Title : PRICE ANNEXURE -I
Sis Docu. Ref No. : SIS/EMIAL/QTN/ Date : 17/09/2014 Project : Muscat Cultural Complex - Fire proofing Client : Carrilion Alawi LLC Scope : Structural Steel INTUMESCENT Water Based Fire Proofing Design : Design Standards : BS476 Part 21. Fire Rating : 2 Hr
7 158.3333333 200
Total Cost of Application 305,280.00 Total Days 84.21 No. of Labors Labour Charge 151,578.95 9 8560 Food 154,080.00 Consumables 4,000.00 M/C 7,578.95 Mob/Demob 16,000.00 Omani Driver 13,927.13 165.3846154 Fuel Charge 2,105.26 Staff Visit 4,000.00 Total Cost 199,190.28 Profit 106,089.72 24.90 2.61 Labour Charge 50% Food 0% Consumables 1% M/C 2% Mob/Demob 5% Omani Driver 5% Fuel Charge 1% Staff Visit 1% Profit 35% Labour Charge Food Consumables M/C Mob/Demob Omani Driver Fuel Charge Staff Visit Profit