No Model QTY/day Panel Qty / Rack Rack Qty/ Day Checking Time/panel (3 Panel Per Rack) Common Problems

The document outlines 4 models of electronic devices and their production details including daily quantities, number of panels per device, number of racks needed, time to check each panel, and common quality issues. It proposes in-house quality control inspection before devices undergo the mounting process to address recurring problems like missing components, incorrect component placement, and excess glue. The total estimated daily time to check all panels for the 4 models is 6.45 hours.

Uploaded by

Mohd Isa Harun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

No Model QTY/day Panel Qty / Rack Rack Qty/ Day Checking Time/panel (3 Panel Per Rack) Common Problems

The document outlines 4 models of electronic devices and their production details including daily quantities, number of panels per device, number of racks needed, time to check each panel, and common quality issues. It proposes in-house quality control inspection before devices undergo the mounting process to address recurring problems like missing components, incorrect component placement, and excess glue. The total estimated daily time to check all panels for the 4 models is 6.45 hours.

Uploaded by

Mohd Isa Harun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 1

No Model QTY/day Panel

Qty / rack
Rack
qty/ day
Checking time/panel
(3 panel per rack)
Common problems
1 TCJ 3400 15000 14 178 rack 178 *3* 30s=
16020sec (4.45 H)
Jumper missing, diode 3 (missing or replace
with jw) ,
led slant
Glue: missing , over glued, shifted
2 Apricot 1200 1500 14 26 26*3*30=
2340 sec (0.65H)
D7 reverse,
ZD2 reverse or tombstone,
D11 shifted
3 TKD-1700 /
2300
1800 14 32 32*3*30s=
2880 sec( 0.8H)
Solder side: various component missing, over
glue
4 Toto power
board/
controller
550 14 20 20*3*30 sec = (0.5H)
Total time taken = 6.45Hours
Proposal for In house QC inspection before hand mount process