This report summarizes a workplace inspection conducted at the Green Spine zone to identify hazards before an estimated 5 hour stage construction event. Several hazards were identified including heavy equipment moving through pathways, manual handling of heavy materials and equipment, use of electrical equipment, and testing of fire/smoke equipment. Recommendations include providing adequate training to workers, increasing the number of workers, using trolleys to reduce manual handling, proper PPE, pre-inspecting tools, and erecting fences/barricades around water bodies to separate the work and water zones.

Uploaded by

Tazmir Omer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
149 views

GC3 Candidate Report Template7112013121134

This report summarizes a workplace inspection conducted at the Green Spine zone to identify hazards before an estimated 5 hour stage construction event. Several hazards were identified including heavy equipment moving through pathways, manual handling of heavy materials and equipment, use of electrical equipment, and testing of fire/smoke equipment. Recommendations include providing adequate training to workers, increasing the number of workers, using trolleys to reduce manual handling, proper PPE, pre-inspecting tools, and erecting fences/barricades around water bodies to separate the work and water zones.

Uploaded by

Tazmir Omer
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

APPENDIX 5

UNIT GC3 THE HEALTH AND Candidate report template


SAFETY PACTICAL APPLICATI!N
St"dent n"m#er$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
Lo%ation$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ Date o& re'ie( ) )
Structure report under the following headings:
Introd"%tion in%l"din* o'er'ie( o& area in+pe%ted and a%ti'itie+ ta,in* pla%e

Qatar Foundation Education City carrying out annual university event at the Green Spine
Zone 3 like every year, inclusive of a stage construction at the arena this year. his report follo!s a
!orkplace inspection to identify significant ha"ards and risks at Green spine to ensure a safe and
secure environ#ent. $n esti#ated % hours long stage construction and instal#ent of light and sound
e&uip#ents !ill take place. '( !orkers !ill !ork accordingly to co#plete the task. he area is
surrounded )y !ater front "ones on 3 sides. he only access to the site !ill )e continuously used
during the task.
*eavy e&uip#ents like cranes and #an lifts are not allo!ed !ithin the arena fearing the da#age it
#ay cause to the landscape and irrigation. $ll the re&uired e&uip#ents for the stage, light and sound
instal#ent !ill )e do!nloaded at the entrance and then #oved to their respective locations. his
process does increase the ha"ards in case of #anual handling. his inspection is done taking previous
year+s risk assess#ents and after event reports in consideration.
E-e%"ti'e S"mmar.
he ,andscaping, irrigation and housekeeping depart#ents are indeed doing a great help to the
!orkers )y provision of facilities !ith a high standard. -hatsoever, the inspection helped to identify
so#e serious ha"ards. *eavy e&uip#ents #oving through the university path!ays to access the "one
3 entrance, #anual handling of heavy !eight stage #aterial.e&uip#ents, using electrical
e&uip#ents at the site and #any other ha"ards that are not visi)le to naked eye. esting fire thro!ers
and s#oke )lo!ers for stage perfor#ances are other activities to have a potential to cause har#.
*aving !ell trained co#petent !orkers !ill help to co#plete the task !ith a safe and secure
environ#ent.
/eco##endations are to provide !orkers !ith ade&uate training, increasing the nu#)er of !orkers
and using trolleys to reduce or eli#inate the risks fro# #anual handling. 0roper 00E for the !orkers,
and pre inspected electrical and hand held tools to )e used )y co#petent !orkers. 1ne serious issue to
)e resolved at the site is the !ater )odies around the arena. his can )e done )y putting up a fence or
)arricades in order to separate or segregate the !ork "one fro# the !ater front area to eli#inate the
contact of !ater and electricity.
/ain &indin*+ o& t0e in+pe%tion
Con%l"+ion+
e%ommendation+ in%l"de a+ a ta#le in t0e &ollo(in* &ormat1
e%ommendation Li,el. re+o"r%e impli%ation+ Priorit. Tar*et date