This document outlines a poor performance improvement program for an employee named Nur Irruwan Bin Khalid. It describes issues with frequent absences and difficulty assigning work. The training plan requires advance leave approval and limits unpaid leave. Improvement targets are to have no unauthorized leave or consecutive absences over 3 months. The department head will recommend whether to continue, complete, or terminate the program.
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
27 views
Poor Performance Improvement Program
This document outlines a poor performance improvement program for an employee named Nur Irruwan Bin Khalid. It describes issues with frequent absences and difficulty assigning work. The training plan requires advance leave approval and limits unpaid leave. Improvement targets are to have no unauthorized leave or consecutive absences over 3 months. The department head will recommend whether to continue, complete, or terminate the program.
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4
KAGA COMPONENTS (M) SDN BHD
Name : Nur Irruwan Bin Khalid Emp no QA3767
Dept : QC Inspector Position : QC Inspector Poor Performance Description a) Having difficulties to come to work. a) b) Habit of taking leave and then apply the next day b) c) Supervisor is having difficulties to assign jobs due to this nature c) d) d) e) e) Training & Education Plan by Department Head (Supervisor) a) To submit leave application in advance directly by submitting leave to dept head. b) Leave taken without prior dept. head approval will be deemed as absent. c) d) e) Improvement Target Review Date Actual Results a) No leave without dept head approval a) a) b) No unpaid leave or absent for consecutive 3 months b) b) c) c) c) d) d) d) e) e) e) Department Head comments & recommendations (Please tick) a A Program continue B Program completed C Service to be terminated Department Head Employee received Review (Dept Head) Review (Employee) POOR PERFORMANCE IMPROVEMENT PROGRAM Reason / Root cause Copy & Paste Date : Date : Date : Date : Review (Employee) POOR PERFORMANCE IMPROVEMENT PROGRAM Reason / Root cause Copy & Paste