The document lists the major geothermal fields in the Philippines as of December 2005, providing their installed capacity in megawatts (MWe), the operator of the steamfield, and the operator of the power plant for each field. The largest fields were Tiwi at 344 MWe and Mak-Ban at 458.53 MWe, operated by Chevron Geothermal Philippines Holding, Inc. with power plants run by the National Power Corporation. In total, the geothermal fields had an installed capacity of 1977.69 MWe.
The document lists the major geothermal fields in the Philippines as of December 2005, providing their installed capacity in megawatts (MWe), the operator of the steamfield, and the operator of the power plant for each field. The largest fields were Tiwi at 344 MWe and Mak-Ban at 458.53 MWe, operated by Chevron Geothermal Philippines Holding, Inc. with power plants run by the National Power Corporation. In total, the geothermal fields had an installed capacity of 1977.69 MWe.
FIELD INSTALLED STEAMFIELD POWER PLANT CAPACITY (MWe)* OPERATOR OPERATOR
Tiwi 344 Chevron Geothermal Philippines Holding, Inc. National Power Corporation Mak-Ban 458.53 Chevron Geothermal Philippines Holding, Inc. National Power Corporation Tongonan 112.5 PNOC-Energy Development Corp. National Power Corporation Unified Leyte 610.18 PNOC-Energy Development Corp. CALENERGY/ORMAT Palinpinon I 112.5 PNOC-Energy Development Corp. National Power Corporation Palinpinon II 80 PNOC-Energy Development Corp. National Power Corporation Bacman I 110 PNOC-Energy Development Corp. National Power Corporation Bacman II 40 PNOC-Energy Development Corp. National Power Corporation Manito Lowlands 1.5 PNOC-Energy Development Corp. PNOC-Energy Development Corp. Mindanao I 54.24 PNOC-Energy Development Corp. Marubeni Mindanao II 54.24 PNOC-Energy Development Corp. Marubeni TOTAL 1977.69