73
406 c STEEL EXPANSION JOINTS KG 7.06 11.61 59.90 19.64 98.21
406 d WATER STOPS 6" SIZE M 80.13 - 306.38 96.63 483.14
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.08 - 1,414.84 360.98 1,804.90
406 g STEEL OR METAL BEARING DEVICES KG 14.26 30.66 80.42 31.34 156.68
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 221.56 847.08 690.28 439.73 2,198.65
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 332.34 1,270.62 1,035.42 659.60 3,297.98
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 332.34 1,270.62 771.26 593.56 2,967.78
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 553.90 2,117.70 918.77 897.59 4,487.96
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 474.77 1,815.17 866.09 789.01 3,945.04
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 830.85 3,176.55 1,171.90 1,294.83 6,474.13
407 h PILE LOAD TEST UPTO 120 TON EACH 20,490.78 19,990.40 92,749.40 33,307.65 166,538.23
407 i PILE LOAD TEST UPTO 240 TON EACH 28,511.34 19,990.40 185,498.80 58,500.14 292,500.68
407 j PILE LOAD TEST UPTO 360 TON EACH 42,990.78 19,990.40 278,248.20 85,307.35 426,536.73
407 k CONFIRMATORY BORING (NX SIZE) M 126.66 826.61 5.16 239.61 1,198.04
410 BRICK WORK CM 233.58 142.50 2,167.10 635.80 3,178.98
411 a STONE MASONRY RANDOM DRY CM 252.13 56.01 514.16 205.58 1,027.88
Page 88 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 297.13 84.89 1,332.40 428.61 2,143.03
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 342.13 56.01 569.84 242.00 1,209.98
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 387.13 84.89 1,371.66 460.92 2,304.60
411 g ROLL POINTING SM 49.01 5.78 47.39 25.55 127.73
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 507.13 134.30 1,300.28 485.43 2,427.14
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 162.03 230.36 401.58 198.49 992.46
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 156.97 297.19 517.24 242.85 1,214.25
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 156.85 514.83 638.23 327.48 1,637.39
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 163.05 639.81 956.94 439.95 2,199.75
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 188.03 704.13 1,292.48 546.16 2,730.80
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 232.62 868.93 1,948.16 762.43 3,812.14
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 301.04 961.94 2,437.22 925.05 4,625.25
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 354.84 1,168.07 3,402.75 1,231.42 6,157.08
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 418.15 1,362.74 5,159.67 1,735.14 8,675.70
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 162.03 263.77 427.12 213.23 1,066.15
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 156.97 297.19 553.32 251.87 1,259.35
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 151.85 514.83 667.09 333.44 1,667.21
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 163.05 639.81 1,023.00 456.47 2,282.33
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 188.03 704.13 1,804.53 674.17 3,370.86
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 232.62 868.93 2,456.89 889.61 4,448.05
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 301.04 961.94 3,129.95 1,098.23 5,491.16
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 354.84 1,168.07 4,091.31 1,403.56 7,017.78
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 418.15 1,362.74 5,634.97 1,853.97 9,269.83
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 66.40 68.08 497.90 158.10 790.48
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 602.59 309.47 2,454.52 841.65 4,208.23
507 a STEEL WIRE MESH FOR GABIONS KG 3.95 - 73.81 19.44 97.20
Page 89 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 69.65 - 372.26 110.48 552.39
508 a BRICK PAVING (SINGLE COURSE) SM 77.73 15.80 178.75 68.07 340.35
508 b BRICK PAVING (DOUBLE COURSE) SM 137.73 15.80 352.69 126.56 632.78
509 a RIP RAP CLASS "A" CM 335.71 - 442.79 194.63 973.13
509 b RIP RAP CLASS "B" CM 322.57 - 439.25 190.46 952.28
509 c RIP RAP CLASS "C" CM 323.81 - 442.79 191.65 958.25
509 d GROUTED RIP RAP CLASS "A" CM 354.22 35.09 1,483.73 468.26 2,341.30
509 e GROUTED RIP RAP CLASS "B" CM 340.08 28.07 1,372.41 435.14 2,175.70
509 f GROUTED RIP RAP CLASS "C" CM 334.71 23.39 1,396.73 438.71 2,193.54
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 587.28 181.56 2,821.04 897.47 4,487.35
509 h FILTER LAYER OF GRANULAR MATERIAL CM 35.16 115.89 453.63 151.17 755.85
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 70.25 194.57 - 66.21 331.03
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 108.56 35.01 71.95 53.88 269.40
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 138.95 44.81 92.10 68.97 344.83
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 174.95 91.01 269.06 133.76 668.78
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 218.69 113.77 336.33 167.20 835.99
603 BRICK EDGING M 6.43 - 26.40 8.21 41.04
605 a CONCRETE BEAM GUARDRAIL M 53.14 14.67 427.35 123.79 618.95
605 c CONCRETE POST FOR GUARDRAIL M 65.25 13.10 424.45 125.70 628.50
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 167.39 128.42 4,816.02 1,277.96 6,389.79
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 54.69 192.63 7,573.07 1,955.10 9,775.49
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 167.39 272.87 9,236.50 2,419.19 12,095.95
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 536.09 304.65 16,723.09 4,390.96 21,954.79
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 107.22 60.93 7,363.91 1,883.02 9,415.08
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 213.76 - 1,032.60 311.59 1,557.95
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 213.76 - 1,548.90 440.67 2,203.33
Page 90 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (48) Naseerabad
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 1.97 2.85 15.43 5.06 25.31
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.66 1.27 30.64 8.14 40.71
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 1.97 2.85 20.58 6.35 31.75
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.66 1.27 40.87 10.70 53.50
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 48.91 - 149.05 49.49 247.45
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 48.91 - 386.14 108.76 543.81
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.47 3.56 21.44 6.87 34.34
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.47 4.75 51.71 14.73 73.66
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.47 3.56 28.59 8.66 43.28
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.47 4.75 68.95 19.04 95.21
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 48.91 - 207.01 63.98 319.90
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 48.91 - 652.07 175.25 876.23
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 40.81 - 99.36 35.04 175.21
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 40.81 - 257.82 74.66 373.29
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 40.81 - 138.00 44.70 223.51
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 40.81 - 435.37 119.05 595.23
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.73 46.68 167.70 55.53 277.64
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.73 46.68 202.70 64.28 321.39
610 b RIGHT OF WAY MARKER EACH 74.12 60.88 213.60 87.15 435.75
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 448.94 476.40 1,442.47 591.95 2,959.76
610 d TEN KILOMETER POST EACH 867.88 952.79 3,141.75 1,240.61 6,203.03
Page 91 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.54 6.96 - 1.88 9.38
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.49 102.44 0.88 27.20 136.01
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.55 258.13 1.97 68.91 344.56
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 62.19 1,032.53 7.89 275.65 1,378.26
103 STRIPPING CM 2.00 59.42 - 15.36 76.78
104 COMPACTION OF NATURAL GROUND SM 0.29 5.92 0.62 1.71 8.54
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.68 86.79 - 22.62 113.09
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 98.29 193.76 46.20 84.56 422.81
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 13.32 214.84 - 57.04 285.20
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.87 167.12 - 44.00 219.99
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.01 78.63 - 20.41 102.05
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 98.29 193.76 46.20 84.56 422.81
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 15.63 199.88 - 53.88 269.39
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.77 167.24 - 43.50 217.51
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.03 89.04 0.31 23.85 119.23
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 49.08 165.86 53.31 67.06 335.31
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 86.81 258.51 30.80 94.03 470.15
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 73.07 193.04 - 66.53 332.64
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 44.64 160.37 - 51.25 256.26
107 d GRANULAR BACK FILL CM 26.09 83.07 323.41 108.14 540.71
107 e COMMON BACK FILL CM 18.72 37.31 4.13 15.04 75.20
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.47 106.71 4.13 29.08 145.39
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.71 302.97 48.81 91.87 459.36
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.79 268.11 1.96 70.47 352.33
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.48 238.60 - 62.27 311.35
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.18 112.14 6.81 31.28 156.41
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 92 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.92 46.31 4.13 13.84 69.20
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.29 73.87 2.45 21.90 109.51
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.10 16.84 1.18 4.78 23.90
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.81 10.31 0.63 2.94 14.69
110 IMPROVED SUB-GRADE CM 7.75 75.50 51.82 33.77 168.84
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.67 9.38 0.64 2.67 13.36
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.00 9.92 0.74 2.92 14.58
201 GRANULAR SUB-BASE CM 6.25 106.91 410.42 130.90 654.48
202 AGGREGATE BASE CM 7.20 132.11 493.91 158.31 791.53
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 53.97 916.98 3,361.11 1,083.02 5,415.08
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 55.96 916.98 3,593.28 1,141.56 5,707.78
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 60.29 957.74 3,356.01 1,093.51 5,467.55
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 60.29 954.75 3,676.46 1,172.88 5,864.38
204 b CEMENT STABLIZED BASE CM 21.85 272.73 602.53 224.28 1,121.39
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 193.84 568.44 22,480.80 5,810.77 29,053.85
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 193.84 568.44 21,660.72 5,605.75 28,028.75
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 69.64 55.65 521.93 161.81 809.03
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 112.51 1,408.67 3,015.19 1,134.09 5,670.46
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 76.14 66.68 447.22 147.51 737.55
207 a DEEP PATCHING (0-15 cm) SM 1.38 30.14 1.02 8.14 40.68
207 b DEEP PATCHING (16-30 cm) SM 1.38 26.47 1.02 7.22 36.09
208 REINSTATEMENT OF ROAD SURFACE SM 1.42 37.00 0.45 9.72 48.59
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.80 70.82 0.55 18.29 91.46
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.36 14.16 0.11 3.66 18.29
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.49 5.85 29.24
Page 93 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.49 5.85 29.24
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 9.99 2.58 12.90
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.66 2.25 11.24
304 a SINGLE SURFACE TREATMENT SM 0.60 4.16 42.65 11.85 59.26
304 b DOUBLE SURFACE TREATMENT SM 0.88 8.06 80.14 22.27 111.35
304 c TRIPPLE SURFACE TREATMENT SM 1.48 11.08 95.28 26.96 134.80
304 d SEAL COAT SM 0.55 2.33 25.57 7.11 35.56
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 51.21 906.07 3,950.95 1,227.06 6,135.29
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 51.21 876.73 4,264.95 1,298.22 6,491.11
307 a DENSE GRADED HOT BIT-MAC CM 122.64 171.48 3,270.17 891.07 4,455.36
307 b OPEN GRADED HOT BIT-MAC CM 122.64 171.48 3,169.17 865.82 4,329.11
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.44 456.95 889.78 342.04 1,710.21
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 173.05 465.97 24,454.50 6,273.38 31,366.90
309 a COLD MILLING, 0 - 30 mm SM 0.74 16.87 7.54 6.29 31.44
309 b COLD MILLING, 0 - 50 mm SM 1.23 28.11 12.57 10.48 52.39
309 c COLD MILLING, 0 - 70 mm SM 1.85 42.16 18.85 15.72 78.58
401 ai CONCRETE CLASS "A3" (Underground) CM 389.81 643.62 3,130.02 1,040.86 5,204.31
401 aii CONCRETE CLASS "A3" (Onground) CM 389.81 643.62 3,338.92 1,093.09 5,465.44
401 aiii CONCRETE CLASS "A3" (Elevated) CM 389.81 643.62 3,756.72 1,197.54 5,987.69
401 b CONCRETE CLASS "B" CM 510.53 407.09 2,352.29 817.48 4,087.39
401 ci CONCRETE CLASS "C" (Underground) CM 380.43 258.76 2,787.02 856.55 4,282.76
401 cii CONCRETE CLASS "C" (Onground) CM 380.43 258.76 2,876.12 878.83 4,394.14
401 ciii CONCRETE CLASS "C" (Elevated) CM 380.43 258.76 3,054.31 923.38 4,616.88
401 d CONCRETE CLASS "D1" CM 599.55 810.64 3,997.44 1,351.91 6,759.54
401 e CONCRETE CLASS "Y" CM 830.41 258.76 3,421.42 1,127.65 5,638.24
401 f LEAN CONCRETE CM 325.42 252.12 1,892.96 617.63 3,088.13
Page 94 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,270.48 468.57 3,926.30 1,416.34 7,081.69
401 gii PRECAST CONCRETE CLASS "B" CM 1,270.48 468.57 3,513.71 1,313.19 6,565.95
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,181.83 - 44,463.52 11,411.34 57,056.69
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,181.83 - 45,513.52 11,673.84 58,369.19
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 944.89 2,335.68 37,915.94 10,299.13 51,495.64
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,965.45 6,882.66 81,666.46 22,628.64 113,143.21
405 b LAUNCHING OF GIRDER TON 45.73 403.69 - 112.36 561.78
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 83.83 - 203.72 71.89 359.44
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 83.83 - 212.43 74.07 370.33
406 c STEEL EXPANSION JOINTS KG 6.87 11.61 61.06 19.89 99.43
406 d WATER STOPS 6" SIZE M 72.13 - 307.30 94.86 474.29
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.72 - 1,417.20 361.73 1,808.65
406 g STEEL OR METAL BEARING DEVICES KG 14.82 30.66 81.48 31.74 158.70
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 248.84 847.08 691.63 446.89 2,234.44
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 373.25 1,270.62 1,037.44 670.33 3,351.64
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 373.25 1,270.62 773.51 604.35 3,021.73
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 622.09 2,117.70 922.52 915.58 4,577.89
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 533.22 1,815.17 869.30 804.42 4,022.11
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 933.13 3,176.55 1,177.53 1,321.80 6,609.01
407 h PILE LOAD TEST UPTO 120 TON EACH 16,924.86 19,990.40 80,316.76 29,308.01 146,540.03
407 i PILE LOAD TEST UPTO 240 TON EACH 30,476.94 19,990.40 160,633.52 52,775.22 263,876.08
407 j PILE LOAD TEST UPTO 360 TON EACH 45,724.86 19,990.40 240,950.28 76,666.39 383,331.93
407 k CONFIRMATORY BORING (NX SIZE) M 141.47 826.61 5.16 243.31 1,216.55
410 BRICK WORK CM 239.20 142.50 2,078.59 615.07 3,075.36
411 a STONE MASONRY RANDOM DRY CM 256.24 56.01 408.26 180.13 900.64
Page 95 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 303.24 84.89 1,209.98 399.53 1,997.64
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 349.24 56.01 441.97 211.81 1,059.03
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 395.24 84.89 1,230.94 427.77 2,138.84
411 g ROLL POINTING SM 50.21 5.78 47.09 25.77 128.85
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 520.24 134.30 1,159.57 453.53 2,267.64
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 169.06 230.36 401.02 200.11 1,000.55
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 164.00 297.19 516.57 244.44 1,222.20
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 162.19 514.83 637.46 328.62 1,643.10
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 169.26 639.81 956.04 441.28 2,206.39
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 195.15 704.13 1,291.58 547.72 2,738.58
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 241.24 868.93 1,946.84 764.25 3,821.26
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 312.20 961.94 2,435.89 927.51 4,637.54
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 368.38 1,168.07 3,401.13 1,234.40 6,171.98
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 435.61 1,362.74 5,157.78 1,739.03 8,695.16
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 169.06 263.77 426.13 214.74 1,073.70
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 164.00 297.19 552.65 253.46 1,267.30
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 158.19 514.83 666.32 334.84 1,674.18
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 169.26 639.81 1,022.31 457.85 2,289.23
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 195.15 704.13 1,803.50 675.70 3,378.48
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 241.24 868.93 2,455.57 891.44 4,457.18
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 312.20 961.94 3,128.62 1,100.69 5,503.45
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 368.38 1,168.07 4,089.69 1,406.54 7,032.68
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 435.61 1,362.74 5,633.08 1,857.86 9,289.29
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.75 68.08 404.65 135.37 676.85
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 575.01 309.47 2,405.40 822.47 4,112.35
507 a STEEL WIRE MESH FOR GABIONS KG 4.03 - 69.82 18.46 92.31
Page 96 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 72.67 - 298.78 92.86 464.31
508 a BRICK PAVING (SINGLE COURSE) SM 80.04 15.80 163.21 64.76 323.81
508 b BRICK PAVING (DOUBLE COURSE) SM 142.04 15.80 323.03 120.22 601.09
509 a RIP RAP CLASS "A" CM 345.24 - 336.89 170.53 852.66
509 b RIP RAP CLASS "B" CM 332.19 - 334.19 166.60 832.98
509 c RIP RAP CLASS "C" CM 333.49 - 336.89 167.60 837.98
509 d GROUTED RIP RAP CLASS "A" CM 417.21 35.09 1,405.83 464.53 2,322.66
509 e GROUTED RIP RAP CLASS "B" CM 401.27 28.07 1,292.16 430.38 2,151.88
509 f GROUTED RIP RAP CLASS "C" CM 395.83 23.39 1,324.22 435.86 2,179.30
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 578.21 181.56 2,772.28 883.01 4,415.06
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.39 115.89 324.18 119.12 595.58
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 77.77 194.57 - 68.09 340.43
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 111.09 35.01 54.74 50.21 251.05
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 142.20 44.81 70.07 64.27 321.35
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 179.00 91.01 244.95 128.74 643.70
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 223.74 113.77 306.19 160.93 804.63
603 BRICK EDGING M 6.59 - 24.96 7.89 39.44
605 a CONCRETE BEAM GUARDRAIL M 54.38 14.67 430.37 124.86 624.28
605 c CONCRETE POST FOR GUARDRAIL M 66.77 13.10 427.54 126.85 634.26
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 172.85 128.42 4,820.53 1,280.45 6,402.25
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 52.49 192.63 7,576.22 1,955.34 9,776.68
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 172.85 272.87 9,240.32 2,421.51 12,107.55
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 561.28 304.65 16,738.85 4,401.20 22,005.98
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 112.26 60.93 7,379.10 1,888.07 9,440.36
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 216.26 - 1,036.22 313.12 1,565.60
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 216.26 - 1,554.32 442.65 2,213.23
Page 97 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (51) Panjgoor
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.20 2.85 15.45 5.13 25.63
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.73 1.27 30.86 8.22 41.08
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.20 2.85 20.62 6.42 32.09
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.73 1.27 41.16 10.79 53.95
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 54.75 - 149.30 51.01 255.06
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 54.75 - 388.86 110.90 554.51
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.75 3.56 21.47 6.95 34.73
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.75 4.75 51.71 14.80 74.01
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.75 3.56 28.62 8.73 43.66
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.75 4.75 68.95 19.11 95.56
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 54.75 - 207.26 65.50 327.51
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 54.75 - 652.07 176.71 883.53
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 45.64 - 99.54 36.30 181.48
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 45.64 - 259.63 76.32 381.59
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 45.64 - 138.18 45.96 229.78
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 45.64 - 435.37 120.25 601.26
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.25 46.68 167.67 55.40 277.00
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.25 46.68 202.67 64.15 320.75
610 b RIGHT OF WAY MARKER EACH 76.21 60.88 212.92 87.50 437.51
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 463.00 476.40 1,441.95 595.34 2,976.69
610 d TEN KILOMETER POST EACH 895.99 952.79 3,139.89 1,247.17 6,235.84
Page 98 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.53 6.96 - 1.87 9.36
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.46 102.44 0.88 27.20 135.98
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 15.49 258.13 1.97 68.90 344.49
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 61.98 1,032.53 7.89 275.60 1,378.00
103 STRIPPING CM 2.00 59.42 - 15.36 76.78
104 COMPACTION OF NATURAL GROUND SM 0.28 5.92 0.62 1.71 8.53
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 3.55 86.79 - 22.59 112.93
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 94.54 193.76 46.20 83.63 418.13
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 12.98 214.84 - 56.96 284.78
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 8.58 167.12 - 43.93 219.63
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 2.90 78.63 - 20.38 101.91
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 94.54 193.76 46.20 83.63 418.13
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 14.98 199.88 - 53.72 268.58
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 6.62 167.24 - 43.47 217.33
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 5.95 89.04 0.31 23.83 119.13
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 49.00 165.86 53.31 67.04 335.21
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 83.22 258.51 30.80 93.13 465.66
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 70.05 193.04 - 65.77 328.86
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 42.80 160.37 - 50.79 253.96
107 d GRANULAR BACK FILL CM 25.30 83.07 247.41 88.95 444.73
107 e COMMON BACK FILL CM 18.54 37.31 4.13 15.00 74.98
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.35 106.71 4.13 29.05 145.24
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 15.40 302.97 48.81 91.80 458.98
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 11.55 268.11 1.96 70.41 352.03
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 10.27 238.60 - 62.22 311.09
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.07 112.14 6.81 31.26 156.28
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 99 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 4.84 46.31 4.13 13.82 69.10
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 11.17 73.87 2.45 21.87 109.36
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.07 16.84 1.18 4.77 23.86
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.80 10.31 0.63 2.94 14.68
110 IMPROVED SUB-GRADE CM 7.73 75.50 51.82 33.76 168.81
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.67 9.38 0.64 2.67 13.36
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.01 9.92 0.74 2.92 14.59
201 GRANULAR SUB-BASE CM 6.11 106.91 415.06 132.02 660.10
202 AGGREGATE BASE CM 7.03 132.11 504.34 160.87 804.35
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 53.36 916.98 3,375.85 1,086.55 5,432.74
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 55.20 916.98 3,608.31 1,145.12 5,725.61
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 59.37 957.74 3,370.47 1,096.90 5,484.48
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 59.37 954.75 3,691.35 1,176.37 5,881.84
204 b CEMENT STABLIZED BASE CM 21.38 272.73 616.86 227.74 1,138.71
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 185.74 568.44 22,582.80 5,834.25 29,171.23
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 185.74 568.44 21,762.72 5,629.23 28,146.13
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 69.47 55.65 532.95 164.52 822.59
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 111.05 1,408.67 3,034.76 1,138.62 5,693.10
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 75.69 66.68 477.50 154.97 774.84
207 a DEEP PATCHING (0-15 cm) SM 1.36 30.14 1.02 8.13 40.65
207 b DEEP PATCHING (16-30 cm) SM 1.36 26.47 1.02 7.21 36.06
208 REINSTATEMENT OF ROAD SURFACE SM 1.40 37.00 0.45 9.71 48.56
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.77 70.82 0.55 18.29 91.43
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.35 14.16 0.11 3.66 18.28
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.23 0.67 22.59 5.87 29.36
Page 100 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.22 0.67 22.59 5.87 29.35
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 10.03 2.59 12.95
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.09 0.24 8.71 2.26 11.30
304 a SINGLE SURFACE TREATMENT SM 0.58 4.16 42.93 11.92 59.59
304 b DOUBLE SURFACE TREATMENT SM 0.84 8.06 80.74 22.41 112.05
304 c TRIPPLE SURFACE TREATMENT SM 1.43 11.08 96.03 27.14 135.68
304 d SEAL COAT SM 0.53 2.33 25.70 7.14 35.70
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 50.46 906.07 3,961.62 1,229.54 6,147.69
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 50.46 876.73 4,275.86 1,300.76 6,503.81
307 a DENSE GRADED HOT BIT-MAC CM 123.36 171.48 3,277.78 893.16 4,465.78
307 b OPEN GRADED HOT BIT-MAC CM 123.36 171.48 3,179.68 868.63 4,343.15
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.23 456.95 893.99 343.29 1,716.46
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 166.54 465.97 24,556.50 6,297.25 31,486.26
309 a COLD MILLING, 0 - 30 mm SM 0.73 16.87 7.54 6.29 31.43
309 b COLD MILLING, 0 - 50 mm SM 1.21 28.11 12.57 10.47 52.36
309 c COLD MILLING, 0 - 70 mm SM 1.82 42.16 18.85 15.71 78.54
401 ai CONCRETE CLASS "A3" (Underground) CM 405.83 643.62 3,208.17 1,064.41 5,322.03
401 aii CONCRETE CLASS "A3" (Onground) CM 405.83 643.62 3,417.07 1,116.63 5,583.15
401 aiii CONCRETE CLASS "A3" (Elevated) CM 405.83 643.62 3,834.87 1,221.08 6,105.40
401 b CONCRETE CLASS "B" CM 519.52 407.09 2,380.51 826.78 4,133.90
401 ci CONCRETE CLASS "C" (Underground) CM 397.51 258.76 2,854.36 877.66 4,388.29
401 cii CONCRETE CLASS "C" (Onground) CM 397.51 258.76 2,943.46 899.93 4,499.66
401 ciii CONCRETE CLASS "C" (Elevated) CM 397.51 258.76 3,121.65 944.48 4,722.40
401 d CONCRETE CLASS "D1" CM 632.76 810.64 4,146.88 1,397.57 6,987.85
401 e CONCRETE CLASS "Y" CM 868.54 258.76 3,530.37 1,164.42 5,822.09
401 f LEAN CONCRETE CM 333.31 252.12 1,891.24 619.17 3,095.84
Page 101 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,312.37 468.57 4,000.35 1,445.32 7,226.61
401 gii PRECAST CONCRETE CLASS "B" CM 1,312.37 468.57 3,545.76 1,331.68 6,658.38
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,247.40 - 43,668.80 11,229.05 56,145.25
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,247.40 - 44,718.80 11,491.55 57,457.75
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 989.35 2,335.68 37,177.27 10,125.58 50,627.88
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 1,851.27 6,882.66 81,690.80 22,606.18 113,030.91
405 b LAUNCHING OF GIRDER TON 43.26 403.69 - 111.74 558.69
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 86.84 - 197.91 71.19 355.94
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 86.84 - 206.63 73.37 366.84
406 c STEEL EXPANSION JOINTS KG 7.06 11.61 60.21 19.72 98.60
406 d WATER STOPS 6" SIZE M 79.70 - 306.54 96.56 482.80
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 29.08 - 1,415.55 361.16 1,805.79
406 g STEEL OR METAL BEARING DEVICES KG 14.26 30.66 80.70 31.41 157.03
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 239.30 847.08 519.36 401.44 2,007.18
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 358.95 1,270.62 779.04 602.15 3,010.76
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 358.95 1,270.62 600.50 557.52 2,787.59
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 598.26 2,117.70 748.27 866.06 4,330.29
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 512.79 1,815.17 695.50 755.87 3,779.33
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 897.38 3,176.55 980.35 1,263.57 6,317.85
407 h PILE LOAD TEST UPTO 120 TON EACH 20,331.60 19,990.40 66,330.04 26,663.01 133,315.05
407 i PILE LOAD TEST UPTO 240 TON EACH 30,423.36 19,990.40 132,660.08 45,768.46 228,842.30
407 j PILE LOAD TEST UPTO 360 TON EACH 45,531.60 19,990.40 198,990.12 66,128.03 330,640.15
407 k CONFIRMATORY BORING (NX SIZE) M 137.26 826.61 5.16 242.26 1,211.29
410 BRICK WORK CM 239.07 142.50 2,106.98 622.14 3,110.69
411 a STONE MASONRY RANDOM DRY CM 258.13 56.01 591.38 226.38 1,131.90
Page 102 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 305.13 84.89 1,358.72 437.19 2,185.93
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 351.13 56.01 653.23 265.09 1,325.46
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 397.13 84.89 1,425.88 476.98 2,384.88
411 g ROLL POINTING SM 50.17 5.78 46.93 25.72 128.60
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 522.13 134.30 1,354.50 502.73 2,513.66
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 168.69 230.36 400.79 199.96 999.80
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 163.84 297.19 516.28 244.33 1,221.64
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 161.42 514.83 636.90 328.29 1,641.44
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 168.56 639.81 955.52 440.97 2,204.86
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 193.58 704.13 1,291.06 547.19 2,735.96
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 238.21 868.93 1,946.31 763.36 3,816.81
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 308.27 961.94 2,435.83 926.51 4,632.55
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 363.61 1,168.07 3,401.06 1,233.19 6,165.93
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 428.38 1,362.74 5,157.70 1,737.21 8,686.03
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 168.69 263.77 549.52 245.50 1,227.48
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 163.84 297.19 660.60 280.41 1,402.04
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 156.42 514.83 1,026.56 424.45 2,122.26
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 168.56 639.81 1,772.26 645.16 3,225.79
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 193.58 704.13 2,438.47 834.05 4,170.23
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 238.21 868.93 3,118.91 1,056.51 5,282.56
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 308.27 961.94 3,904.28 1,293.62 6,468.11
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 363.61 1,168.07 5,771.51 1,825.80 9,128.99
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 428.38 1,362.74 5,633.00 1,856.03 9,280.15
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 68.36 68.08 290.22 106.67 533.33
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 598.27 309.47 2,438.29 836.51 4,182.54
507 a STEEL WIRE MESH FOR GABIONS KG 3.95 - 69.82 18.44 92.21
Page 103 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 72.56 - 371.65 111.05 555.26
508 a BRICK PAVING (SINGLE COURSE) SM 79.96 15.80 160.91 64.17 320.84
508 b BRICK PAVING (DOUBLE COURSE) SM 141.96 15.80 320.02 119.45 597.23
509 a RIP RAP CLASS "A" CM 344.60 - 520.00 216.15 1,080.75
509 b RIP RAP CLASS "B" CM 331.68 - 515.84 211.88 1,059.40
509 c RIP RAP CLASS "C" CM 333.06 - 520.00 213.27 1,066.33
509 d GROUTED RIP RAP CLASS "A" CM 411.34 35.09 1,504.46 487.72 2,438.61
509 e GROUTED RIP RAP CLASS "B" CM 395.50 28.07 1,398.21 455.45 2,277.23
509 f GROUTED RIP RAP CLASS "C" CM 390.33 23.39 1,425.88 459.90 2,299.50
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 597.51 181.56 2,851.47 907.64 4,538.18
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.39 115.89 247.35 99.91 499.54
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 76.41 194.57 - 67.75 338.73
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 111.42 35.01 84.50 57.73 288.66
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 142.61 44.81 108.16 73.90 369.48
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 179.41 91.01 260.46 132.72 663.60
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 224.27 113.77 325.57 165.90 829.51
603 BRICK EDGING M 6.61 - 25.92 8.13 40.66
605 a CONCRETE BEAM GUARDRAIL M 55.03 14.67 430.17 124.97 624.84
605 c CONCRETE POST FOR GUARDRAIL M 67.57 13.10 427.76 127.11 635.54
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 170.31 128.42 4,836.85 1,283.90 6,419.48
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.86 192.63 7,583.17 1,957.92 9,789.58
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 170.31 272.87 9,257.87 2,425.26 12,126.31
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 557.47 304.65 16,757.02 4,404.79 22,023.93
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 111.49 60.93 7,372.95 1,886.34 9,431.71
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 212.04 - 1,033.28 311.33 1,556.65
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 212.04 - 1,549.92 440.49 2,202.45
Page 104 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (53) Pishin
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.17 2.85 15.43 5.11 25.56
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.72 1.27 30.68 8.17 40.84
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.17 2.85 20.59 6.40 32.01
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.72 1.27 40.93 10.73 53.65
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 52.16 - 149.10 50.32 251.58
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 52.16 - 386.67 109.71 548.54
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.72 3.56 21.45 6.93 34.66
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.72 4.75 51.71 14.80 73.98
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.72 3.56 28.59 8.72 43.59
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.72 4.75 68.95 19.11 95.53
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 52.16 - 207.06 64.81 324.03
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 52.16 - 652.07 176.06 880.29
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 43.65 - 99.40 35.76 178.81
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 43.65 - 258.17 75.46 377.28
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 43.65 - 138.04 45.42 227.11
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 43.65 - 435.37 119.76 598.78
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.84 46.68 167.78 55.58 277.88
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.84 46.68 202.78 64.33 321.63
610 b RIGHT OF WAY MARKER EACH 77.21 60.88 215.50 88.40 441.99
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 462.68 476.40 1,438.16 594.31 2,971.55
610 d TEN KILOMETER POST EACH 895.35 952.79 3,174.11 1,255.56 6,277.81
Page 105 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.88 102.44 0.88 27.30 136.50
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.23 258.13 1.97 69.08 345.41
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 64.93 1,032.53 7.89 276.34 1,381.69
103 STRIPPING CM 2.19 59.42 - 15.40 77.01
104 COMPACTION OF NATURAL GROUND SM 0.32 5.92 0.62 1.72 8.58
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.54 86.79 - 22.83 114.16
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 112.48 193.76 46.20 88.11 440.55
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.72 214.84 - 57.39 286.95
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.89 167.12 - 44.25 221.26
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.71 78.63 - 20.59 102.93
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 112.48 193.76 46.20 88.11 440.55
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.93 199.88 - 54.45 272.26
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.52 167.24 - 43.69 218.45
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.19 89.04 0.31 24.14 120.68
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 54.01 165.86 53.31 68.30 341.48
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 99.63 258.51 30.80 97.24 486.18
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 83.34 193.04 - 69.10 345.48
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 51.24 160.37 - 52.90 264.51
107 d GRANULAR BACK FILL CM 28.44 83.07 268.21 94.93 474.65
107 e COMMON BACK FILL CM 18.96 37.31 4.13 15.10 75.50
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.25 106.71 4.13 29.27 146.36
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 17.45 302.97 48.81 92.31 461.54
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 13.09 268.11 1.96 70.79 353.95
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.63 238.60 - 62.56 312.79
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.91 112.14 6.81 31.47 157.33
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 106 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.56 46.31 4.13 14.00 70.00
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.40 73.87 2.45 22.18 110.90
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.25 16.84 1.18 4.82 24.09
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.93 10.31 0.63 2.97 14.84
110 IMPROVED SUB-GRADE CM 8.67 75.50 54.39 34.64 173.20
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.74 9.38 0.64 2.69 13.45
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.12 9.92 0.74 2.95 14.73
201 GRANULAR SUB-BASE CM 7.05 106.91 359.17 118.28 591.41
202 AGGREGATE BASE CM 8.39 132.11 483.45 155.99 779.94
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 56.25 916.98 3,347.91 1,080.29 5,401.43
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 58.70 916.98 3,579.71 1,138.85 5,694.24
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 63.36 957.74 3,342.60 1,090.93 5,454.63
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 63.36 954.75 3,662.75 1,170.22 5,851.08
204 b CEMENT STABLIZED BASE CM 24.90 272.73 593.34 222.74 1,113.71
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 220.43 568.44 22,480.80 5,817.42 29,087.09
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 220.43 568.44 21,660.72 5,612.40 28,061.99
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 68.65 55.65 510.86 158.79 793.95
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 121.50 1,408.67 3,003.57 1,133.44 5,667.18
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 74.46 66.68 438.46 144.90 724.50
207 a DEEP PATCHING (0-15 cm) SM 1.55 30.14 1.02 8.18 40.89
207 b DEEP PATCHING (16-30 cm) SM 1.55 26.47 1.02 7.26 36.30
208 REINSTATEMENT OF ROAD SURFACE SM 1.63 37.00 0.45 9.77 48.85
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.13 70.82 0.55 18.38 91.88
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.43 14.16 0.11 3.68 18.38
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 0.67 22.49 5.86 29.29
Page 107 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.49 5.86 29.28
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 9.99 2.59 12.93
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.66 2.25 11.26
304 a SINGLE SURFACE TREATMENT SM 0.70 4.16 42.59 11.86 59.31
304 b DOUBLE SURFACE TREATMENT SM 1.02 8.06 79.95 22.26 111.29
304 c TRIPPLE SURFACE TREATMENT SM 1.72 11.08 95.01 26.95 134.76
304 d SEAL COAT SM 0.65 2.33 25.55 7.13 35.66
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.61 906.07 3,933.36 1,223.51 6,117.55
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.61 876.73 4,246.15 1,294.37 6,471.86
307 a DENSE GRADED HOT BIT-MAC CM 128.58 171.48 3,233.41 883.37 4,416.84
307 b OPEN GRADED HOT BIT-MAC CM 128.58 171.48 3,133.33 858.35 4,291.74
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.01 456.95 887.97 341.98 1,709.91
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 194.84 465.97 24,454.50 6,278.83 31,394.14
309 a COLD MILLING, 0 - 30 mm SM 0.85 16.87 7.54 6.32 31.58
309 b COLD MILLING, 0 - 50 mm SM 1.42 28.11 12.57 10.53 52.63
309 c COLD MILLING, 0 - 70 mm SM 2.12 42.16 18.85 15.78 78.91
401 ai CONCRETE CLASS "A3" (Underground) CM 424.63 643.62 3,204.14 1,068.10 5,340.49
401 aii CONCRETE CLASS "A3" (Onground) CM 424.63 643.62 3,413.04 1,120.32 5,601.61
401 aiii CONCRETE CLASS "A3" (Elevated) CM 424.63 643.62 3,830.84 1,224.77 6,123.86
401 b CONCRETE CLASS "B" CM 558.17 407.09 2,400.83 841.52 4,207.61
401 ci CONCRETE CLASS "C" (Underground) CM 405.44 258.76 2,852.27 879.12 4,395.59
401 cii CONCRETE CLASS "C" (Onground) CM 405.44 258.76 2,941.37 901.39 4,506.96
401 ciii CONCRETE CLASS "C" (Elevated) CM 405.44 369.33 3,015.48 947.56 4,737.81
401 d CONCRETE CLASS "D1" CM 645.76 810.64 4,105.43 1,390.46 6,952.29
401 e CONCRETE CLASS "Y" CM 881.32 258.76 3,508.97 1,162.26 5,811.31
401 f LEAN CONCRETE CM 334.82 252.12 1,925.66 628.15 3,140.75
Page 108 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,324.04 468.57 4,001.25 1,448.47 7,242.33
401 gii PRECAST CONCRETE CLASS "B" CM 1,324.04 468.57 3,563.15 1,338.94 6,694.70
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,297.34 - 43,669.58 11,241.73 56,208.65
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,297.34 - 44,719.58 11,504.23 57,521.15
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,034.66 2,335.68 37,252.75 10,155.77 50,778.86
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,355.74 6,882.66 81,687.44 22,731.46 113,657.30
405 b LAUNCHING OF GIRDER TON 54.72 403.69 - 114.60 573.01
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 88.67 - 203.05 72.93 364.65
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 88.67 - 211.76 75.11 375.54
406 c STEEL EXPANSION JOINTS KG 7.32 11.61 60.08 19.75 98.76
406 d WATER STOPS 6" SIZE M 77.26 - 307.22 96.12 480.60
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 31.90 - 1,417.00 362.23 1,811.13
406 g STEEL OR METAL BEARING DEVICES KG 15.86 30.66 80.62 31.79 158.93
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 296.99 847.08 843.26 496.83 2,484.16
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 445.49 1,270.62 1,264.89 745.25 3,726.25
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 445.49 1,270.62 932.19 662.08 3,310.38
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 742.48 2,117.70 1,095.31 988.87 4,944.36
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 636.41 1,815.17 1,037.05 872.16 4,360.79
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,113.72 3,176.55 1,385.15 1,418.86 7,094.28
407 h PILE LOAD TEST UPTO 120 TON EACH 17,483.04 19,990.40 70,992.28 27,116.43 135,582.15
407 i PILE LOAD TEST UPTO 240 TON EACH 29,039.04 19,990.40 141,984.56 47,753.50 238,767.50
407 j PILE LOAD TEST UPTO 360 TON EACH 43,583.04 19,990.40 212,976.84 69,137.57 345,687.85
407 k CONFIRMATORY BORING (NX SIZE) M 153.00 826.61 5.16 246.19 1,230.96
410 BRICK WORK CM 248.07 142.50 2,147.14 634.43 3,172.14
411 a STONE MASONRY RANDOM DRY CM 266.50 56.01 368.24 172.69 863.44
Page 109 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 312.80 84.89 1,189.29 396.75 1,983.73
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 360.40 56.01 412.24 207.16 1,035.81
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 408.00 84.89 1,220.67 428.39 2,141.95
411 g ROLL POINTING SM 51.87 5.78 47.63 26.32 131.60
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 531.90 134.30 1,149.29 453.87 2,269.36
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 169.71 230.36 402.07 200.54 1,002.68
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 163.39 297.19 517.82 244.60 1,223.00
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 166.36 514.83 638.80 330.00 1,649.99
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 171.69 639.81 957.68 442.30 2,211.48
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 199.29 704.13 1,293.22 549.16 2,745.80
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 248.47 868.93 1,949.32 766.68 3,833.40
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 321.55 961.94 2,438.60 930.52 4,652.61
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 378.81 1,168.07 3,404.43 1,237.83 6,189.14
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 448.87 1,362.74 5,161.63 1,743.31 8,716.55
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 169.71 263.77 426.95 215.11 1,075.54
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 163.39 297.19 553.90 253.62 1,268.10
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 162.36 514.83 667.66 336.21 1,681.06
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 171.69 639.81 1,023.52 458.76 2,293.78
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 199.29 704.13 1,805.60 677.26 3,386.28
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 248.47 868.93 2,458.05 893.86 4,469.31
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 321.55 961.94 3,131.33 1,103.71 5,518.53
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 378.81 1,168.07 4,092.99 1,409.97 7,049.84
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 448.87 1,362.74 5,636.93 1,862.14 9,310.68
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 71.49 68.08 315.65 113.81 569.03
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 625.61 309.47 2,456.39 847.87 4,239.34
507 a STEEL WIRE MESH FOR GABIONS KG 4.39 - 73.81 19.55 97.75
Page 110 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 73.06 - 249.18 80.56 402.80
508 a BRICK PAVING (SINGLE COURSE) SM 81.94 15.80 163.56 65.33 326.63
508 b BRICK PAVING (DOUBLE COURSE) SM 144.54 15.80 324.79 121.28 606.41
509 a RIP RAP CLASS "A" CM 355.26 - 296.86 163.03 815.15
509 b RIP RAP CLASS "B" CM 340.29 - 294.49 158.70 793.48
509 c RIP RAP CLASS "C" CM 341.18 - 296.86 159.51 797.55
509 d GROUTED RIP RAP CLASS "A" CM 412.47 35.09 1,326.37 443.48 2,217.41
509 e GROUTED RIP RAP CLASS "B" CM 396.12 28.07 1,217.12 410.33 2,051.64
509 f GROUTED RIP RAP CLASS "C" CM 389.50 23.39 1,247.09 415.00 2,074.98
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 596.38 181.56 2,845.60 905.89 4,529.43
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.84 115.89 268.46 105.30 526.49
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 85.31 194.57 - 69.97 349.85
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 115.04 35.01 48.24 49.57 247.86
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 147.25 44.81 61.75 63.45 317.26
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 185.33 91.01 237.88 128.56 642.78
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 231.66 113.77 297.36 160.70 803.49
603 BRICK EDGING M 6.82 - 25.92 8.19 40.93
605 a CONCRETE BEAM GUARDRAIL M 54.57 14.67 429.77 124.75 623.76
605 c CONCRETE POST FOR GUARDRAIL M 67.00 13.10 427.29 126.85 634.24
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 179.03 128.42 4,830.37 1,284.46 6,422.28
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 54.10 192.63 7,589.52 1,959.06 9,795.31
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 179.03 272.87 9,266.17 2,429.52 12,147.59
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 556.15 304.65 16,776.71 4,409.38 22,046.89
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 111.23 60.93 7,385.57 1,889.43 9,447.16
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 245.56 - 1,035.88 320.36 1,601.80
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 245.56 - 1,553.83 449.85 2,249.24
Page 111 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54A) Qila Saifullah
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.30 2.85 15.45 5.15 25.75
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.77 1.27 30.84 8.22 41.10
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.30 2.85 20.61 6.44 32.20
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.77 1.27 41.13 10.79 53.96
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 59.58 - 149.28 52.22 261.08
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 59.58 - 388.59 112.04 560.21
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.87 3.56 21.46 6.97 34.86
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.87 4.75 51.71 14.83 74.16
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.87 3.56 28.62 8.76 43.81
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.87 4.75 68.95 19.14 95.71
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 59.58 - 207.24 66.71 333.53
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 59.58 - 652.07 177.91 889.56
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 49.45 - 99.52 37.24 186.21
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 49.45 - 259.45 77.23 386.13
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 49.45 - 138.16 46.90 234.51
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 49.45 - 435.37 121.21 606.03
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.67 46.68 167.77 55.53 277.65
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.67 46.68 202.77 64.28 321.40
610 b RIGHT OF WAY MARKER EACH 75.52 60.88 215.17 87.89 439.46
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 473.47 476.40 1,446.65 599.13 2,995.65
610 d TEN KILOMETER POST EACH 914.34 952.79 3,169.40 1,259.13 6,295.66
Page 112 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.60 6.96 - 1.89 9.45
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.24 102.44 0.88 27.39 136.95
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 17.54 258.13 1.97 69.41 347.05
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 70.15 1,032.53 7.89 277.64 1,388.21
103 STRIPPING CM 2.26 59.42 - 15.42 77.10
104 COMPACTION OF NATURAL GROUND SM 0.33 5.92 0.62 1.72 8.59
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.25 86.79 - 22.76 113.80
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 110.86 193.76 46.20 87.71 438.53
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.55 214.84 - 57.35 286.74
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.53 167.12 - 44.16 220.81
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.48 78.63 - 20.53 102.64
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 110.86 193.76 46.20 87.71 438.53
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.60 199.88 - 54.37 271.85
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.37 167.24 - 43.65 218.26
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.67 89.04 0.31 24.01 120.03
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 52.20 165.86 53.31 67.84 339.21
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 97.77 258.51 30.80 96.77 483.85
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 81.87 193.04 - 68.73 343.64
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 50.28 160.37 - 52.66 263.31
107 d GRANULAR BACK FILL CM 29.20 83.07 387.54 124.95 624.76
107 e COMMON BACK FILL CM 21.00 37.31 4.13 15.61 78.05
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 5.91 106.71 4.13 29.19 145.94
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 17.29 302.97 48.81 92.27 461.34
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 12.97 268.11 1.96 70.76 353.80
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.53 238.60 - 62.53 312.66
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.69 112.14 6.81 31.41 157.05
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 113 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.40 46.31 4.13 13.96 69.80
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.35 73.87 2.45 22.17 110.84
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.21 16.84 1.18 4.81 24.04
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.90 10.31 0.63 2.96 14.80
110 IMPROVED SUB-GRADE CM 8.54 75.50 51.96 34.00 170.00
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.76 9.38 0.64 2.70 13.48
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.09 9.92 0.74 2.94 14.69
201 GRANULAR SUB-BASE CM 6.80 106.91 337.35 112.77 563.83
202 AGGREGATE BASE CM 7.93 132.11 473.01 153.26 766.31
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 58.00 916.98 3,341.66 1,079.16 5,395.80
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 59.84 916.98 3,573.29 1,137.53 5,687.64
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 64.38 957.74 3,336.48 1,089.65 5,448.25
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 64.38 954.75 3,656.50 1,168.91 5,844.54
204 b CEMENT STABLIZED BASE CM 24.06 272.73 583.32 220.03 1,100.14
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 215.29 568.44 22,378.80 5,790.63 28,953.16
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 215.29 568.44 21,558.72 5,585.61 27,928.06
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 76.46 55.65 499.84 157.99 789.94
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 120.19 1,408.67 2,991.78 1,130.16 5,650.80
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 83.46 66.68 370.05 130.05 650.24
207 a DEEP PATCHING (0-15 cm) SM 1.55 30.14 1.02 8.18 40.89
207 b DEEP PATCHING (16-30 cm) SM 1.55 26.47 1.02 7.26 36.30
208 REINSTATEMENT OF ROAD SURFACE SM 1.63 37.00 0.45 9.77 48.85
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.06 70.82 0.55 18.36 91.79
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.41 14.16 0.11 3.67 18.35
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.39 5.83 29.15
Page 114 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 0.67 22.39 5.83 29.14
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 9.95 2.57 12.86
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.24 8.62 2.24 11.20
304 a SINGLE SURFACE TREATMENT SM 0.68 4.16 42.32 11.79 58.95
304 b DOUBLE SURFACE TREATMENT SM 0.97 8.06 79.35 22.10 110.48
304 c TRIPPLE SURFACE TREATMENT SM 1.65 11.08 94.27 26.75 133.75
304 d SEAL COAT SM 0.63 2.33 25.44 7.10 35.50
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.53 906.07 3,930.31 1,222.73 6,113.64
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.53 876.73 4,243.69 1,293.74 6,468.69
307 a DENSE GRADED HOT BIT-MAC CM 133.97 171.48 3,246.61 888.02 4,440.08
307 b OPEN GRADED HOT BIT-MAC CM 133.97 171.48 3,143.46 862.23 4,311.14
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 22.77 456.95 892.80 343.13 1,715.65
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 196.09 465.97 24,454.50 6,279.14 31,395.70
309 a COLD MILLING, 0 - 30 mm SM 0.82 16.87 7.54 6.31 31.54
309 b COLD MILLING, 0 - 50 mm SM 1.37 28.11 12.57 10.51 52.56
309 c COLD MILLING, 0 - 70 mm SM 2.05 42.16 18.85 15.77 78.83
401 ai CONCRETE CLASS "A3" (Underground) CM 412.75 643.62 3,159.45 1,053.96 5,269.78
401 aii CONCRETE CLASS "A3" (Onground) CM 412.75 643.62 3,368.35 1,106.18 5,530.90
401 aiii CONCRETE CLASS "A3" (Elevated) CM 412.75 643.62 3,786.15 1,210.63 6,053.15
401 b CONCRETE CLASS "B" CM 551.60 407.09 2,345.00 825.92 4,129.61
401 ci CONCRETE CLASS "C" (Underground) CM 406.85 258.76 2,816.38 870.50 4,352.49
401 cii CONCRETE CLASS "C" (Onground) CM 406.85 258.76 2,905.48 892.77 4,463.86
401 ciii CONCRETE CLASS "C" (Elevated) CM 406.85 258.76 3,083.67 937.32 4,686.60
401 d CONCRETE CLASS "D1" CM 634.52 810.64 4,073.47 1,379.66 6,898.29
401 e CONCRETE CLASS "Y" CM 881.01 258.76 3,474.64 1,153.60 5,768.01
401 f LEAN CONCRETE CM 357.20 252.12 1,866.67 619.00 3,094.99
Page 115 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,373.45 468.57 3,952.30 1,448.58 7,242.90
401 gii PRECAST CONCRETE CLASS "B" CM 1,373.45 468.57 3,506.24 1,337.07 6,685.33
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,258.92 - 41,816.33 10,768.81 53,844.06
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,258.92 - 42,866.33 11,031.31 55,156.56
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 993.10 2,335.68 35,630.47 9,739.81 48,699.06
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,087.16 6,882.66 81,679.00 22,662.21 113,311.03
405 b LAUNCHING OF GIRDER TON 48.48 403.69 - 113.04 565.21
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 90.64 - 196.29 71.73 358.66
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 90.64 - 205.01 73.91 369.56
406 c STEEL EXPANSION JOINTS KG 7.36 11.61 58.03 19.25 96.25
406 d WATER STOPS 6" SIZE M 78.29 - 306.38 96.17 480.84
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 32.03 - 1,414.93 361.74 1,808.70
406 g STEEL OR METAL BEARING DEVICES KG 16.31 30.66 78.67 31.41 157.05
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 272.50 847.08 700.24 454.96 2,274.78
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 408.75 1,270.62 1,050.37 682.44 3,412.18
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 408.75 1,270.62 786.21 616.40 3,081.98
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 681.25 2,117.70 943.68 935.66 4,678.29
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 583.93 1,815.17 887.44 821.64 4,108.18
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,021.88 3,176.55 1,209.28 1,351.93 6,759.64
407 h PILE LOAD TEST UPTO 120 TON EACH 18,716.62 19,990.40 89,641.25 32,087.07 160,435.34
407 i PILE LOAD TEST UPTO 240 TON EACH 33,433.38 19,990.40 179,282.49 58,176.57 290,882.84
407 j PILE LOAD TEST UPTO 360 TON EACH 50,223.82 19,990.40 268,923.74 84,784.49 423,922.45
407 k CONFIRMATORY BORING (NX SIZE) M 156.00 826.61 5.16 246.94 1,234.71
410 BRICK WORK CM 256.17 142.50 2,138.08 634.19 3,170.94
411 a STONE MASONRY RANDOM DRY CM 275.07 56.01 347.16 169.56 847.80
Page 116 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 325.60 84.89 1,124.76 383.81 1,919.06
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 374.16 56.01 389.50 204.92 1,024.59
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 422.71 84.89 1,166.47 418.52 2,092.59
411 g ROLL POINTING SM 53.28 5.78 46.95 26.50 132.51
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 556.80 134.30 1,095.10 446.55 2,232.75
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 186.62 230.36 400.81 204.45 1,022.24
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 180.50 297.19 516.31 248.50 1,242.50
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 178.99 514.83 637.01 332.71 1,663.54
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 186.59 639.81 955.61 445.50 2,227.51
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 212.97 704.13 1,291.15 552.06 2,760.31
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 261.42 868.93 1,946.35 769.18 3,845.88
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 338.30 961.94 2,435.70 933.99 4,669.93
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 399.71 1,168.07 3,400.91 1,242.17 6,210.86
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 471.97 1,362.74 5,157.52 1,748.06 8,740.29
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 186.62 263.77 424.15 218.64 1,093.18
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 180.50 297.19 552.39 257.52 1,287.60
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 174.61 514.83 665.87 338.83 1,694.14
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 186.59 639.81 1,021.90 462.08 2,310.38
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 212.97 704.13 1,803.36 680.12 3,400.58
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 261.42 868.93 2,455.08 896.36 4,481.79
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 338.30 961.94 3,128.43 1,107.17 5,535.84
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 399.71 1,168.07 4,089.46 1,414.31 7,071.55
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 471.97 1,362.74 5,632.82 1,866.88 9,334.41
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 77.30 68.08 474.59 154.99 774.96
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 618.45 309.47 2,401.11 832.26 4,161.29
507 a STEEL WIRE MESH FOR GABIONS KG 4.34 - 73.81 19.54 97.69
Page 117 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 80.81 - 391.67 118.12 590.60
508 a BRICK PAVING (SINGLE COURSE) SM 85.70 15.80 176.98 69.62 348.10
508 b BRICK PAVING (DOUBLE COURSE) SM 151.75 15.80 349.51 129.27 646.33
509 a RIP RAP CLASS "A" CM 369.73 - 275.79 161.38 806.90
509 b RIP RAP CLASS "B" CM 355.63 - 273.58 157.30 786.51
509 c RIP RAP CLASS "C" CM 356.58 - 275.79 158.09 790.46
509 d GROUTED RIP RAP CLASS "A" CM 449.48 35.09 1,285.42 442.50 2,212.49
509 e GROUTED RIP RAP CLASS "B" CM 431.94 28.07 1,178.53 409.64 2,048.18
509 f GROUTED RIP RAP CLASS "C" CM 426.11 23.39 1,204.53 413.51 2,067.54
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 621.25 181.56 2,799.13 900.49 4,502.43
509 h FILTER LAYER OF GRANULAR MATERIAL CM 39.31 115.89 388.79 136.00 679.99
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 86.98 194.57 - 70.39 351.94
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 120.34 35.01 44.82 50.04 250.21
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 154.03 44.81 57.36 64.05 320.25
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 192.87 91.01 238.46 130.59 652.93
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 241.09 113.77 298.08 163.24 816.18
603 BRICK EDGING M 7.20 - 26.40 8.40 42.00
605 a CONCRETE BEAM GUARDRAIL M 59.15 14.67 419.90 123.43 617.15
605 c CONCRETE POST FOR GUARDRAIL M 72.63 13.10 416.28 125.50 627.51
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 188.43 128.42 4,823.87 1,285.18 6,425.90
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.86 192.63 7,569.84 1,954.58 9,772.91
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 188.43 272.87 9,234.13 2,423.86 12,119.29
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 611.26 304.65 16,719.47 4,408.85 22,044.23
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 122.25 60.93 7,363.11 1,886.57 9,432.86
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 243.84 - 1,032.58 319.11 1,595.53
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 243.84 - 1,548.87 448.18 2,240.89
Page 118 / 140
General Revision- IV
CSR - 2005
CODE
DESCRIPTION UNIT
MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (54) Quetta
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.39 2.85 15.43 5.17 25.84
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.80 1.27 30.64 8.18 40.89
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.39 2.85 20.58 6.46 32.28
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.80 1.27 40.87 10.74 53.68
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 56.79 - 149.05 51.46 257.30
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 56.79 - 110.73 41.88 209.40
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 2.99 3.56 21.44 7.00 34.99
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 2.99 4.75 51.71 14.86 74.31
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 2.99 3.56 28.59 8.79 43.93
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 2.99 4.75 68.95 19.17 95.86
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 56.79 - 207.01 65.95 329.75
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 56.79 - 652.07 177.22 886.08
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 47.48 - 99.36 36.71 183.55
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 47.48 - 257.82 76.33 381.63
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 47.48 - 138.00 46.37 231.85
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 47.48 - 435.37 120.71 603.56
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.65 46.68 167.74 55.52 277.59
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.65 46.68 202.74 64.27 321.34
610 b RIGHT OF WAY MARKER EACH 83.50 60.88 211.43 88.95 444.76
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 500.72 476.40 1,404.76 595.47 2,977.35
610 d TEN KILOMETER POST EACH 970.38 952.79 3,092.25 1,253.86 6,269.28
Page 119 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.85 102.44 0.88 27.29 136.46
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.16 258.13 1.97 69.07 345.33
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 64.65 1,032.53 7.89 276.27 1,381.34
103 STRIPPING CM 2.26 59.42 - 15.42 77.10
104 COMPACTION OF NATURAL GROUND SM 0.33 5.92 0.62 1.72 8.59
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.48 86.79 - 22.82 114.09
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 111.99 193.76 46.20 87.99 439.94
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.65 214.84 - 57.37 286.86
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.86 167.12 - 44.25 221.23
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.66 78.63 - 20.57 102.86
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 111.99 193.76 46.20 87.99 439.94
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.78 199.88 - 54.42 272.08
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.50 167.24 - 43.69 218.43
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.22 89.04 0.31 24.14 120.71
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 56.62 165.86 53.31 68.95 344.74
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 98.80 258.51 30.80 97.03 485.14
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 82.49 193.04 - 68.88 344.41
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 50.81 160.37 - 52.80 263.98
107 d GRANULAR BACK FILL CM 28.12 83.07 413.18 131.09 655.46
107 e COMMON BACK FILL CM 19.05 37.31 4.13 15.12 75.61
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.19 106.71 4.13 29.26 146.29
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 17.44 302.97 48.81 92.31 461.53
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 13.08 268.11 1.96 70.79 353.94
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.63 238.60 - 62.56 312.79
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.86 112.14 6.81 31.45 157.26
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 120 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.59 46.31 4.13 14.01 70.04
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.44 73.87 2.45 22.19 110.95
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.24 16.84 1.18 4.82 24.08
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.94 10.31 0.63 2.97 14.85
110 IMPROVED SUB-GRADE CM 8.55 75.50 61.91 36.49 182.45
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.76 9.38 0.64 2.70 13.48
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.14 9.92 0.64 2.93 14.63
201 GRANULAR SUB-BASE CM 6.96 106.91 411.05 131.23 656.15
202 AGGREGATE BASE CM 7.96 132.11 504.34 161.10 805.51
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 54.78 916.98 3,360.20 1,082.99 5,414.95
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 56.93 916.98 3,590.17 1,141.02 5,705.10
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 61.92 957.74 3,354.86 1,093.63 5,468.15
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 61.92 954.75 3,672.86 1,172.38 5,861.91
204 b CEMENT STABLIZED BASE CM 23.74 272.73 618.98 228.86 1,144.31
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 225.00 568.44 22,378.80 5,793.06 28,965.30
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 225.00 568.44 21,558.72 5,588.04 27,940.20
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 68.88 55.65 532.94 164.37 821.84
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 118.18 1,408.67 3,021.54 1,137.10 5,685.49
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 74.27 66.68 477.99 154.74 773.68
207 a DEEP PATCHING (0-15 cm) SM 1.58 30.14 1.02 8.19 40.93
207 b DEEP PATCHING (16-30 cm) SM 1.58 26.47 1.02 7.27 36.34
208 REINSTATEMENT OF ROAD SURFACE SM 1.58 37.00 0.45 9.76 48.79
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.25 70.82 0.55 18.41 92.03
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.45 14.16 0.11 3.68 18.40
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.39 5.83 29.15
Page 121 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.39 5.83 29.15
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 9.95 2.58 12.88
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.62 2.24 11.21
304 a SINGLE SURFACE TREATMENT SM 0.69 4.16 42.52 11.84 59.21
304 b DOUBLE SURFACE TREATMENT SM 1.00 8.06 79.95 22.25 111.26
304 c TRIPPLE SURFACE TREATMENT SM 1.70 11.08 95.10 26.97 134.85
304 d SEAL COAT SM 0.63 2.33 25.50 7.12 35.58
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 52.73 906.07 3,940.93 1,224.93 6,124.66
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 52.73 876.73 4,252.92 1,295.60 6,477.98
307 a DENSE GRADED HOT BIT-MAC CM 124.32 171.48 3,258.15 888.49 4,442.44
307 b OPEN GRADED HOT BIT-MAC CM 124.32 171.48 3,160.38 864.05 4,320.23
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 21.74 456.95 889.18 341.97 1,709.84
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 202.60 465.97 24,352.50 6,255.27 31,276.34
309 a COLD MILLING, 0 - 30 mm SM 0.82 16.87 7.54 6.31 31.54
309 b COLD MILLING, 0 - 50 mm SM 1.36 28.11 12.57 10.51 52.55
309 c COLD MILLING, 0 - 70 mm SM 2.04 42.16 18.85 15.76 78.81
401 ai CONCRETE CLASS "A3" (Underground) CM 454.84 643.62 3,130.35 1,057.20 5,286.01
401 aii CONCRETE CLASS "A3" (Onground) CM 454.84 643.62 3,339.25 1,109.43 5,547.14
401 aiii CONCRETE CLASS "A3" (Elevated) CM 454.84 643.62 3,757.05 1,213.88 6,069.39
401 b CONCRETE CLASS "B" CM 577.48 407.09 2,348.72 833.32 4,166.61
401 ci CONCRETE CLASS "C" (Underground) CM 437.88 258.76 2,788.29 871.23 4,356.16
401 cii CONCRETE CLASS "C" (Onground) CM 437.88 258.76 2,877.38 893.51 4,467.53
401 ciii CONCRETE CLASS "C" (Elevated) CM 437.88 258.76 3,055.57 938.05 4,690.26
401 d CONCRETE CLASS "D1" CM 712.39 810.64 4,001.17 1,381.05 6,905.25
401 e CONCRETE CLASS "Y" CM 989.01 258.76 3,424.85 1,168.16 5,840.78
401 f LEAN CONCRETE CM 349.88 252.12 1,888.43 622.61 3,113.04
Page 122 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,440.48 468.57 3,926.56 1,458.90 7,294.51
401 gii PRECAST CONCRETE CLASS "B" CM 1,440.48 468.57 3,510.51 1,354.89 6,774.45
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,423.46 - 44,462.43 11,471.47 57,357.36
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,423.46 - 45,512.43 11,733.97 58,669.86
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,121.11 2,335.68 37,803.35 10,315.04 51,575.18
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,256.21 6,882.66 81,648.58 22,696.86 113,484.31
405 b LAUNCHING OF GIRDER TON 52.56 403.69 - 114.06 570.31
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 95.78 - 196.43 73.05 365.26
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 95.78 - 205.16 75.24 376.18
406 c STEEL EXPANSION JOINTS KG 8.06 11.61 61.23 20.23 101.13
406 d WATER STOPS 6" SIZE M 83.37 - 306.39 97.44 487.20
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 35.60 - 1,414.99 362.65 1,813.24
406 g STEEL OR METAL BEARING DEVICES KG 16.33 30.66 81.59 32.15 160.73
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 292.27 847.08 820.21 489.89 2,449.45
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 438.40 1,270.62 1,230.31 734.83 3,674.16
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 438.40 1,270.62 931.79 660.20 3,301.01
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 730.67 2,117.70 1,140.48 997.21 4,986.06
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 626.29 1,815.17 1,065.94 876.85 4,384.25
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,096.01 3,176.55 1,478.68 1,437.81 7,189.05
407 h PILE LOAD TEST UPTO 120 TON EACH 16,541.40 19,990.40 89,641.24 31,543.26 157,716.30
407 i PILE LOAD TEST UPTO 240 TON EACH 29,058.12 19,990.40 179,282.48 57,082.75 285,413.75
407 j PILE LOAD TEST UPTO 360 TON EACH 43,541.40 19,990.40 268,923.72 83,113.88 415,569.40
407 k CONFIRMATORY BORING (NX SIZE) M 151.74 826.61 5.16 245.88 1,229.39
410 BRICK WORK CM 280.67 142.50 2,144.49 641.92 3,209.58
411 a STONE MASONRY RANDOM DRY CM 297.81 56.01 574.79 232.15 1,160.76
Page 123 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 348.06 84.89 1,364.77 449.43 2,247.15
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 403.57 56.01 635.31 273.72 1,368.61
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 459.07 84.89 1,415.94 489.98 2,449.88
411 g ROLL POINTING SM 59.79 5.78 46.91 28.12 140.60
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 594.83 134.30 1,344.57 518.43 2,592.13
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 175.00 230.36 400.70 201.52 1,007.58
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 168.57 297.19 516.18 245.49 1,227.43
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 171.84 514.83 636.99 330.92 1,654.58
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 176.67 639.81 955.50 443.00 2,214.98
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 202.52 704.13 1,291.04 549.42 2,747.11
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 251.53 868.93 1,946.07 766.63 3,833.16
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 325.51 961.94 2,435.14 930.65 4,653.24
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 380.80 1,168.07 3,400.23 1,237.28 6,186.38
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 454.89 1,362.74 5,156.73 1,743.59 8,717.95
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 175.00 263.77 425.36 216.03 1,080.16
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 168.57 297.19 552.26 254.51 1,272.53
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 168.09 514.83 665.85 337.19 1,685.96
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 176.67 639.81 1,021.88 459.59 2,297.95
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 202.52 704.13 1,802.93 677.40 3,386.98
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 251.53 868.93 2,454.80 893.82 4,469.08
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 325.51 961.94 3,127.87 1,103.83 5,519.15
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 380.80 1,168.07 4,088.78 1,409.41 7,047.06
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 454.89 1,362.74 5,632.02 1,862.41 9,312.06
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 72.45 68.08 512.73 163.32 816.58
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 655.92 309.47 2,402.05 841.86 4,209.30
507 a STEEL WIRE MESH FOR GABIONS KG 4.67 - 69.82 18.62 93.11
Page 124 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 73.88 - 274.37 87.06 435.31
508 a BRICK PAVING (SINGLE COURSE) SM 89.87 15.80 176.98 70.66 353.31
508 b BRICK PAVING (DOUBLE COURSE) SM 160.37 15.80 349.51 131.42 657.10
509 a RIP RAP CLASS "A" CM 395.05 - 503.41 224.62 1,123.08
509 b RIP RAP CLASS "B" CM 378.45 - 499.39 219.46 1,097.30
509 c RIP RAP CLASS "C" CM 380.88 - 503.41 221.07 1,105.36
509 d GROUTED RIP RAP CLASS "A" CM 469.10 35.09 1,547.30 512.87 2,564.36
509 e GROUTED RIP RAP CLASS "B" CM 452.24 28.07 1,435.15 478.87 2,394.33
509 f GROUTED RIP RAP CLASS "C" CM 445.72 23.39 1,461.07 482.55 2,412.73
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 637.05 181.56 2,771.45 897.52 4,487.58
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.81 115.89 414.28 141.75 708.73
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 85.74 194.57 - 70.08 350.39
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 126.19 35.01 81.80 60.75 303.75
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 161.52 44.81 104.71 77.76 388.80
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 205.92 91.01 272.10 142.26 711.29
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 257.40 113.77 340.13 177.83 889.13
603 BRICK EDGING M 7.32 - 26.40 8.43 42.15
605 a CONCRETE BEAM GUARDRAIL M 58.12 14.67 430.45 125.81 629.05
605 c CONCRETE POST FOR GUARDRAIL M 71.36 13.10 427.64 128.03 640.13
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 189.29 128.42 4,813.99 1,282.93 6,414.63
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 59.16 192.63 7,564.00 1,953.95 9,769.74
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 189.29 272.87 9,220.92 2,420.77 12,103.85
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 579.44 304.65 16,699.87 4,395.99 21,979.95
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 115.89 60.93 7,359.45 1,884.07 9,420.34
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 267.44 - 1,032.66 325.03 1,625.13
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 267.44 - 1,548.99 454.11 2,270.54
Page 125 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (64) Sibi
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.45 2.85 15.43 5.18 25.91
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.82 1.27 30.65 8.19 40.93
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.45 2.85 20.58 6.47 32.35
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.82 1.27 40.88 10.74 53.71
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 68.79 - 149.05 54.46 272.30
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 68.79 - 386.21 113.75 568.75
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.06 3.56 21.44 7.02 35.08
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.06 4.75 51.71 14.88 74.40
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.06 3.56 28.59 8.80 44.01
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.06 4.75 68.95 19.19 95.95
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 68.79 - 207.01 68.95 344.75
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 68.79 - 652.07 180.22 901.08
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 56.64 - 99.37 39.00 195.01
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 56.64 - 257.86 78.63 393.13
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 56.65 - 138.01 48.67 243.33
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 56.65 - 435.37 123.01 615.03
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.51 46.68 167.66 55.71 278.56
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.51 46.68 202.66 64.46 322.31
610 b RIGHT OF WAY MARKER EACH 78.13 60.88 213.00 88.00 440.01
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 519.40 476.40 1,441.39 609.30 3,046.49
610 d TEN KILOMETER POST EACH 998.30 952.79 3,140.97 1,273.02 6,365.08
Page 126 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.63 6.96 - 1.90 9.49
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.56 102.44 0.88 27.47 137.35
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 18.40 258.13 1.97 69.63 348.13
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 73.60 1,032.53 7.89 278.51 1,392.53
103 STRIPPING CM 2.45 59.42 - 15.47 77.34
104 COMPACTION OF NATURAL GROUND SM 0.35 5.92 0.62 1.72 8.61
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.70 86.79 - 22.87 114.36
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.99 193.76 46.20 89.99 449.94
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.88 214.84 - 57.68 288.40
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.70 167.12 - 44.46 222.28
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.85 78.63 - 20.62 103.10
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.99 193.76 46.20 89.99 449.94
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.08 199.88 - 54.74 273.70
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.09 167.24 - 43.83 219.16
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.63 89.04 0.31 24.25 121.23
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 61.46 165.86 53.31 70.16 350.79
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 106.02 258.51 30.80 98.83 494.16
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 88.78 193.04 - 70.46 352.28
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.53 160.37 - 53.73 268.63
107 d GRANULAR BACK FILL CM 31.52 83.07 291.33 101.48 507.40
107 e COMMON BACK FILL CM 22.11 37.31 4.13 15.89 79.44
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.67 106.71 4.13 29.38 146.89
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 18.99 302.97 48.81 92.69 463.46
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 14.24 268.11 1.96 71.08 355.39
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 12.66 238.60 - 62.82 314.08
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 7.48 112.14 6.81 31.61 158.04
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 127 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.99 46.31 4.13 14.11 70.54
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 13.64 73.87 2.45 22.49 112.45
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.34 16.84 1.18 4.84 24.20
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 1.00 10.31 0.63 2.99 14.93
110 IMPROVED SUB-GRADE CM 9.30 75.50 61.91 36.68 183.39
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.82 9.38 0.64 2.71 13.55
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.23 9.92 0.74 2.97 14.86
201 GRANULAR SUB-BASE CM 7.57 106.91 413.71 132.05 660.24
202 AGGREGATE BASE CM 8.62 132.11 546.14 171.72 858.59
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 63.29 916.98 3,399.24 1,094.88 5,474.39
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 65.74 916.98 3,625.65 1,152.09 5,760.46
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 71.20 957.74 3,393.94 1,105.72 5,528.60
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 71.20 954.75 3,707.96 1,183.48 5,917.39
204 b CEMENT STABLIZED BASE CM 26.02 272.73 674.48 243.31 1,216.54
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 243.85 568.44 22,276.80 5,772.27 28,861.36
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 243.85 568.44 21,456.72 5,567.25 27,836.26
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 80.90 55.65 577.11 178.42 892.08
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 133.63 1,408.67 3,065.25 1,151.89 5,759.44
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 87.95 66.68 474.94 157.39 786.96
207 a DEEP PATCHING (0-15 cm) SM 1.68 30.14 1.02 8.21 41.05
207 b DEEP PATCHING (16-30 cm) SM 1.68 26.47 1.02 7.29 36.46
208 REINSTATEMENT OF ROAD SURFACE SM 1.69 37.00 0.45 9.79 48.93
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.33 70.82 0.55 18.43 92.13
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.47 14.16 0.11 3.69 18.43
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.29 0.67 22.28 5.81 29.05
Page 128 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 0.67 22.28 5.81 29.04
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 9.91 2.57 12.83
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.58 2.23 11.16
304 a SINGLE SURFACE TREATMENT SM 0.74 4.16 42.59 11.87 59.36
304 b DOUBLE SURFACE TREATMENT SM 1.08 8.06 80.35 22.37 111.86
304 c TRIPPLE SURFACE TREATMENT SM 1.83 11.08 95.78 27.17 135.86
304 d SEAL COAT SM 0.68 2.33 25.51 7.13 35.65
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 60.42 906.07 3,975.66 1,235.54 6,177.69
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 60.42 876.73 4,288.41 1,306.39 6,531.95
307 a DENSE GRADED HOT BIT-MAC CM 141.38 171.48 3,288.51 900.34 4,501.71
307 b OPEN GRADED HOT BIT-MAC CM 141.38 171.48 3,191.89 876.19 4,380.94
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mmTHICK) CM 24.49 456.95 894.02 343.87 1,719.33
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 218.25 465.97 24,250.50 6,233.68 31,168.40
309 a COLD MILLING, 0 - 30 mm SM 0.89 16.87 7.54 6.33 31.63
309 b COLD MILLING, 0 - 50 mm SM 1.49 28.11 12.57 10.54 52.71
309 c COLD MILLING, 0 - 70 mm SM 2.23 42.16 18.85 15.81 79.05
401 ai CONCRETE CLASS "A3" (Underground) CM 482.21 643.62 3,210.98 1,084.20 5,421.01
401 aii CONCRETE CLASS "A3" (Onground) CM 482.21 643.62 3,419.88 1,136.43 5,682.14
401 aiii CONCRETE CLASS "A3" (Elevated) CM 482.21 643.62 3,837.68 1,240.88 6,204.39
401 b CONCRETE CLASS "B" CM 625.04 407.09 2,407.59 859.93 4,299.65
401 ci CONCRETE CLASS "C" (Underground) CM 469.22 258.76 2,870.86 899.71 4,498.55
401 cii CONCRETE CLASS "C" (Onground) CM 469.22 258.76 2,959.96 921.99 4,609.93
401 ciii CONCRETE CLASS "C" (Elevated) CM 469.22 258.76 3,138.15 966.53 4,832.66
401 d CONCRETE CLASS "D1" CM 749.58 810.64 4,112.04 1,418.07 7,090.33
401 e CONCRETE CLASS "Y" CM 1,049.24 258.76 3,516.52 1,206.13 6,030.65
401 f LEAN CONCRETE CM 389.43 252.12 1,932.98 643.63 3,218.16
Page 129 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,563.00 468.57 4,009.18 1,510.19 7,550.94
401 gii PRECAST CONCRETE CLASS "B" CM 1,563.00 468.57 3,574.37 1,401.49 7,007.43
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,492.45 - 44,726.75 11,554.80 57,774.00
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,492.45 - 45,776.75 11,817.30 59,086.50
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,178.02 2,335.68 37,991.02 10,376.18 51,880.90
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,254.49 6,882.66 81,656.03 22,698.30 113,491.48
405 b LAUNCHING OF GIRDER TON 52.05 403.69 - 113.94 569.68
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 102.52 - 194.52 74.26 371.30
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 102.52 - 203.23 76.44 382.19
406 c STEEL EXPANSION JOINTS KG 8.58 11.61 61.61 20.45 102.25
406 d WATER STOPS 6" SIZE M 87.14 - 306.16 98.33 491.63
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.02 - 1.22 0.31 1.55
406 f ASHPALT FELT (3 PLY) SM 38.14 - 1,414.34 363.12 1,815.60
406 g STEEL OR METAL BEARING DEVICES KG 17.95 30.66 81.91 32.63 163.15
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 285.32 847.08 888.63 505.26 2,526.29
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 427.98 1,270.62 1,332.94 757.89 3,789.43
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 427.98 1,270.62 999.99 674.65 3,373.24
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 713.30 2,117.70 1,208.31 1,009.83 5,049.14
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 611.40 1,815.17 1,133.91 890.12 4,450.60
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,069.95 3,176.55 1,554.65 1,450.29 7,251.44
407 h PILE LOAD TEST UPTO 120 TON EACH 17,540.10 19,990.40 72,546.36 27,519.22 137,596.08
407 i PILE LOAD TEST UPTO 240 TON EACH 34,809.30 19,990.40 145,092.72 49,973.11 249,865.53
407 j PILE LOAD TEST UPTO 360 TON EACH 52,344.90 19,990.40 217,639.08 72,493.60 362,467.98
407 k CONFIRMATORY BORING (NX SIZE) M 159.47 826.61 5.16 247.81 1,239.05
410 BRICK WORK CM 306.43 142.50 2,293.89 685.71 3,428.53
411 a STONE MASONRY RANDOM DRY CM 324.55 56.01 557.03 234.40 1,171.99
Page 130 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 381.92 84.89 1,342.75 452.39 2,261.95
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 441.99 56.01 780.52 319.63 1,598.15
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 502.06 84.89 1,562.46 537.35 2,686.76
411 g ROLL POINTING SM 65.05 5.78 47.04 29.47 147.34
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 655.96 134.30 1,491.08 570.34 2,851.68
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 201.37 230.36 400.96 208.17 1,040.86
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 194.72 297.19 516.49 252.10 1,260.50
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 194.13 514.83 637.26 336.56 1,682.78
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 201.33 639.81 955.87 449.25 2,246.26
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 231.86 704.13 1,291.41 556.85 2,784.25
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 287.54 868.93 1,946.71 775.80 3,878.98
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 372.11 961.94 2,436.01 942.52 4,712.58
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 436.91 1,168.07 3,401.28 1,251.57 6,257.83
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 520.49 1,362.74 5,157.95 1,760.30 8,801.48
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 201.37 263.77 424.74 222.47 1,112.35
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 194.72 297.19 552.57 261.12 1,305.60
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 190.13 514.83 666.12 342.77 1,713.85
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 201.33 639.81 1,022.12 465.82 2,329.08
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 231.86 704.13 1,803.60 684.90 3,424.49
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 287.54 868.93 2,455.44 902.98 4,514.89
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 372.11 961.94 3,128.74 1,115.70 5,578.49
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 436.91 1,168.07 4,089.83 1,423.70 7,118.51
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 520.49 1,362.74 5,633.25 1,879.12 9,395.60
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 82.20 68.08 279.62 107.48 537.38
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 702.74 309.47 2,463.15 868.84 4,344.20
507 a STEEL WIRE MESH FOR GABIONS KG 5.12 - 69.82 18.74 93.68
Page 131 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 85.49 - 495.83 145.33 726.65
508 a BRICK PAVING (SINGLE COURSE) SM 100.01 15.80 184.22 75.01 375.04
508 b BRICK PAVING (DOUBLE COURSE) SM 178.31 15.80 365.93 140.01 700.05
509 a RIP RAP CLASS "A" CM 436.28 - 485.65 230.48 1,152.41
509 b RIP RAP CLASS "B" CM 418.95 - 481.76 225.18 1,125.89
509 c RIP RAP CLASS "C" CM 421.34 - 485.65 226.75 1,133.74
509 d GROUTED RIP RAP CLASS "A" CM 530.74 35.09 1,634.70 550.13 2,750.66
509 e GROUTED RIP RAP CLASS "B" CM 511.26 28.07 1,526.27 516.40 2,582.00
509 f GROUTED RIP RAP CLASS "C" CM 504.34 23.39 1,553.93 520.42 2,602.08
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 701.78 181.56 2,852.14 933.87 4,669.35
509 h FILTER LAYER OF GRANULAR MATERIAL CM 42.68 115.89 291.59 112.54 562.70
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 90.03 194.57 - 71.15 355.75
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 139.05 35.01 78.92 63.25 316.23
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 177.98 44.81 101.02 80.95 404.76
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 226.04 91.01 260.14 144.30 721.49
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 282.55 113.77 325.17 180.37 901.86
603 BRICK EDGING M 8.12 - 29.28 9.35 46.75
605 a CONCRETE BEAM GUARDRAIL M 65.77 14.67 434.93 128.84 644.21
605 c CONCRETE POST FOR GUARDRAIL M 80.75 13.10 432.96 131.70 658.51
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 210.24 128.42 4,826.78 1,291.36 6,456.80
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 63.67 192.63 7,577.34 1,958.41 9,792.05
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 210.24 272.87 9,245.90 2,432.25 12,161.26
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 667.02 304.65 16,734.84 4,426.63 22,133.14
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 133.40 60.93 7,363.43 1,889.44 9,447.20
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 283.08 - 1,031.75 328.71 1,643.54
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 283.08 - 1,547.63 457.68 2,288.39
Page 132 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (70) Turbat
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.70 2.85 15.42 5.24 26.21
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.90 1.27 30.60 8.19 40.96
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.70 2.85 20.57 6.53 32.65
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.90 1.27 40.81 10.75 53.73
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 72.37 - 148.99 55.34 276.70
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 72.37 - 385.55 114.48 572.40
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.38 3.56 21.43 7.09 35.46
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.38 4.75 51.71 14.96 74.80
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.38 3.56 28.58 8.88 44.40
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.38 4.75 68.95 19.27 96.35
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 72.37 - 206.95 69.83 349.15
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 72.37 - 652.07 181.11 905.55
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 59.81 - 99.33 39.79 198.93
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 59.81 - 257.42 79.31 396.54
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 59.81 - 137.97 49.45 247.23
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 59.81 - 435.37 123.80 618.98
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 8.89 46.68 167.73 55.83 279.13
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 8.89 46.68 202.73 64.58 322.88
610 b RIGHT OF WAY MARKER EACH 89.98 60.88 216.74 91.90 459.50
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 577.76 476.40 1,462.98 629.29 3,146.43
610 d TEN KILOMETER POST EACH 1,113.68 952.79 3,203.64 1,317.53 6,587.64
Page 133 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
101 CLEARING AND GRUBBING SM 0.55 6.96 - 1.88 9.39
102 a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.87 102.44 0.88 27.30 136.49
102 b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.21 258.13 1.97 69.08 345.39
102 c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 64.85 1,032.53 7.89 276.32 1,381.59
103 STRIPPING CM 2.21 59.42 - 15.41 77.04
104 COMPACTION OF NATURAL GROUND SM 0.32 5.92 0.62 1.72 8.58
106 a EXCAVATE UNSUITABLE COMMON MATERIAL CM 4.54 86.79 - 22.83 114.16
106 bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 112.79 193.76 46.20 88.19 440.94
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.81 214.84 - 57.41 287.06
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.97 167.12 - 44.27 221.36
106 c EXCAVATE SURPLUS COMMON MATERIAL CM 3.71 78.63 - 20.59 102.93
106 di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 112.79 193.76 46.20 88.19 440.94
106 dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.97 199.88 - 54.46 272.31
106 diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.57 167.24 - 43.70 218.51
107 a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.23 89.04 0.31 24.15 120.73
107 b
STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW
WATER LEVEL CM 55.13 165.86 53.31 68.58 342.88
107 ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 99.86 258.51 30.80 97.29 486.46
107 cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 83.55 193.04 - 69.15 345.74
107 ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 51.36 160.37 - 52.93 264.66
107 d GRANULAR BACK FILL CM 28.44 83.07 277.36 97.22 486.09
107 e COMMON BACK FILL CM 18.96 37.31 4.13 15.10 75.50
108 a
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN COMMON MATERIAL CM 6.28 106.71 4.13 29.28 146.40
108 bi
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN HARD ROCK MATERIAL CM 17.54 302.97 48.81 92.33 461.65
108 bii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN MEDIUM ROCK MATERIAL CM 13.15 268.11 1.96 70.81 354.03
108 biii
FORMATION OF EMBANKMENT FROM ROADWAY EXCAVATION
IN SOFT ROCK MATERIAL CM 11.69 238.60 - 62.57 312.86
108 c
FORMATION OF EMBANKMENT FROM BORROW EXCAVTION IN
COMMON MATERIAL CM 6.95 112.14 6.81 31.48 157.38
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
Page 134 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
108 d
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN COMMON MATERIAL CM 5.60 46.31 4.13 14.01 70.05
108 e
FORMATION OF EMBANKMENT FROM STRUCTURAL
EXCAVATION IN ANY TYPE OF ROCK MATERIAL CM 12.47 73.87 2.45 22.20 110.99
109 a SUBGRADE PREPARATION IN EARTH CUT SM 1.25 16.84 1.18 4.82 24.09
109 bi
SUBGRADE PREPARATION IN EXISTIING ROAD WITHOUT ANY
FILL SM 0.93 10.31 0.63 2.97 14.84
110 IMPROVED SUB-GRADE CM 8.69 75.50 63.74 36.98 184.91
114 a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.75 9.38 0.64 2.69 13.46
114 b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.13 9.92 0.74 2.95 14.74
201 GRANULAR SUB-BASE CM 7.08 106.91 377.74 122.93 614.66
202 AGGREGATE BASE CM 8.37 132.11 477.72 154.55 772.75
203 a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 56.29 916.98 3,345.97 1,079.81 5,399.05
203 b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 58.75 916.98 3,583.05 1,139.70 5,698.48
203 c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 63.49 957.74 3,340.80 1,090.51 5,452.54
203 d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 63.49 954.75 3,666.82 1,171.27 5,856.33
204 b CEMENT STABLIZED BASE CM 24.83 272.73 559.93 214.37 1,071.86
204 d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 221.84 568.44 22,735.80 5,881.52 29,407.60
204 e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 221.84 568.44 21,915.72 5,676.50 28,382.50
205 a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 68.77 55.65 490.02 153.61 768.05
205 b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF LAYER CM 121.76 1,408.67 2,994.11 1,131.14 5,655.68
206 b
WATER BOUND MACADAM BASE WITH COARSE AGGREGATE
CLASS B CM 74.51 66.68 416.05 139.31 696.55
207 a DEEP PATCHING (0-15 cm) SM 1.56 30.14 1.02 8.18 40.90
207 b DEEP PATCHING (16-30 cm) SM 1.56 26.47 1.02 7.26 36.31
208 REINSTATEMENT OF ROAD SURFACE SM 1.63 37.00 0.45 9.77 48.85
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.15 70.82 0.55 18.38 91.90
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.43 14.16 0.11 3.68 18.38
302 a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 0.67 22.74 5.92 29.60
Page 135 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
302 b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 0.67 22.74 5.92 29.59
303 a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 10.09 2.61 13.05
303 b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.24 8.77 2.28 11.40
304 a SINGLE SURFACE TREATMENT SM 0.70 4.16 42.96 11.96 59.78
304 b DOUBLE SURFACE TREATMENT SM 1.02 8.06 80.53 22.40 112.01
304 c TRIPPLE SURFACE TREATMENT SM 1.73 11.08 95.58 27.10 135.49
304 d SEAL COAT SM 0.65 2.33 25.73 7.18 35.89
305 a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "A") CM 54.65 906.07 3,943.68 1,226.10 6,130.50
305 b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS "B") CM 54.65 876.73 4,259.34 1,297.68 6,488.40
307 a DENSE GRADED HOT BIT-MAC CM 128.48 171.48 3,265.31 891.32 4,456.59
307 b OPEN GRADED HOT BIT-MAC CM 128.48 171.48 3,162.92 865.72 4,328.60
308 a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.01 456.95 899.19 344.79 1,723.94
308 b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 196.25 465.97 24,709.50 6,342.93 31,714.65
309 a COLD MILLING, 0 - 30 mm SM 0.85 16.87 7.54 6.32 31.58
309 b COLD MILLING, 0 - 50 mm SM 1.41 28.11 12.57 10.52 52.61
309 c COLD MILLING, 0 - 70 mm SM 2.12 42.16 18.85 15.78 78.91
401 ai CONCRETE CLASS "A3" (Underground) CM 438.15 643.62 3,044.30 1,031.52 5,157.59
401 aii CONCRETE CLASS "A3" (Onground) CM 438.15 643.62 3,253.20 1,083.74 5,418.71
401 aiii CONCRETE CLASS "A3" (Elevated) CM 438.15 643.62 3,671.01 1,188.20 5,940.98
401 b CONCRETE CLASS "B" CM 568.40 407.09 2,278.82 813.58 4,067.89
401 ci CONCRETE CLASS "C" (Underground) CM 418.31 258.76 2,699.07 844.04 4,220.18
401 cii CONCRETE CLASS "C" (Onground) CM 418.31 258.76 2,788.17 866.31 4,331.55
401 ciii CONCRETE CLASS "C" (Elevated) CM 418.31 258.76 2,966.36 910.86 4,554.29
401 d CONCRETE CLASS "D1" CM 671.81 810.64 3,895.32 1,344.44 6,722.21
401 e CONCRETE CLASS "Y" CM 919.60 258.76 3,331.48 1,127.46 5,637.30
401 f LEAN CONCRETE CM 340.16 252.12 1,829.70 605.50 3,027.48
Page 136 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
401 gi PRECAST CONCRETE CLASS "A" CM 1,365.77 468.57 3,836.32 1,417.67 7,088.33
401 gii PRECAST CONCRETE CLASS "B" CM 1,365.77 468.57 3,436.51 1,317.71 6,588.56
404 a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,347.42 - 43,669.58 11,254.25 56,271.25
404 b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,347.42 - 44,719.58 11,516.75 57,583.75
404 h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A-36 TON 1,070.11 2,335.68 37,252.75 10,164.64 50,823.18
405 a
PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN
ALL RESPECT TON 2,204.54 6,882.66 81,643.69 22,682.72 113,413.61
405 b LAUNCHING OF GIRDER TON 50.73 403.69 - 113.61 568.03
406 a
PREMOULDED JOINT FILLER 12 mm THICK WITH BITUMASTIC
JOINT SEAL SM 91.45 - 203.33 73.70 368.48
406 b
NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH
BITUMASTIC JOINT SEAL SM 91.45 - 212.04 75.87 379.36
406 c STEEL EXPANSION JOINTS KG 7.56 11.61 60.08 19.81 99.06
406 d WATER STOPS 6" SIZE M 79.76 - 307.22 96.75 483.73
406 e
ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND
THICKNESS) ccm 0.01 - 1.22 0.31 1.54
406 f ASHPALT FELT (3 PLY) SM 33.15 - 1,417.25 362.60 1,813.00
406 g STEEL OR METAL BEARING DEVICES KG 15.99 30.66 80.62 31.82 159.09
407 d1
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN NORMAL SOIL M 274.68 847.08 890.13 502.97 2,514.86
407 d2
CAST IN PLACE CONCRETE PILES UPTO 0.76 M DIA BORING
ONLY IN GRAVEL STRATA M 412.02 1,270.62 1,335.19 754.46 3,772.29
407 d3
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN NORMAL SOIL M 412.02 1,270.62 1,002.49 671.28 3,356.41
407 d4
CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA BORING
ONLY IN GRAVEL STRATA M 686.71 2,117.70 1,212.48 1,004.22 5,021.11
407 d5
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN NORMAL SOIL M 588.61 1,815.17 1,137.48 885.32 4,426.58
407 d6
CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA BORING ONLY
IN GRAVEL SOIL M 1,030.06 3,176.55 1,560.90 1,441.88 7,209.39
407 h PILE LOAD TEST UPTO 120 TON EACH 17,483.04 19,990.40 70,992.28 27,116.43 135,582.15
407 i PILE LOAD TEST UPTO 240 TON EACH 28,904.64 19,990.40 141,984.56 47,719.90 238,599.50
407 j PILE LOAD TEST UPTO 360 TON EACH 43,583.04 19,990.40 212,976.84 69,137.57 345,687.85
407 k CONFIRMATORY BORING (NX SIZE) M 144.60 826.61 5.16 244.09 1,220.46
410 BRICK WORK CM 258.25 142.50 2,133.64 633.60 3,167.99
411 a STONE MASONRY RANDOM DRY CM 276.11 56.01 368.24 175.09 875.45
Page 137 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
411 b STONE MASONRY RANDOM WITH MORTAR CM 323.66 84.89 1,147.29 388.96 1,944.80
411 c STONE MASONRY DRESSED UNCOURSED DRY CM 373.77 56.01 415.92 211.43 1,057.13
411 d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 423.87 84.89 1,184.98 423.44 2,117.18
411 g ROLL POINTING SM 54.37 5.78 46.58 26.68 133.41
412 a STONE MASONRY DRESSED COURSED WITH MORTAR CM 551.53 134.30 1,113.60 449.86 2,249.29
501 a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 171.18 230.36 400.05 200.40 1,001.99
501 b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 164.85 297.19 515.41 244.36 1,221.81
501 c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 168.03 514.83 636.18 329.76 1,648.80
501 d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 173.21 639.81 954.50 441.88 2,209.40
501 e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 200.81 704.13 1,290.04 548.75 2,743.73
501 f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 250.56 868.93 1,944.55 766.01 3,830.05
501 g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 324.26 961.94 2,433.46 929.92 4,649.58
501 h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 381.21 1,168.07 3,398.18 1,236.87 6,184.33
501 i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 452.70 1,362.74 5,154.34 1,742.45 8,712.23
501 j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 171.18 263.77 424.94 214.97 1,074.86
501 k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 164.85 297.19 551.49 253.38 1,266.91
501 l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 164.03 514.83 665.04 335.98 1,679.88
501 m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 173.21 639.81 1,021.14 458.54 2,292.70
501 n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 200.81 704.13 1,801.63 676.64 3,383.21
501 o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 250.56 868.93 2,453.28 893.19 4,465.96
501 p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 324.26 961.94 3,126.19 1,103.10 5,515.49
501 q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 381.21 1,168.07 4,086.74 1,409.01 7,045.03
501 r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 452.70 1,362.74 5,629.63 1,861.27 9,306.34
502 a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CULVERT CM 71.63 68.08 248.54 97.06 485.31
502 b
CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF
CONCRETE PIPE CULVERT CM 640.24 309.47 2,330.48 820.05 4,100.24
507 a STEEL WIRE MESH FOR GABIONS KG 4.50 - 69.82 18.58 92.90
Page 138 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
507 b ROCK FILL IN GABIONS CM 73.20 - 283.15 89.09 445.44
508 a BRICK PAVING (SINGLE COURSE) SM 84.53 15.80 166.38 66.68 333.39
508 b BRICK PAVING (DOUBLE COURSE) SM 149.64 15.80 330.44 123.97 619.85
509 a RIP RAP CLASS "A" CM 367.99 - 296.86 166.21 831.06
509 b RIP RAP CLASS "B" CM 352.48 - 294.49 161.74 808.71
509 c RIP RAP CLASS "C" CM 353.84 - 296.86 162.68 813.38
509 d GROUTED RIP RAP CLASS "A" CM 438.03 35.09 1,326.37 449.87 2,249.36
509 e GROUTED RIP RAP CLASS "B" CM 420.90 28.07 1,217.12 416.52 2,082.61
509 f GROUTED RIP RAP CLASS "C" CM 414.20 23.39 1,247.09 421.17 2,105.85
509 g
REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT
REINFORCEMENT) CM 612.04 181.56 2,686.82 870.11 4,350.53
509 h FILTER LAYER OF GRANULAR MATERIAL CM 36.96 115.89 277.55 107.60 538.00
510 DISMANTLING OF STRUCTURE AND OBSTRUCTIONS CM 80.83 194.57 - 68.85 344.25
511 a1 DRY STONE PITCHING (15-20 cm Thick) SM 118.43 35.01 48.24 50.42 252.10
511 a2 DRY STONE PITCHING (21-25 cm Thick) SM 151.59 44.81 61.75 64.54 322.69
511 b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 191.67 91.01 230.78 128.37 641.83
511 b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 239.59 113.77 288.48 160.46 802.30
603 BRICK EDGING M 6.97 - 26.40 8.34 41.71
605 a CONCRETE BEAM GUARDRAIL M 55.73 14.67 423.44 123.46 617.30
605 c CONCRETE POST FOR GUARDRAIL M 68.43 13.10 419.52 125.26 626.31
607 a TRAFFIC ROAD SIGN CATEGORY 1 EACH 182.65 128.42 4,809.60 1,280.17 6,400.84
607 b TRAFFIC ROAD SIGN CATEGORY 2 EACH 55.77 192.63 7,558.37 1,951.69 9,758.46
607 c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 182.65 272.87 9,208.55 2,416.02 12,080.09
607 d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 564.08 304.65 16,690.29 4,389.76 21,948.78
607 e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 112.82 60.93 7,368.28 1,885.51 9,427.54
607 f ADDITIONAL PANEL SIZE 60 X 30 cms EACH 251.82 - 1,035.88 321.93 1,609.63
607 g ADDITIONAL PANEL SIZE 90 X 30 cms EACH 251.82 - 1,553.83 451.41 2,257.06
Page 139 / 140
General Revision- IV
CSR - 2005
CODE DESCRIPTION UNIT MANPOWER EQUIPMENT MATERIAL OH-PROFIT RATE
District (72) Zhob
Rate Analysis Summary ( Construction)
National Highway Authority
Islamabad
Quantity Surveying &
Estimation Specialist, NHA
608 b1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 15 cm WIDTH M 2.42 2.85 15.45 5.18 25.90
608 b2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 15 cm WIDTH M 0.81 1.27 30.84 8.23 41.15
608 c1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
LINES OF 20 cm WIDTH M 2.42 2.85 20.61 6.47 32.35
608 c2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
LINES OF 20 cm WIDTH M 0.81 1.27 41.13 10.80 54.01
608 d1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR 4.0
M ARROWS EACH 62.32 - 149.28 52.90 264.50
608 d2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 62.32 - 388.59 112.73 563.64
608 h1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
15 cm WIDTH M 3.03 3.56 21.46 7.01 35.06
608 h2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
15 cm WIDTH M 3.03 4.75 51.71 14.87 74.36
608 i1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES OF
20 cm WIDTH M 3.03 3.56 28.62 8.80 44.01
608 i2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES OF
20 cm WIDTH M 3.03 4.75 68.95 19.18 95.91
608 j1
PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M
ARROWS EACH 62.32 - 207.24 67.39 336.95
608 j2
PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M
ARROWS EACH 62.32 - 652.07 178.60 892.99
608 n1
PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR
STOP EACH 51.79 - 99.52 37.83 189.14
608 n2
PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR
STOP EACH 51.79 - 259.45 77.81 389.05
608 n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 51.79 - 138.16 47.49 237.44
608 n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 51.79 - 435.37 121.79 608.95
609 c
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
SINGLE) EACH 7.94 46.68 167.60 55.56 277.78
609 d
REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE -
DOUBLE) EACH 7.94 46.68 202.60 64.31 321.53
610 b RIGHT OF WAY MARKER EACH 76.39 60.88 208.48 86.44 432.19
610 c KILOMETER POST (0.610 X 0.114 X 1.5 M) EACH 487.66 476.40 1,408.19 593.06 2,965.31
610 d TEN KILOMETER POST EACH 940.22 952.79 3,060.87 1,238.47 6,192.35