List of Remainaing Activity As Per Original Schedule Up To 26Th of Aug

The document contains a list of activities for several well and plant numbers. There are 7 activities listed for each well/plant number including battery pad foundations and backfilling, cad welding, installation of grounding pit, fence posts, MP structure and other equipment, fencing, and grouting foundations. The activities are assigned identification numbers and include the well/plant number, organization, subcontractor, activity description, expected duration in days, new expected start and finish dates, and remarks section.

Uploaded by

raza.sliet
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views

List of Remainaing Activity As Per Original Schedule Up To 26Th of Aug

The document contains a list of activities for several well and plant numbers. There are 7 activities listed for each well/plant number including battery pad foundations and backfilling, cad welding, installation of grounding pit, fence posts, MP structure and other equipment, fencing, and grouting foundations. The activities are assigned identification numbers and include the well/plant number, organization, subcontractor, activity description, expected duration in days, new expected start and finish dates, and remarks section.

Uploaded by

raza.sliet
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

S.

No:
Well
No.:
Plant
No.:
SA
Organiza
tion
Subcont
ractor
Activity Description
Expected
Duration
(Days)
1.1
UTMN
511
431 SWID AMAM
Battery Pad Foundations and
Backfilling
1.2
UTMN
511
431 SWID AMAM Cad welding
1.3
UTMN
511
431 SWID AMAM Installation of Grounding Pit.
1.4
UTMN
511
431 SWID AMAM Installation of Fence Post
1.5
UTMN
511
431 SWID AMAM
Installation of MP Structure, RTU
sunshade, RMU and Instrument
Stand
1.6
UTMN
511
431 SWID AMAM Installation of Fencing.
1.7
UTMN
511
431 SWID AMAM Grouting on Foundation
2.1
UTMN
350
431 SWID AMAM
Battery Pad Foundations and
Backfilling
2.2
UTMN
350
431 SWID AMAM Cad welding
2.3
UTMN
350
431 SWID AMAM Installation of Grounding Pit.
2.4
UTMN
350
431 SWID AMAM Installation of Fence Post
2.5
UTMN
350
431 SWID AMAM
Installation of MP Structure, RTU
sunshade, RMU and Instrument
Stand
2.6
UTMN
350
431 SWID AMAM Installation of Fencing.
2.7
UTMN
350
431 SWID AMAM Grouting on Foundation
3.1
HWYH
134
431 SWID AMAM
Battery Pad Foundations and
Backfilling
3.2
HWYH
134
431 SWID AMAM Cad welding
3.3
HWYH
134
431 SWID AMAM Installation of Grounding Pit.
3.4
HWYH
134
431 SWID AMAM Installation of Fence Post
3.5
HWYH
134
431 SWID AMAM
Installation of MP Structure, RTU
sunshade, RMU and Instrument
Stand
3.6
HWYH
134
431 SWID AMAM Installation of Fencing.
LIST OF REMAINAING ACTIVITY AS PER ORIGINAL SCHEDULE UP TO 26TH OF AUG
3.7
HWYH
134
431 SWID AMAM Grouting on Foundation
4.1
HWYH
452
H01 SWID AMAM
Battery Pad Foundations and
Backfilling
4.2
HWYH
452
H01 SWID AMAM Cad welding
4.3
HWYH
452
H01 SWID AMAM Installation of Grounding Pit.
4.4
HWYH
452
H01 SWID AMAM Installation of Fence Post
4.5
HWYH
452
H01 SWID AMAM
Installation of MP Structure, RTU
sunshade, RMU and Instrument
Stand
4.6
HWYH
452
H01 SWID AMAM Installation of Fencing.
4.7
HWYH
452
H01 SWID AMAM Grouting on Foundation
New Expected Start Date
New Expected
Finish Date
Remarks
LIST OF REMAINAING ACTIVITY AS PER ORIGINAL SCHEDULE UP TO 26TH OF AUG