Group C Department of Environmental Regulations No. Members Tasks Status of Completion List of Attachments Notes

Group C of the Department of Environmental Regulations submitted their weekly progress report for week 1. Five members were assigned tasks to gather information on environmental laws, discharge of gases and liquids, and treatment of discharges. All tasks were completed on time and their findings were attached to the report. The report was prepared by Nur Farhana and approved by the faculty advisor.

Uploaded by

fahna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

Group C Department of Environmental Regulations No. Members Tasks Status of Completion List of Attachments Notes

Group C of the Department of Environmental Regulations submitted their weekly progress report for week 1. Five members were assigned tasks to gather information on environmental laws, discharge of gases and liquids, and treatment of discharges. All tasks were completed on time and their findings were attached to the report. The report was prepared by Nur Farhana and approved by the faculty advisor.

Uploaded by

fahna
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

WEEKLY PROGRESS REPORT

WEEK 1 (15 September 2014-21 September 2014)


GROUP C
DEPARTMENT OF ENVIRONMENTAL REGULATIONS
No. Members Tasks Status of
Completion
List of Attachments Notes
1. Mohd Afiq Gather informations for environmental laws
in plant
COMPLETED PRINTED
JOURNALS/ ANY
TYPE OF
MATERIALS THAT
ARE RELATED

2. Mohd Hapizul Gather informations for discharge of gases COMPLETED
3. Mohd Ismail Gather informations for discharge of
liquids
COMPLETED
4. Muhd Zikri Gather informations for discharge of gases COMPLETED
5. Nur Farhana Gather information for type of treatment for
discharges
COMPLETED

PREPARED BY APPROVED BY
NUR FARHANA BINTI ABDUL KADIR

FACULTY OF ENGINEERING
Integrated Design (KNP 4414)
Semester 1 2014/2015
Project Log Book